- 1.
Overpass Construction
20th Century - 2.
Backfilling 4x3 box culvert
June 20, year unknown - 3.
Dam
May 19, year unknown - 4.
Backfilling 4x3 culvert
June 20, year unknown - 5.
Dam
May 19, year unknown - 6.
Unidentified Construction
1930s - 7.
Middle Fork Bridge Under Construction
1930s - 8.
Bridge Construction
1930s - 9.
Linville Bridge
1930s - 10.
Construction of Pier #3
1930s - 11.
Section 2J, Selective Cutting
1930s - 12.
Back Pack Pmp Crates Fire Suppression
1930s - 13.
Men Working in Trench
1930s - 14.
Parkway Construction
1930s - 15.
Construction Site
1930s - 16.
Bridge Construction
1930s - 17.
Construction Workers
1930s - 18.
Stone Masons
1935 - 19.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 20.
First Gradeing Contract
September 1935 - 21.
Back of sample wall, showing same stone laid in a more informal treatment, etc
November 13, 1935 - 22.
Box culvert 8' x 6', 15° skew
November 26, 1935 - 23.
Rock filled tiled drain left of center line
November 26, 1935 - 24.
General view of construction rough grading
November 26, 1935 - 25.
Box culvert, 8' x 6', 15° skew
November 26, 1935 - 26.
Arch-cut Stone, Double Box Culvert
April 16, 1936 - 27.
Arch + cut stone - double box culvert
April 16, 1936 - 28.
Road construction
April 27, 1936 - 29.
Drilling Operations
May 2, 1936 - 30.
Bridge Tunnel
May 23, 1936 - 31.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 32.
Log cribbing and check for erosion control
May 26, 1936 - 33.
Construction of Crib-Work for Trail
June 2, 1936 - 34.
Completed Trail, Indian Grave Trail
June 15, 1936 - 35.
Cribbing and trail, almost complete "Spur Trail"
June 15, 1936 - 36.
Cribbing of trail, almost complete "Spur Trail"
June 15, 1936 - 37.
Cement Masonry
June 30, 1936 - 38.
Section of Trail Under Construction - Gully Creek
July 14, 1936 - 39.
Early Construction of Bridge in Section 2A
July 22, 1936 - 40.
Workers and Machinery at Work in Section 2A
July 22, 1936 - 41.
Early Construction
July 22, 1936 - 42.
"Bridge 3" Construction in Section 2A
July 22, 1936 - 43.
Drilling
July 23, 1936 - 44.
Cumberland Knob #1
July 23, 1936 - 45.
Cement Rock Wall
July 23, 1936 - 46.
Bridge site #1 east side looking north
July 23, 1936 - 47.
Cumberland Knob
July 23, 1936 - 48.
Part of #2 Abutment Face
July 23, 1936 - 49.
Shovel loading
July 23, 1936 - 50.
Early Construction
July 23, 1936 - 51.
NC #104 Relocation, Sec 2M Parkway Access Drive
July 25, 1936 - 52.
Clearing operations
July 29, 1936 - 53.
View from top of cut opposite parking area looking north along line of parkway
August 1936 - 54.
Drilling Operations. Looking across parkway line toward the west
August 1936 - 55.
Drilling and shoveling Operations
August 1936 - 56.
Fern Covered Rock along Trail
August 1936 - 57.
Sweet Annie Hollow underpass under construction
August 4, 1936 - 58.
Road Construction
August 14, 1936 - 59.
Road Construction
August 14, 1936 - 60.
Proposed Tunnel Site
August 14, 1936 - 61.
Tunnel Construction
August 14, 1936 - 62.
Machinery and Hillside
August 14, 1936 - 63.
Hand-laid rock embankment construction
August 14, 1936 - 64.
Linn Truck
August 17, 1936 - 65.
Koehring "Dumptor"
August 17, 1936 - 66.
Construction Equipment
August 17, 1936 - 67.
Bridge and Abutment Construction
August 22, 1936 - 68.
Bridge Construction
August 22, 1936 - 69.
Rock slope in woods
August 24, 1936 - 70.
South abutment
August 26, 1936 - 71.
View looking south along parkway, showing construction operations
September 1936 - 72.
Latest wagon drill in action. View looking south from point toward Bluffs
September 1936 - 73.
View looking south on parkway showing construction and drilling operations
September 10, 1936 - 74.
Road construction
September 24, 1936 - 75.
Part Road Grade
September 25, 1936 - 76.
Road grading
September 25, 1936 - 77.
