Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Detail Map
1936 - 2.
Bluff Park Bridle Trail, looking toward Bluff
January 5, 1936 - 3.
Bluff Park Culvert Grassy Gap Road
January 5, 1936 - 4.
Letter from Ida Clarkson Jones to Capus M. Waynick
January 12, 1936 - 5.
We Drivers: No. 7--Slippery Weather
January 30, 1936 - 6.
Highway Slaughter In N.C. In 1935 Is Really Appalling
January 30, 1936 - 7.
Motor Industry To Reduce Traffic Accidents
February 6, 1936 - 8.
We Drivers: No. 8--City Traffic
February 6, 1936 - 9.
Early Construction
August 2, 1936 - 10.
Early Construction
August 2, 1936 - 11.
The Bluffs, Sec 2C Rhododendron Valley from Inn site (Doughton Park)
August 2, 1936 - 12.
Chimney, clay-mortar stone. Holloway place
February 13, 1936 - 13.
Chimney, clay-mortar stone, Holloway place
February 14, 1936 - 14.
Chimney, clay mortar stone, Holloway place. Chimney details showing stone generally found along parkway, Sec 1P through 2F.
February 14, 1936 - 15.
Chimney, clay-mortar stone, Holloway place.
February 14, 1936 - 16.
Chimney, clay-mortar stone Holloway place
February 14, 1936 - 17.
Chimney, dry-laid stone. D.F. Wagoner place.
February 14, 1936 - 18.
Chimney, dry-laid stone. D. F. Wagoner place.
February 14, 1936 - 19.
Holloway Place
February 14, 1936 - 20.
Chimney dry-laid stone. D.F. Wagoner Place
February 14, 1936 - 21.
Retaining wall class B masonry See #5951
February 15, 1936 - 22.
Stone work detail Class B masonry retaining wall See neg# 5951
February 15, 1936 - 23.
Retaining wall, class B masonry
February 15, 1936 - 24.
Early Construction
February 2, 1936 - 25.
Retaining wall, Class B, masonry. See neg# 5951
February 15, 1936 - 26.
Dry Masonry Stone Foundation, slaty schist.
February 19, 1936 - 27.
Inlet headwall-pipe culvert
February 19, 1936 - 28.
Rock cut near South Fork New River
February 21, 1936 - 29.
House made of stone
February 21, 1936 - 30.
Jeff Anderson and some sample stone, 6 foot rule sample 6
February 21, 1936 - 31.
Vertical View of Ice Rock
February 26, 1936 - 32.
Overpass at Meadow Fork
March 4, 1936 - 33.
Parking area development in gap
April 5, 1936 - 34.
Looking west toward Buena Vista
April 5, 1936 - 35.
The Blue Ridge Parkway May Be Regarded As One Grand Step, Side By Side With Man's Progress
April 9, 1936 - 36.
Type #1 headwall, single
April 16, 1936 - 37.
Type #3 headwall, single
April 16, 1936 - 38.
General ground conditions showing stream conditions
April 16, 1936 - 39.
Arch-cut Stone, Double Box Culvert
April 16, 1936 - 40.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 41.
Arch + cut stone - double box culvert
April 16, 1936 - 42.
General ground conditions, showing erosion
April 16, 1936 - 43.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 44.
Type #1 Headwall, Single
April 16, 1936 - 45.
Early Construction
April 17, 1936 - 46.
The Bluff, View of Basin Cedar Ridge
April 20, 1936 - 47.
Picnic area before clearing operations
April 21, 1936 - 48.
Picnic area before clearing
April 21, 1936 - 49.
Recreational Area Table and Bench Types: Appalachian Parkway
April 22, 1936 - 50.
Road construction
April 27, 1936 - 51.
Cumberland Knob Picnic Area
April 28, 1936 - 52.
Cumberland Knob Picnic Area
April 28, 1936 - 53.
Masonry in retaining wall Class B
April 29, 1936 - 54.
Drilling Operations
May 2, 1936 - 55.
View of Wagon Drill
May 2, 1936 - 56.
Cut Slopes
May 7, 1936 - 57.
Fill and box culvert
May 7, 1936 - 58.
Fill and Box Culvert
May 7, 1936 - 59.
Stone Steps W.M.L. Miller's house, possible quarry
May 8, 1936 - 60.
Road relocation (pines to be welled)
May 8, 1936 - 61.
Grade crossing, Daniels Gap before revision
May 8, 1936 - 62.
Bridge Tunnel
May 15, 1936 - 63.
Submits Plan For Cherokee Parkway Link (Page 1 of 2)
May 17, 1936 - 64.
Submits Plan For Cherokee Parkway Link (Page 2 of 2)
May 17, 1936 - 65.
Should Solve The Problem
May 18, 1936 - 66.
