Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Cragg Cabin
1940s - 2.
Heavy Fill
1940 - 3.
Heavy Slide
1940 - 4.
Retaining Wall
1940 - 5.
Culvert Headwall
1940 - 6.
Grading
1940 - 7.
Tree Cutting Illegal
1940s - 8.
Goshen Creek Viaduct
1940s - 9.
Heavy Fill
1940 - 10.
Box Culvert
July 27, 1940 - 11.
Future Parkway Underpass Site at Aho Station
July 27, 1940 - 12.
Showing Location of Blowing Rock town dump
July 27, 1940 - 13.
Use made of land adjacent to Parkway during 1940 construction
July 27, 1940 - 14.
Site of future overpass at Station 477
July 27, 1940 - 15.
Wall detail
July 27, 1940 - 16.
12' x 12' Box Culvert at Station 347
July 27, 1940 - 17.
View from Blowing Rock Town Dump
July 27, 1940 - 18.
View from Blowing Rock town dump
July 27, 1940 - 19.
View into Blowing Rock town dump
July 27, 1940 - 20.
Showing the condition caused by the rains of August 13,1940.
August 17, 1940 - 21.
Shouls Creek during high water
August 17, 1940 - 22.
Blowing Rock Town power dam broken by rains of Aug 13, 1940
August 17, 1940 - 23.
After rains of August 13, 1940
August 18, 1940 - 24.
Stream Relocation
October 1, 1940 - 25.
Connection of Parkway with County Road to Blowing Rock
October 1, 1940 - 26.
Location of Proposed Parking Area
October 1, 1940 - 27.
Stream Relocation
October 1, 1940 - 28.
12' x 12' box culvert
October 1, 1940 - 29.
12" x 12" box culvert
December 1, 1940 - 30.
Location of proposed parking area
December 1, 1940 - 31.
Land Acquisition Maps Section 2-F
1941 - 32.
Grade Separation, South Abutment
June 30, 1941 - 33.
South Abutment, Grade Separation
June 30, 1941 - 34.
Proposed Location of Project 2-G near Blowing Rock
November 27, 1941 - 35.
Proposed Location of Project 2-G near Blowing Rock
November 27, 1941 - 36.
Proposed "A" Line of Section 2-G near Blowing Rock
December 9, 1941 - 37.
Proposed "A" Line of Section 2-G near Blowing Rock
December 9, 1941 - 38.
Proposed Location of Project 2-G near Blowing Rock
December 9, 1941 - 39.
Bamboo Triplett Road Northwest from center line proposed runway
August 26, 1945 - 40.
West from centerline proposed runway
August 28, 1945 - 41.
South along center line proposed runway
August 28, 1945 - 42.
East from centerline proposed runway
August 28, 1945 - 43.
Southwest from centerline proposed runway
August 28, 1945 - 44.
South along center line proposed runway
August 28, 1945 - 45.
From right of way opposite sta 455 left
August 28, 1945 - 46.
From right of way opposite Sta 455 left
August 28, 1945 - 47.
From right of way opposite Sta 455 left
August 28, 1945 - 48.
Northeast from centerline proposed runway
August 28, 1945 - 49.
East from centerline proposed runway
August 28, 1945 - 50.
From right of way opposite Sta 455 left
August 28, 1945 - 51.
Toward Parkway, vicinity Sta 450, on crest of ridge from Abo-Boone road
August 28, 1945 - 52.
North along proposed runway
August 28, 1945 - 53.
From right of way opposite Sta 455 left
August 28, 1945 - 54.
Northeast from centerline proposed runway
August 28, 1945 - 55.
Illegal cutting of timber by Electric Corp.
July 1946 - 56.
Illegal timber cutting by Electric Corp
July 1946 - 57.
Illegal timber cutting by Electric Corp
July 1946 - 58.
Illegal Timber Cutting by Electric Corp.
July 1946 - 59.
Illegal timber cutting by Electric Corp
July 1946 - 60.
Before Paving
September 1948 - 61.
2-F Viaduct
October 20, 1948
Items in Query
Section [Remove]
Starting Year [Remove]
Show All Results [Remove]
Ending Year [Remove]
Results: 61
Refine Your Search
Types (2)
Photographs (60) Maps (1)Locations (12)
Milepost 285 (18) Section 2F (14) Blowing Rock (9) Milepost 290 (6) Intersection of Blue Ridge Parkway at U.S. Route 221 (near Blowing Rock, N.C.) (5) Milepost 283 (2) Milepost 288 (2) Aho Station (1) Bamboo Gap (1) Goshen Creek Viaduct (1) See All ResultsSections (1)
2F (61)Counties (1)
Watauga (61)