Construction on Bridge #8
October 5, 1936 - 78.
Floor and Side Forms of Bridge #8
October 5, 1936 - 79.
Top of #4 Bridge
October 5, 1936 - 80.
Stone Cement Gutter
October 5, 1936 - 81.
#3 Bridge Construction
October 5, 1936 - 82.
Stone Cement Gutter
October 5, 1936 - 83.
Stone Cement Gutter Construction
October 5, 1936 - 84.
Top of #4 Bridge
October 5, 1936 - 85.
Gutter under construction
October 13, 1936 - 86.
Work on Culvert
October 28, 1936 - 87.
Bridge #9 Abutment
October 29, 1936 - 88.
Left Head Wall 437
October 31, 1936 - 89.
Excavation for Masonry Wall
November 6, 1936 - 90.
Retaining Wall Construction
November 6, 1936 - 91.
Retaining Wall Construction
November 6, 1936 - 92.
Blacksmith Shop
November 9, 1936 - 93.
Road Construction
November 9, 1936 - 94.
Crew working in cut
November 11, 1936 - 95.
Station 258, Sec 2B Rock spilled down mountain side
November 19, 1936 - 96.
Men at HPRE Wall
December 5, 1936 - 97.
Rock Quarry
December 5, 1936 - 98.
Tunnel Entrance
December 14, 1936 - 99.
Excavation Cut
December 15, 1936 - 100.
Shovel and Tractor
December 15, 1936 - 101.
Wagon Drill
December 15, 1936 - 102.
Men cleaning gutter
February 2, 1937 - 103.
Bridge Abutment
February 4, 1937 - 104.
Construction materials
February 4, 1937 - 105.
Road and tunnel
February 8, 1937 - 106.
Rock cut and tunnel
February 8, 1937 - 107.
Retaining Wall
February 8, 1937 - 108.
Riveters working
April 6, 1937 - 109.
Bridge Construction
April 10, 1937 - 110.
Detail of expansion dam
April 10, 1937 - 111.
View of bridge
April 10, 1937 - 112.
Detail of expansion dam
April 10, 1937 - 113.
Rail construction
April 10, 1937 - 114.
Road fill along edge of rough road
April 13, 1937 - 115.
Preparing Sub-Grade
April 14, 1937 - 116.
Sharp Curve Construction
April 14, 1937 - 117.
South End of Quarry
April 14, 1937 - 118.
Loading Holes for Blasting
April 14, 1937 - 119.
Construction of Tunnel #2
April 22, 1937 - 120.
Looking North Through Tunnel #2
April 22, 1937 - 121.
Masonry Wall Building
April 22, 1937 - 122.
Drill Operation
April 22, 1937 - 123.
Fire hazard reduction along trail. Belle Ridge
April 22, 1937 - 124.
Loading Rock at Retaining Wall
April 22, 1937 - 125.
Linn Tractor dumping
April 23, 1937 - 126.
Rough grade cut
April 23, 1937 - 127.
No.6 bridge, cost $15,139
May 4, 1937 - 128.
Bridge #2
May 25, 1937 - 129.
Drilling and Construction
May 26, 1937 - 130.
Wagon Drills
May 26, 1937 - 131.
Tree Well Construction
June 16, 1937 - 132.
Tree Well Construction
June 16, 1937 - 133.
Pier #1
June 22, 1937 - 134.
Pier #4
June 22, 1937 - 135.
Special drainage structure
June 22, 1937 - 136.
Culvert on side of slope above hollow
July 14, 1937 - 137.
Drilling and cleaning for stone wall at 255-35
July 28, 1937 - 138.
Preparations for Cement Wall
July 28, 1937 - 139.
Dumping of Construction Material for replacing embankment
July 28, 1937 - 140.
Quarry Operation for Masonry Material
August 5, 1937 - 141.
Partially Built Retaining Wall at 537
August 5, 1937 - 142.
Timber cutting and nuisance on right-of-way
August 7, 1937 - 143.
Road Construction at Station 32
September 4, 1937 - 144.
Gutter Work along Rock Face
September 4, 1937 - 145.
Icy Rock Retaining Wall with Crane
September 4, 1937 - 146.
Crushing Plant
September 9, 1937 - 147.
Gasoline Truck
September 14, 1937 - 148.
Gardner-Denver machinery
September 14, 1937 - 149.
View of viaduct under construction
October 4, 1937 - 150.
Gutter Construction
October 11, 1937 - 151.
Stone Gutter
October 11, 1937 - 152.
Team of Horses
October 12, 1937 - 153.