Foght Predicts Land Swap Will Please Indians (Page 1 of 2)
May 20, 1936 - 67.
Foght Predicts Land Swap Will Please Indians (Page 2 of 2)
May 20, 1936 - 68.
Parkway Road
May 23, 1936 - 69.
Bridge Tunnel
May 23, 1936 - 70.
Bridge Tunnel
May 23, 1936 - 71.
Bridge Construction
May 23, 1936 - 72.
Parkway Road
May 23, 1936 - 73.
Parkway Road
May 23, 1936 - 74.
Parkway Road
May 23, 1936 - 75.
Parkway Road
May 23, 1936 - 76.
Heavy Machinery and Construction
May 23, 1936 - 77.
Masonry Wall
May 23, 1936 - 78.
Special headwall, Type #1 10' x 7' Box
May 25, 1936 - 79.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 80.
Cribbing check dams with brush back-fill
May 25, 1936 - 81.
Log cribbing and check for erosion control
May 26, 1936 - 82.
Log Cribbing and Check Dams for Erosion Control
May 26, 1936 - 83.
Log cribbing and check dams for erosion control
May 26, 1936 - 84.
Switchback on trail from Cumberland Knob, picnic area to gulley. Creek showing ramps.
May 30, 1936 - 85.
Open grassy area on Knob, looking west
May 30, 1936 - 86.
Clearing below Knob, Looking toward Spur
May 30, 1936 - 87.
Gwyn's rhododendron Mountain stream
June 2, 1936 - 88.
Construction of Crib-Work for Trail
June 2, 1936 - 89.
View of Cone Estate
June 2, 1936 - 90.
View of Cone Estate
June 2, 1936 - 91.
Gwyn's rhododendron. Heavily wooded and rocky mountain stream
June 2, 1936 - 92.
Gwyn's rhododendron Smaller falls
June 2, 1936 - 93.
View from Cone Estate
June 2, 1936 - 94.
Mountain Lake Pale and wooded shore line
June 2, 1936 - 95.
Lake basin
June 2, 1936 - 96.
County road relocation and crossing
June 3, 1936 - 97.
Tree Wall
June 3, 1936 - 98.
Early construction
June 3, 1936 - 99.
Trail Route, Before Construction "Indian Grave Trail"
June 15, 1936 - 100.
Cribbing of trail, almost complete "Spur Trail"
June 15, 1936 - 101.
Completed Trail, Indian Grave Trail
June 15, 1936 - 102.
Cribbing and trail, almost complete "Spur Trail"
June 15, 1936 - 103.
Completed Cribbing "Spur Trail"
June 15, 1936 - 104.
Completed Shuttle Trail, Looking Ahead
June 15, 1936 - 105.
Pre-Asphalt Road in Section 2A
June 23, 1936 - 106.
Detail View of Bridge #1 Construction
June 23, 1936 - 107.
Detail View of Bridge Site #6
June 23, 1936 - 108.
Coarse Stone Road in Section 2A
June 23, 1936 - 109.
Culvert at Station 517
June 23, 1936 - 110.
Detailed View of Bridge Abutment
June 23, 1936 - 111.
Bridge Site #10 Prior to Construction
June 23, 1936 - 112.
Channel Change at Bridge Site #10 (Section 2A)
June 23, 1936 - 113.
Bridge #6 During Construction (Section 2A)
June 23, 1936 - 114.
Unique Culvert Near Station 262
June 23, 1936 - 115.
Early Road Cut in Section 2A
June 23, 1936 - 116.
Early Construction
June 26, 1936 - 117.
Early Construction in section 2C
June 26, 1936 - 118.
Early Construction
June 27, 1936 - 119.
Proposed Parkway Crossing of NC Route 18 (1)
June 28, 1936 - 120.
Early Construction
June 28, 1936 - 121.
View of Proposed Crossing of NC 18 (2)
June 28, 1936 - 122.
Proposed Crossing of NC 18 (3)
June 28, 1936 - 123.
Proposed Site for Border of Section C and Section D
June 28, 1936 - 124.
Baffles
June 30, 1936 - 125.
Cement Masonry
June 30, 1936 - 126.
Lake Hare
June 30, 1936 - 127.
View from top of cut looking across corner of parking area toward the east.
July 1936 - 128.
Road construction
July 8, 1936 - 129.
Early Construction
July 13, 1936 - 130.
Right Hand Beam
July 13, 1936 - 131.
Section of Trail Under Construction - Gully Creek
July 14, 1936 - 132.
A Step Detail in Indian Grave Trail
July 14, 1936 - 133.
Bridge #1 left-handed beam
July 14, 1936 - 134.
4th switch and rest bench site
July 14, 1936 - 135.
Car on winding road
July 22, 1936 - 136.
Pre-Asphalt Parkway Near Virginia Border
July 22, 1936 - 137.