Man and a Horse Team
October 12, 1937 - 154.
Men Grading Slope
October 15, 1937 - 155.
Road to Lodge (under construction)
November 1937 - 156.
Road construction to picnic area
March 12, 1938 - 157.
Taken to show log corner detail -- underexposed
April 21, 1938 - 158.
60ft cut at Devils Garden
June 14, 1938 - 159.
South portal tunnel #1
June 25, 1938 - 160.
South portal tunnel #1
June 25, 1938 - 161.
Inside of wall parking area
July 11, 1938 - 162.
Retaining Wall Picnic Area
July 12, 1938 - 163.
Excavating through rock for culvert
July 28, 1938 - 164.
Construction of Camp Creek Bridge
August 12, 1938 - 165.
Example of good alignment without layout but with good inspection parapet wall
August 31, 1939 - 166.
Entrance road to lodge site
September 28, 1938 - 167.
Clearing for Water Supply Reservoir
September 28, 1938 - 168.
Slope during grading
October 1938 - 169.
Slope before grading. Showing steep over-burden and talus concealing rock. Ledges before grading.
October 1938 - 170.
Slope during grading
October 1938 - 171.
Slope during grading
October 1938 - 172.
Slope during grading
October 1938 - 173.
Expansion joints at junction of spandrel and wing walls
October 18, 1938 - 174.
Southwest wing and Spandrel Wall Masonry, under men to be removed because of stacking
October 18, 1938 - 175.
Oblique view
January 10, 1939 - 176.
South face
January 10, 1939 - 177.
Finishing first section of dam
January 11, 1939 - 178.
Construction road to stable site
March 25, 1939 - 179.
Pouring Concrete
March 25, 1939 - 180.
Wall Excavation
May 3, 1939 - 181.
Workers and wall construction
May 24, 1939 - 182.
Rock Drilling
May 24, 1939 - 183.
Rock cut
August 8, 1939 - 184.
Building Overpass
September 9, 1938 - 185.
Overpass Structure 2D-4 North Elevation
September 9, 1938 - 186.
Unstable rock cut during L.D. grading
October 6, 1939 - 187.
Foundation - Equipment storage and office building CCC job 142
November 1939 - 188.
Workers at landslide
November 7, 1939 - 189.
Tye River Gap bridge construction
1940s - 190.
Fence Repair
1940s - 191.
Grading
1940 - 192.
763-B Comfort station & trail shelter picnic area #3, Bluff Park, sec. 2-C
1940 - 193.
Radio Tower and House
1940 - 194.
Caretaker - Moses H. Cone Memorial Park
1940s - 195.
Looking north on parkway showing planting
1940 - 196.
Tye River Gap bridge construction
1940s - 197.
Tye River Gap bridge construction
1940s - 198.
Tye River Gap bridge completion
1940s - 199.
Tye River Gap Bridge construction
1940s - 200.
Tye River Gap bridge construction
1940s - 201.
Rock slide Bluff Park Heavy maintenance
1940s - 202.
Complete Slide from Cut
August 16, 1940 - 203.
Flood damage to viaduct
August 16, 1940 - 204.
Fancy Gap Overpass
November 18, 1940 - 205.
Overpass ringstones
November 18, 1940 - 206.
Overpass ringstones
November 18, 1940 - 207.
Fancy Gap Overpass
November 21, 1940 - 208.
Fancy Gap Overpass
November 21, 1940 - 209.
Blacksmith and Repair Garage (construction)
1941 - 210.
Office and Tool Storage Building
1941 - 211.
Trench
March 28, 1941 - 212.
Wall Construction
April 10, 1941 - 213.
Incinerator Construction
October 1941 - 214.
Incinerator Construction
October 1941 - 215.
Incinerator Construction progress
November 1941 - 216.
Brinegar ?Cabin Hewing north sill
November 1941 - 217.
Incinerator Construction progress
November 1941 - 218.
Brinegar Cabin Hewing log for north sill WPA labor
November 1941 - 219.
Brinegar Cabin riving roof boards
January 1942 - 220.
Brinegar Cabin Spring House Reframing Details
January 1942 - 221.
Brinegar Cabin Store House
February 1942 - 222.
Snow, WPA clearing the road
March 1942 - 223.
Work Started On Third Tunnel On Parkway, Will be 340 Feet Long
April 23, 1942 - 224.
Flume construction-main branch
June 1942 - 225.
Blacksmith Shop (Making shakes)
June 1942 - 226.
Flume construction-main branch
June 1942 - 227.