Workers and Machinery at Work in Section 2A
July 22, 1936 - 138.
Vehicle Tracks
July 22, 1936 - 139.
Early Construction of Bridge in Section 2A
July 22, 1936 - 140.
Partially Completed Overlook
July 22, 1936 - 141.
Side view Bridge Construction in Section 2A
July 22, 1936 - 142.
View of Machined-Flattened Parkway
July 22, 1936 - 143.
First Parkway Crossing of NC 18, Near Sparta, NC
July 22, 1936 - 144.
Early Construction
July 22, 1936 - 145.
Grade Correcting During Construction
July 22, 1936 - 146.
"Bridge 3" Construction in Section 2A
July 22, 1936 - 147.
Bridge Construction Site in Section 2A
July 22, 1936 - 148.
River/Trench
July 22, 1936 - 149.
Bridge Construction in Section 2A
July 22, 1936 - 150.
Cumberland Knob #1
July 23, 1936 - 151.
Unpaved Road #1
July 23, 1936 - 152.
Bridge site #1 east side looking north
July 23, 1936 - 153.
Cumberland Knob
July 23, 1936 - 154.
Line Guides
July 23, 1936 - 155.
Early Construction
July 23, 1936 - 156.
Bridge site east side looking south
July 23, 1936 - 157.
Paths
July 23, 1936 - 158.
Cement Rock Wall
July 23, 1936 - 159.
Shovel loading
July 23, 1936 - 160.
Path North over Proposed Bridge
July 23, 1936 - 161.
Road Between Hills
July 23, 1936 - 162.
Valley
July 23, 1936 - 163.
#9 Bridge
July 23, 1936 - 164.
Wall 611
July 23, 1936 - 165.
Under Drain
July 23, 1936 - 166.
Bridge 2
July 23, 1936 - 167.
Part of #2 Abutment Face
July 23, 1936 - 168.
Culvert Head Wall
July 23, 1936 - 169.
Drilling
July 23, 1936 - 170.
NC #104 Relocation, Sec 2M Parkway Access Drive
July 25, 1936 - 171.
Doughton Park #1
July 28, 1936 - 172.
steep side hill
July 28, 1936 - 173.
mixer
July 28, 1936 - 174.
Completed Rough Grade
July 28, 1936 - 175.
Early Construction
July 29, 1936 - 176.
Roadway
July 29, 1936 - 177.
Clearing operations
July 29, 1936 - 178.
Early Construction
July 31, 1936 - 179.
Vichity [Vicinity] of Roanoke, Va.
August 1936 - 180.
View toward Roanoke from point in proposed centerline of Parkway between Lynchburg Road and Coyner's Mountain
August 1936 - 181.
Early Construction
August 1936 - 182.
Wright Property, View Showing Small Pine Trees Cut by the Owner
August 1936 - 183.
Side view from Parkway showing prevalent type of fence and condition of all standing chestnut trees
August 1936 - 184.
Wright property. View showing small pine trees cut by the owner
August 1936 - 185.
Fern Covered Rock along Trail
August 1936 - 186.
County Road, vicinity of sec. 2D, looking south over ridges which carry parkway
August 1936 - 187.
Drilling and shoveling Operations
August 1936 - 188.
Drilling Operations. Looking across parkway line toward the west
August 1936 - 189.
The Peaks of Otter looking from road, Thaxton to Kelso
August 1936 - 190.
Cumberland Knob
August 1936 - 191.
Cumberland Knob waterfall
August 1936 - 192.
View from Top Looking Direction of Fishers Peak
August 1936 - 193.
Hiking Trail
August 1936 - 194.
Cumberland Knob Park Trail
August 1936 - 195.
View showing small pine trees cut by the owner, Wright property
August 1936 - 196.
View from top of cut opposite parking area looking north along line of parkway
August 1936 - 197.
View toward Buck Mtn. from proposed center line of Parkway between Buck Mtn. and Mason's Knob
August 1936 - 198.
Flat Top from trail up to Sharp Top
August 1936 - 199.
Fungus Growth Along Trail
August 1936 - 200.
View from Cumberland Knob
August 1936 - 201.
View toward Coyner's Mtn. from a point proposed centerline of Parkway
August 1936 - 202.
View south-west toward Mason's Knob from proposed center line of Parkway
August 1936 - 203.
Small waterfall, Camera placed at intersection of trail and stream
August 1936 - 204.
Waterfall Cumberland Knob
August 1936 - 205.
View from proposed center line of Parkway between Mason's Knob and Buck Mtn.
August 1936 - 206.
Meadow Fork - View looking south from edge of parkway
August 1936 - 207.
View looking south along parkway
August 1936 - 208.
View from Highest Point in Cumberland Knob
August 1936 - 209.
Bench along trail at a point 100 yards from picnic area.
August 1936 - 210.