Mabry Mill - Residence to be removed
June 1942 - 228.
Water-wheel shaft in place
June 1942 - 229.
Blacksmith Shop
June 1942 - 230.
30" timber for water-wheel shaft
June 1942 - 231.
Flume construction-main branch
June 1942 - 232.
Flume construction-main branch
June 1942 - 233.
Clearing-Mill Pond Site
June 1942 - 234.
Water-wheel shaft
June 1942 - 235.
Water-wheel construction
July 1942 - 236.
Water-wheel construction
July 1942 - 237.
Water-wheel construction
July 1942 - 238.
Water-wheel construction
July 1942 - 239.
Water-wheel construction
July 1942 - 240.
Water-wheel construction
July 1942 - 241.
Water-wheel construction
July 1942 - 242.
Spreading Calcium Chloride
July 7, 1942 - 243.
Removing Rock Slide
July 7, 1942 - 244.
Removing rock slide from ditch line
August 26, 1942 - 245.
Riving "boards" from "bolt"
November 1942 - 246.
Tire bending rack
November 1942 - 247.
Contractor Finishes Seven-Mile Section of Parkway This Week (Page 1 of 2)
November 12, 1942 - 248.
Contractor Finishes Seven-Mile Section of Parkway This Week (Page 2 of 2)
November 12, 1942 - 249.
Planting potatoes. W.M. Shuffler lease. The seed is being covered with a plow.
Spring 1944 - 250.
Brinegar Cabin Southwest Corner
December 1944 - 251.
Inside Tunnel
June 17, 1947 - 252.
Peaks of Otter terminal area, stone curb construction
July 23, 1947 - 253.
Peaks of Otter terminal, stone curb construction
July 23, 1947 - 254.
Peaks of Otter bus terminal area. Stone curb construction.
July 23, 1947 - 255.
Peaks of Otter terminal area. Stone curb construction
July 23, 1947 - 256.
During preparatory grading before planting
October 30, 1947 - 257.
Excavation for pedestrian shelter
April 1949 - 258.
Men At Work
March 30, 1953 - 259.
Road Construction
April 3, 1953 - 260.
Quarry Drilling
June 3, 1953 - 261.
Drilling
May 5, 1954 - 262.
Drilling for Blasting in a Mica Mine in North Carolina
1955 - 263.
Drilling for blasting in open pit feldspar mine North Carolina
1955 - 264.
Processing Mica
1955 - 265.
Pipeline
April 28, 1955 - 266.
Construction Site
May 4, 1955 - 267.
@1, Cane Mill in Operation
September 1955 - 268.
#3 Boiling Off
September 1955 - 269.
Sherrill Cove Tunnel
1956 - 270.
Reconstruction of Mathews [Matthews] Cabin at Mabry Hill
November 26, 1956 - 271.
Reconstruction of Mathews [Matthews] Cabin at Mabry Mill
November 26, 1956 - 272.
Reconstruction of Mathews [Matthews] Cabin at Mabry Mill
November 26, 1956 - 273.
Reconstruction of Mathews [Matthews] Cabin at Mabry Hill
November 26, 1956 - 274.
Slide after Storm Damage
February 6, 1957 - 275.
Fill Slide
April 5, 1957 - 276.
Wildacres Tunnel
April 11, 1957 - 277.
Bridge Construction
July 30, 1957 - 278.
Bridge Construction
October 8, 1957 - 279.
Applying commercial fertilizer to Road Shoulders, Blue Ridge Parkway
March 24, 1958 - 280.
Oconeeluftee River Bridge Sub-Structure
May 1958 - 281.
Oconeeluftee River Bridge Sub-structure
May 1958 - 282.
Mission 66 sign
August 22, 1958 - 283.
Mission 66 Sign
August 22, 1958 - 284.
Mission 66 sign
August 22, 1958 - 285.
Concrete Placement
April 15, 1959 - 286.
Concrete Mixing
April 15, 1959 - 287.
Deck reinforcement - bridge south of Roanoke
June 1959 - 288.
Hydroseeder, Left on Parkway, Headed North
June 19, 1959 - 289.
Soil spreader on rt. shoulder headed north
June 19, 1959 - 290.
Deck Forming Operation
July 14, 1959 - 291.
Excavation - Lodge Site, Peaks of Otter
January 21, 1960 - 292.
Excavation - Lodge Site, Peaks of Otter
January 21, 1960 - 293.
Concession Facilities - Motel
April 19, 1963 - 294.
Trail Construction
April 25, 1963 - 295.
Trail Construction
April 25, 1963 - 296.