View along trail
August 1936 - 211.
View of small waterfall. Camera at intersection of trail and stream
August 1936 - 212.
The Bluffs Sec 2C Wildcat Rocks, Inn site (Doughton Park)
August 3, 1936 - 213.
Wildcat Rocks
August 3, 1936 - 214.
Bridge site #6 Southwest wing wall
August 3, 1936 - 215.
Southeast wing wall
August 4, 1936 - 216.
Northwest wing wall. Bush Creek Bridge.
August 4, 1936 - 217.
Sweet Annie Hollow underpass under construction
August 4, 1936 - 218.
Bridge Site #6, Southwest Wing Wall, Pine Creek Bridge No. 6
August 4, 1936 - 219.
Bridge #6 Northwest wing wall
August 4, 1936 - 220.
Southwest wing wall
August 4, 1936 - 221.
Snaggy Bald Doubletop Mountain
August 11, 1936 - 222.
Mountains toward the south
August 11, 1936 - 223.
Snaggy Bald
August 11, 1936 - 224.
Fern Mountain Towards Bald
August 11, 1936 - 225.
Mayapple Gap - Doubletop Mountain
August 11, 1936 - 226.
Fern Mountain Valley toward Sylva
August 11, 1936 - 227.
Tuckaseegee River Valley
August 12, 1936 - 228.
Tuckaseegee River Valley
August 12, 1936 - 229.
Doubletop Mountain, Village of Webster in foreground
August 12, 1936 - 230.
Panorama of Proposed Parkway at Point North of Webster
August 13, 1936 - 231.
Willow planted along channel change, 10 days after planting
August 13, 1936 - 232.
Road Construction
August 14, 1936 - 233.
Proposed Tunnel Site
August 14, 1936 - 234.
Machinery and Hillside
August 14, 1936 - 235.
Super Reliance Grader "Caterpillar"
August 14, 1936 - 236.
View of Road Site
August 14, 1936 - 237.
Road View
August 14, 1936 - 238.
Road Construction
August 14, 1936 - 239.
Hand-laid rock embankment detail
August 14, 1936 - 240.
Road View
August 14, 1936 - 241.
Hand-laid rock embankment
August 14, 1936 - 242.
Hand-laid rock embankment construction
August 14, 1936 - 243.
Tunnel Construction
August 14, 1936 - 244.
Buck Creek Gap
August 14, 1936 - 245.
East along 104 NC Station 415
August 14, 1936 - 246.
Road Construction
August 14, 1936 - 247.
Road View
August 14, 1936 - 248.
Handlaid rock embankment
August 14, 1936 - 249.
Toe Ditch
August 14, 1936 - 250.
Road Construction
August 14, 1936 - 251.
Road Construction
August 14, 1936 - 252.
Early Construction
August 16, 1936 - 253.
Toe Ditch
August 17, 1936 - 254.
Koehring "Dumptor"
August 17, 1936 - 255.
View of Parkway
August 17, 1936 - 256.
View of Mountains
August 17, 1936 - 257.
Proposed Road Construction Site
August 17, 1936 - 258.
Linn Truck
August 17, 1936 - 259.
Construction Equipment
August 17, 1936 - 260.
Pipeline
August 17, 1936 - 261.
Toe Ditch
August 17, 1936 - 262.
Early Construction
August 19, 1936 - 263.
Road From Sparta To Roaring Gap May Be Improved
August 20, 1936 - 264.
Early Construction
August 20, 1936 - 265.
Mountain slope and construction
August 20, 1936 - 266.
Hand-placed rock wall
August 20, 1936 - 267.
Early Construction
August 20, 1936 - 268.
Early Construction
August 21, 1936 - 269.
Ahead at site of excavation for bridge #4.
August 22, 1936 - 270.
Bridge and Abutment Construction
August 22, 1936 - 271.
Bridge and Abutment Construction
August 22, 1936 - 272.
Bridge and Abutment Construction
August 22, 1936 - 273.
Bridge and Abutment Construction
August 22, 1936 - 274.
Bridge and Abutment Construction
August 22, 1936 - 275.
Bridge Construction
August 22, 1936 - 276.
Early Construction
August 22, 1936 - 277.
Bridge and Abutment
August 22, 1936 - 278.
Bridge 4, excavation site
August 22, 1936 - 279.
Bridge and Abutment Construction
August 22, 1936 - 280.
Retaining Wall
August 22, 1936 - 281.
Road View
August 22, 1936 - 282.
Road View
August 22, 1936 - 283.
Hare Mill Pond, scenic view
August 22, 1936 - 284.
Curved Head Wall
August 22, 1936 - 285.
Hare Mill Pond, scenic view
August 22, 1936 - 286.
Bridge Construction
August 22, 1936 - 287.
View of Parkway
August 22, 1936 - 288.
Excavation for tree well
August 23, 1936 - 289.
Bridge 10, site of construction
August 23, 1936 - 290.
Bridge 10, site of construction
August 23, 1936 - 291.
Rock wall on side of road
August 23, 1936 - 292.
Stone masonry wall
August 23, 1936 - 293.
Road construction
August 24, 1936 - 294.
View of Head Wall
August 24, 1936 - 295.
Early Construction
August 24, 1936 - 296.
Road construction
August 24, 1936 - 297.
Road construction
August 24, 1936 - 298.
Road construction
August 24, 1936 - 299.
Rock slope in woods
August 24, 1936 - 300.
Rough Grading Partially Complete
August 25, 1936 - 301.
Sweet Annie Hollow underpass after rough grading
August 25, 1936 - 302.
Bridge 10, site of construction
August 25, 1936 - 303.
South abutment
August 26, 1936 - 304.
After stream improvement
August 26, 1936 - 305.
Stone detail
August 26, 1936 - 306.
Close-up of plant group left of parkway
August 27, 1936 - 307.
Plant group left of parkway
August 27, 1936 - 308.
Plant group left of parkway
August 27, 1936 - 309.
View of Trail Leading to Cumberland Knob from the Parking Area
August 31, 1936 - 310.
Latest wagon drill in action. View looking south from point toward Bluffs
September 1936 - 311.
View of Mason's Knob taken from road leading to Knob from U.S. Route #11
September 1936 - 312.
Cabin within 100' right-of-way, looking north
September 1936 - 313.
View from proposed line of Parkway looking across valley from near Highco Mtn.
September 1936 - 314.
Bluffs Park, view from Wild Cat to Basin Creek
September 1936 - 315.
Side view from parkway near Ice Rocks
September 1936 - 316.
Peaks of Otter from road leading from Thaxton to Kelso
September 1936 - 317.
View from parkway looking east down small revine south of Knob
September 1936 - 318.
View from edge of parkway, 1 looking north along alignment towad Cumberland Knob Park Area
September 1936 - 319.
View looking south along parkway, showing construction operations
September 1936 - 320.
Clearing for road and new laurel growth
September 1936 - 321.
View of Rock cut looking south
September 1936 - 322.
View of small water fall and stream which crosses the trail at the point where the camera is placed
September 1936 - 323.
Construction of New Blue Ridge Parkway Means Much To Our County
September 3, 1936 - 324.
Bridge Site #6, Southwest Wing Wall Under Construction
September 4, 1936 - 325.
Bridge site #6 Southeast wing wall under construction
September 4, 1936 - 326.
View looking south along parkway
September 8, 1936 - 327.
Looking east toward Pilot Mountain which is shown very faintly in middle center of picture
September 8, 1936 - 328.
View of Fishers Peak from Trail
September 8, 1936 - 329.
View from Highest Point Looking Northeast
September 8, 1936 - 330.
View of parkway, looking north through wooded area. One of the few places where trees meet overhead.
September 9, 1936 - 331.
Intersection of North Carolina 18 and parkway View of parkway looking north
September 9, 1936 - 332.
View looking south on parkway showing construction and drilling operations
September 10, 1936 - 333.
View of log cabin in vicinity of parkway
September 10, 1936 - 334.
Natural reforestation This is not on the parkway but is within one-half mile of it.
September 10, 1936 - 335.
Cabin within 100 foot right-of-way of the Parkway.
September 10, 1936 - 336.
Valley farm land. This is near but not within sight of the parkway
September 11, 1936 - 337.
View of falls on Basin Creek
September 11, 1936 - 338.
View of wide, open area on top of the Bluffs. Looking north
September 11, 1936 - 339.
Property of Robert L. Doughton Opposite 2D
September 11, 1936 - 340.
View looking south along Ice Rock section of parkway
September 11, 1936 - 341.
View of the Bluffs from Basin Creek Valley near Alligator Back.
September 11, 1936 - 342.
Falls in Basin Creek Bluff Park
September 11, 1936 - 343.
View looking north along cut through Ice Rock section of Parkway near Bluffs Park area
September 11, 1936 - 344.
View of surrounding country taken from edge of parkway looking toward the left or east.
September 11, 1936 - 345.
View from right bank of road looking north showing a pine wooded area through which the parkway travels.
September 11, 1936 - 346.
The Bluffs from point 200 feet from the parkway south of the Bluffs
September 12, 1936 - 347.
Brush Creek Bridge #8, Pier from south
September 16, 1936 - 348.
Brush Creek Bridge #8 Pier
September 16, 1936 - 349.
Bridge #8 Pier
September 16, 1936 - 350.
Looking into Buena Vista from vicinity of proposed parkway
September 17, 1936 - 351.
Area at Otter Creek crossing showing pool
September 17, 1936 - 352.