Motel Construction, Peaks of Otter
May 6, 1963 - 297.
Motel Construction
May 6, 1963 - 298.
Mulching Seeded Slope - APW Program
May 9, 1963 - 299.
Bridge Construction
October 1964 - 300.
Parkway Maintenance
1970s - 301.
Flat Rock Trail Repair
1970s - 302.
Flat Rock Trail Repair
1970s - 303.
Road Striping - Yellow
June 5, 1973 - 304.
Road Stripping - Yellow Road
June 5, 1973 - 305.
Mowing
June 5, 1973 - 306.
Road Striping - Yellow Paint
June 5, 1973 - 307.
Road Striping - Yellow Line
June 5, 1973 - 308.
Construction Work
September 18, 1973 - 309.
Construction Work
September 18, 1973 - 310.
Construction Work
September 18, 1973 - 311.
Grandfather Mtn. Construction
October 23, 1973 - 312.
Grandfather Mtn. Construction
October 23, 1973 - 313.
Grandfather Mtn. Construction
October 23, 1973 - 314.
Grandfather Mtn. Construction
October 23, 1973 - 315.
Landslide
October 30, 1973 - 316.
Southern Pine Bark Beetle
February 7, 1974 - 317.
Crafts - Mining Emeralds
June 6, 1974 - 318.
Summer Employees at Work
July 3, 1974 - 319.
Summer Employees at Work
July 3, 1974 - 320.
Humpback Rocks Visitor Center
July 21, 1974 - 321.
James Blocker - Procurement Clerk
September 1974 - 322.
Ina Underwood - Personnel
September 1974 - 323.
Janitor for Northwestern Bank Bldg.
September 1974 - 324.
Flat Top Manor Windows Bldg. #359
August 22, 1975 - 325.
Test drilling for Parkway connection
August 31, 1976 - 326.
Repairs on the Irwin's View Trail
October 14, 1976 - 327.
Road repair - asphalt
October 14, 1976 - 328.
Road repair - asphalt
October 14, 1976 - 329.
Park Service Personnel at work (taken by request for G. Stork)
October 18, 1977 - 330.
Park Service Personnel at work (taken by request for G. Stork)
October 18, 1977 - 331.
Park Service Personnel at work (taken by request for G. Stork)
October 18, 1977 - 332.
Park Service Personnel at work (taken by request for G. Stork)
October 18, 1977 - 333.
Repairing Parkway near Alta Pass
July 1978 - 334.
YACC Blog Trail
August 18, 1978 - 335.
Construction at Grandfather Mtn.
September 22, 1978 - 336.
Construction at Grandfather
September 22, 1979 - 337.
Grandfather Mtn. Construction
September 22, 1979 - 338.
Construction at Grandfather
September 22, 1979 - 339.
Construction at Grandfather
September 22, 1979 - 340.
Construction at Grandfather
September 22, 1979 - 341.
Construction at Grandfather Mtn.
September 22, 1979 - 342.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 343.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 344.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 345.
Grandfather Mtn. Road/Bridge Cosntruction
October 2, 1981 - 346.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 347.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 348.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 349.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 350.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 351.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 352.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 353.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 354.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 355.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 356.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 357.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 358.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 359.
Oral History Interview with Bernard Turner, July 11, 1996
July 11, 1996 - 360.
Water-wheel
- 361.
Construction - Grandfather Mountain
October 18, 1973 - 362.
Oral History Interview with Dillard Teer, January 20, 1997
January 20, 1997 - 363.
Flat Rock Trail Repair
- 364.
Former Asst. Maint. Chief (Left) Pete Stout and (L to R) Harold Stewart, Taylor Sutton, Charles Breedlore, & Dick Steeves
- 365.
Flat Rock Trail Repair
Refine Your Search
Types (3)
Photographs (360) Newspaper Articles (3) Oral Histories (2)Locations (110)
Section 2M (40) Grandfather Mountain (25) Mabry Mill (Va.) (25) Section 2C (24) Section 2A (23) Cumberland Knob (12) Undetermined (8) Asheville (7) Doughton Park (7) Brinegar Cabin (6) See All ResultsSections (31)
2A (62) 2C (54) 2M (48) 2H (32) 1T (25) 2L (15) 1K (12) 2G (11) 2J (10) 2D (9) See All ResultsCounties (25)
Alleghany (117) Yancey (49) Avery (43) Floyd (28) Buncombe (18) Watauga (13) Bedford (12) Ashe (10) McDowell (10) Wilkes (9) See All Results