Roaring Gap Hotel. South wing of hotel
September 18, 1936 - 353.
Right headwall culvert, Type 3
September 21, 1936 - 354.
Road construction
September 24, 1936 - 355.
Proposed Tunnel 1 End
September 25, 1936 - 356.
Rock Wall
September 25, 1936 - 357.
Bulldozers and Construction
September 25, 1936 - 358.
Road grading
September 25, 1936 - 359.
Near Entrance Tunnel #1
September 25, 1936 - 360.
Narrow Mountain Road
September 25, 1936 - 361.
Mountain Slope Road
September 25, 1936 - 362.
Road Grade and Chestnut Tree
September 25, 1936 - 363.
Cleared Roadway
September 25, 1936 - 364.
Part Road Grade
September 25, 1936 - 365.
Rock face and Side Slope
September 25, 1936 - 366.
Letter from Heriot Clarkson to J. P. Dodge
September 28, 1936 - 367.
View through pine looking south. Rattlesnake Mountain on the right of picture.
October 1936 - 368.
A view from the hillside opposite of the entrance to Cumberland Knob Park, looking across the Parkway to the park area
October 1936 - 369.
Access Road Construction
October 2, 1936 - 370.
Back from Station 5
October 4, 1936 - 371.
Proposed Route 18 Crossing
October 4, 1936 - 372.
Road Grade near NC Route 18
October 4, 1936 - 373.
Construction of prop. wall
October 4, 1936 - 374.
Mountain Valley and Barn
October 4, 1936 - 375.
#4 Bridge Construction
October 5, 1936 - 376.
#3 Bridge Construction
October 5, 1936 - 377.
Top of #4 Bridge
October 5, 1936 - 378.
Left Wing of Bridge #4
October 5, 1936 - 379.
Top of #4 Bridge
October 5, 1936 - 380.
View of Bridge 4 Abutment
October 5, 1936 - 381.
Stone Cement Gutter Construction
October 5, 1936 - 382.
Wood and Stone Bridge
October 5, 1936 - 383.
Construction at Bridge #4
October 5, 1936 - 384.
Floor and Side Forms of Bridge #8
October 5, 1936 - 385.
Stone Cement Gutter
October 5, 1936 - 386.
Construction on Bridge #8
October 5, 1936 - 387.
Stone Cement Gutter
October 5, 1936 - 388.
Cement Pouring at Bridge #10
October 5, 1936 - 389.
Looking north along parkway showing rock outcropping
October 11, 1936 - 390.
View looking south from wooded area into open meadow area.
October 12, 1936 - 391.
Parkway alignment, looking north
October 12, 1936 - 392.
View across parkway looking east into escarpment one-half mile south of Cumberland Knob
October 12, 1936 - 393.
View looking north along parkway
October 12, 1936 - 394.
View looking south on parkway
October 12, 1936 - 395.
View Looking South
October 12, 1936 - 396.
Road alignment looking back
October 13, 1936 - 397.
Rubble gutter treatment at intersection of secondary road
October 13, 1936 - 398.
Simple arch culvert on west side of parkway
October 13, 1936 - 399.
Detail of rubble gutter and tile underdrain emerging
October 13, 1936 - 400.
General view of road and gutter
October 13, 1936 - 401.
Rubble gutter completed
October 13, 1936 - 402.
Crushed stone base for rubble gutter
October 13, 1936 - 403.
Bridge #4 Stone detail on east side (Note scale stick)
October 13, 1936 - 404.
Gutter termination at pipe headwall
October 13, 1936 - 405.
View of alignment looking north near beginning of section
October 13, 1936 - 406.
Detail of rubble gutter - completed
October 13, 1936 - 407.
View of culvert
October 13, 1936 - 408.
Looking north along parkway one-half mile south of Cumberland Knob Park entrance
October 13, 1936 - 409.
View of alignment looking north near beginning of the section.
October 13, 1936 - 410.
View looking south along Parkway (Proposed cabin-gas road entrance at far end of cut on left).
October 13, 1936 - 411.
View looking south along parkway
October 13, 1936 - 412.
View looking north toward Pine Spur
October 13, 1936 - 413.
View looking north on parkway
October 13, 1936 - 414.
Road alignment through wooded section
October 13, 1936 - 415.
Gutter under construction
October 13, 1936 - 416.
View looking north along Parkway
October 14, 1936 - 417.
Looking North Along Parkway
October 14, 1936 - 418.
Grading, old N.C. #16 crossing
October 20, 1936 - 419.
View looking south along parkway, showing need of guard rail
October 20, 1936 - 420.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 421.
Typical country road through North Carolina section of parkway. This is a usual road in good weather.
October 20, 1936 - 422.
View of Tompkin's Knob, looking north. Parkway in middle left of picture.
October 20, 1936 - 423.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 424.
View of typical mountain cabin and surrounding area along road from Jefferson to Glendale Spring, NC (NC route 16)
October 20, 1936 - 425.
View of Alligator Back from point down the hill on the east side of the parkway
October 20, 1936 - 426.
300 feet from beginning of the section, view looking north along parkway
October 21, 1936 - 427.
Fireplace used in picnic area
October 21, 1936 - 428.
View of Rattle Snake Mountain looking north. Parkway in lower right-hand portion of picture
October 21, 1936 - 429.
Picnic Table
October 21, 1936 - 430.
Picnic table
October 21, 1936 - 431.
Near Saddle Mountain church. View of right side of two-arch culvert.
October 22, 1936 - 432.
Bridge #4 Detail of stone work; view of left side
October 22, 1936 - 433.
View of table rock formation in valley to the east of parkway
October 22, 1936 - 434.
Bridge #1 View of left side (looking south). Looking down stream
October 22, 1936 - 435.
View of left side, looking south, showing detail of stone work
October 22, 1936 - 436.
Team of Oxen Driven by Old Farmer
October 23, 1936 - 437.
Relation of Grading to "the Locusts" after Centerline Revision
October 24, 1936 - 438.
View from [Sharp Top Mountain] toward north
October 24, 1936 - 439.
Sharp Top Mtn.
October 24, 1936 - 440.
View looking up from within the Mons Hotel property
October 24, 1936 - 441.
View from [Sharp Top Mountain] towards Robinson Gap
October 24, 1936 - 442.
View from Sharp Top toward Flat Top
October 24, 1936 - 443.
Hand-laid rock embankment after cleanup
October 25, 1936 - 444.
Work on Culvert
October 28, 1936 - 445.
Work Across Intersection from 39-20
October 28, 1936 - 446.
Drop Inlet Station 29
October 28, 1936 - 447.
Cut Ditch and Bank
October 28, 1936 - 448.
Right Head Wall 289
October 28, 1936 - 449.
Farmhouse (probably razed)
October 28, 1936 - 450.
Partly Completed Parking
October 28, 1936 - 451.
Bridge #9 Abutment
October 29, 1936 - 452.
Bridge #6 Construction
October 29, 1936 - 453.
Dressed Slopes and Road Intersection
October 29, 1936 - 454.
Across Icy Rock Curve
October 31, 1936 - 455.
Icy Rock Curve
October 31, 1936 - 456.
Icy Rock Cut (2)
October 31, 1936 - 457.
Icy Rock Curve (2)
October 31, 1936 - 458.
Icy Rock Cut
October 31, 1936 - 459.
Icy Rock Cut (3)
October 31, 1936 - 460.
Right Head Wall 437
October 31, 1936 - 461.
Icy Rock Cut (4)
October 31, 1936 - 462.
Rough Grade Work
October 31, 1936 - 463.
Front Head Wall 437
October 31, 1936 - 464.
Icy Rock Curve (3)
October 31, 1936 - 465.
Left Head Wall 437
October 31, 1936 - 466.
Typical Coffee Shop and Gas Station
November 1936 - 467.
Typical Gas and Comfort Station
November 1936 - 468.
Excavation for Masonry Wall
November 6, 1936 - 469.
Mountain Slope
November 6, 1936 - 470.
Sample Wall
November 6, 1936 - 471.
Steep Mountain Slope
November 6, 1936 - 472.
Retaining Wall Construction
November 6, 1936 - 473.
Retaining Wall Construction
November 6, 1936 - 474.
Mountain Slope
November 6, 1936 - 475.
Road on Cliffside
November 9, 1936 - 476.
Cemented Rock Wall
November 9, 1936 - 477.
Blacksmith Shop
November 9, 1936 - 478.
Road Construction
November 9, 1936 - 479.
Road Through Rock
November 9, 1936 - 480.
Parkway at Hare Mill Pond
November 10, 1936 - 481.
Hare Mill Pond and secondary road
November 10, 1936 - 482.
Hare Mill Pond and road after clean-up
November 10, 1936 - 483.
View on top of the Bluff looking east
November 11, 1936 - 484.
Hand-laid rock embankment
November 11, 1936 - 485.
Crew working in cut
November 11, 1936 - 486.
Unmaintained county road parallel to parkway
November 11, 1936 - 487.
Parkway road and parking area
November 11, 1936 - 488.
Hand-placed rock embankment
November 11, 1936 - 489.
Hand-placed rock embankment
November 11, 1936 - 490.
Looking back at cut and general damage
November 11, 1936 - 491.
View of wide, open area on top of the Bluffs, looking north from point near Wild Cat Rocks
November 11, 1936 - 492.
Looking back at cut and general damage
November 11, 1936 - 493.
Ahead on Line
November 11, 1936 - 494.
View looking south across Ice Rock toward hand-laid rock embankmen
November 11, 1936 - 495.
View looking north across Ice Rock area
November 11, 1936 - 496.
View looking south along Parkway
November 11, 1936 - 497.
View from the Bluff looking west along line of Parkway
November 11, 1936 - 498.
Cut, before grading
November 14, 1936 - 499.
Drop Inlet and Cement Stone Masonry Apron
November 17, 1936 - 500.
Brush Creek Bridge #8
November 19, 1936 - 501.
Station 258 Sec 2B Hand-laid rock embankment
November 19, 1936 - 502.
View looking across parkway from east side of bridge
November 19, 1936 - 503.
Culvert at upper end of pond mill side.
November 19, 1936 - 504.
Close-up of hand-laid rock embankment
November 19, 1936 - 505.
Station 258, Sec 2B Rock spilled down mountain side
November 19, 1936 - 506.
Hand laid rock embankment showing small stone
November 19, 1936 - 507.
Bridge #6 Bridge from east side.
November 19, 1936 - 508.
Station 258, Sec 2B Rock fill adjacent to hand-laid rock embankment
November 19, 1936 - 509.
Station 258. Sec 2B Hand-laid rock embankment and rock fill being placed.
November 19, 1936 - 510.
General view showing machinery making fill through low wet area
November 25, 1936 - 511.
Arch of Bridge
December 1, 1936 - 512.
Bridge Construction
December 1, 1936 - 513.
Roadway
December 1, 1936 - 514.
Rounded Roadway
December 1, 1936 - 515.
Parking Overlook
December 1, 1936 - 516.
Bridge Construction
December 1, 1936 - 517.
Bridge Construction
December 1, 1936 - 518.
Pine Creek Bridge #4
December 1, 1936 - 519.
Bridge Construction
December 1, 1936 - 520.
Typical Gas and Comfort Station
December 1936 - 521.
Bridge Construction
December 1, 1936 - 522.
Bridge Frame
December 1, 1936 - 523.
Bridge Construction
December 1, 1936 - 524.
Overpass structure, Sweet Annie Hollow
December 1, 1936 - 525.
Bridgeway #2 and Parkway
December 2, 1936 - 526.
Retaining wall and bridge #2
December 2, 1936 - 527.
Close-up of Bridge #2
December 2, 1936 - 528.
Bridge No. 4
December 2, 1936 - 529.
Rock Quarry
December 5, 1936 - 530.
Rock Cutting
December 5, 1936 - 531.
Wood Pile
December 5, 1936 - 532.
HPRE Face
December 5, 1936 - 533.
Through Hills
December 5, 1936 - 534.
Stone Wall
December 5, 1936 - 535.
Prepared Road
December 5, 1936 - 536.
Road with Surface Stone
December 5, 1936 - 537.
Men at HPRE Wall
December 5, 1936 - 538.
Rock and Filling
December 7, 1936 - 539.
Station 386 Bridge #4
December 12, 1936 - 540.
Station 386 Bridge #4
December 12, 1936 - 541.
Pipe headwall, "backwall" and cobble gutter
December 13, 1936 - 542.
Typical riprap bank protection
December 13, 1936 - 543.
North Tunnel Portal
December 14, 1936 - 544.
South Tunnel Entrance
December 14, 1936 - 545.
Through Rough Rock
December 14, 1936 - 546.
Proposed Line
December 14, 1936 - 547.
Tunnel Entrance
December 14, 1936 - 548.
Cleared Path
December 15, 1936 - 549.
Shovel and Tractor
December 15, 1936 - 550.
Wagon Drill
December 15, 1936 - 551.
Trail
December 15, 1936 - 552.
Rough Road
December 15, 1936 - 553.
Excavation Cut
December 15, 1936 - 554.
Construction Slope
December 15, 1936
Refine Your Search
Types (5)
Photographs (535) Newspaper Articles (12) Drawings, Plans, and Projections (4) Letters (2) Maps (1)Locations (105)
Section 2A (82) Section 2M (58) Section 2C (41) Cumberland Knob (40) Milepost 225 (18) Milepost 224 (17) Milepost 217 (13) Milepost 227 (11) Milepost 218 (10) Milepost 228 (10) See All ResultsSections (24)
2A (251) 2C (80) 2M (61) 2B (40) 2D (30) 2E (16) 1K (8) 2W (8) 2G (6) 1N (5) 1P (5) 1R (4) 1F (3) 2L (3) 2Z (3) 1G (2) 1M (2) 1Q (2) 2H (2) 1D (1) 1S (1) 2F (1) 2J (1) 2N (1)Counties (20)
Alleghany (353) Yancey (62) Ashe (38) Wilkes (18) Watauga (9) Bedford (8) Floyd (7) Surry (7) Jackson (5) Roanoke (5) See All Results



