Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Maintenance
20th Century - 2.
Mountain Side
20th Century - 3.
View of Road Construction from Tunnel
20th Century - 4.
Road
20th Century - 5.
Road Repair
20th Century - 6.
Blue Ridge Parkway scenery
20th Century - 7.
Overpass
1930s - 8.
Parkway Road Construction
1930s - 9.
Access road on left of Parkway
1930s - 10.
Opposite Woodruff's
1930s - 11.
Blue Ridge Parkway, scenic view of pond
1930s - 12.
View on parkway
1930s - 13.
Post construction forces scaling tunnel
1930s - 14.
Blowing Rock
December 20, 1934 - 15.
Blowing Rock
December 20, 1934 - 16.
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935 - 17.
General view of construction rough grading
November 26, 1935 - 18.
Motor Industry To Reduce Traffic Accidents
February 6, 1936 - 19.
Early Construction
April 17, 1936 - 20.
Cut Slopes
May 7, 1936 - 21.
Parkway Road
May 23, 1936 - 22.
Parkway Road
May 23, 1936 - 23.
Parkway Road
May 23, 1936 - 24.
Parkway Road
May 23, 1936 - 25.
Parkway Road
May 23, 1936 - 26.
Coarse Stone Road in Section 2A
June 23, 1936 - 27.
Early Road Cut in Section 2A
June 23, 1936 - 28.
Pre-Asphalt Road in Section 2A
June 23, 1936 - 29.
Early Construction
June 26, 1936 - 30.
Early Construction
June 28, 1936 - 31.
Lake Hare
June 30, 1936 - 32.
Road construction
July 8, 1936 - 33.
Pre-Asphalt Parkway Near Virginia Border
July 22, 1936 - 34.
First Parkway Crossing of NC 18, Near Sparta, NC
July 22, 1936 - 35.
Early Construction
July 22, 1936 - 36.
Grade Correcting During Construction
July 22, 1936 - 37.
Car on winding road
July 22, 1936 - 38.
View of Machined-Flattened Parkway
July 22, 1936 - 39.
Partially Completed Overlook
July 22, 1936 - 40.
Road Between Hills
July 23, 1936 - 41.
Unpaved Road #1
July 23, 1936 - 42.
#9 Bridge
July 23, 1936 - 43.
Early Construction
July 23, 1936 - 44.
mixer
July 28, 1936 - 45.
Completed Rough Grade
July 28, 1936 - 46.
Roadway
July 29, 1936 - 47.
Early Construction
July 29, 1936 - 48.
Drilling and shoveling Operations
August 1936 - 49.
Toe Ditch
August 14, 1936 - 50.
East along 104 NC Station 415
August 14, 1936 - 51.
Buck Creek Gap
August 14, 1936 - 52.
Road View
August 14, 1936 - 53.
Road View
August 14, 1936 - 54.
Road Construction
August 14, 1936 - 55.
Road Construction
August 14, 1936 - 56.
Road View
August 14, 1936 - 57.
Road Construction
August 14, 1936 - 58.
Road From Sparta To Roaring Gap May Be Improved
August 20, 1936 - 59.
Road View
August 22, 1936 - 60.
Road View
August 22, 1936 - 61.
View of Parkway
August 22, 1936 - 62.
Retaining Wall
August 22, 1936 - 63.
Hare Mill Pond, scenic view
August 22, 1936 - 64.
Rock wall on side of road
August 23, 1936 - 65.
Road construction
August 24, 1936 - 66.
Road construction
August 24, 1936 - 67.
Road construction
August 24, 1936 - 68.
Road construction
August 24, 1936 - 69.
View looking south along parkway, showing construction operations
September 1936 - 70.
Near Entrance Tunnel #1
September 25, 1936 - 71.
Road grading
September 25, 1936 - 72.
Narrow Mountain Road
September 25, 1936 - 73.
Stone Cement Gutter
October 5, 1936 - 74.
Stone Cement Gutter
October 5, 1936 - 75.
View across parkway looking east into escarpment one-half mile south of Cumberland Knob
October 12, 1936 - 76.
Road alignment looking back
October 13, 1936 - 77.
View looking south along parkway, showing need of guard rail
October 20, 1936 - 78.
300 feet from beginning of the section, view looking north along parkway
October 21, 1936 - 79.
Cut Ditch and Bank
October 28, 1936 - 80.
Partly Completed Parking
October 28, 1936 - 81.
Icy Rock Cut (2)
October 31, 1936 - 82.
Icy Rock Curve (3)
October 31, 1936 - 83.
Across Icy Rock Curve
October 31, 1936 - 84.
Road Construction
November 9, 1936 - 85.
Cut, before grading
November 14, 1936 - 86.
Station 258, Sec 2B Rock spilled down mountain side
November 19, 1936 - 87.
Rounded Roadway
December 1, 1936 - 88.
Bridgeway #2 and Parkway
December 2, 1936 - 89.
Through Hills
December 5, 1936 - 90.
Road with Surface Stone
December 5, 1936 - 91.
Through Rough Rock
December 14, 1936 - 92.
Rough Road
December 15, 1936 - 93.
Lakes-To-Florida Highway Is Being Improved In Co.
January 21, 1937 - 94.
Winding Road
February 2, 1937 - 95.
Men cleaning gutter
February 2, 1937 - 96.
Cumberland Knob Drive
February 2, 1937 - 97.
Unsurfaced Road
February 2, 1937 - 98.
Intersection Corner
February 2, 1937 - 99.
View of road
February 8, 1937 - 100.
Road and tunnel
February 8, 1937 - 101.
View of road
February 8, 1937 - 102.
Sand blown up on cut
April 1, 1937 - 103.
Grading at Benge
April 2, 1937 - 104.
Bridge #6
April 10, 1937 - 105.
View of bridge
April 10, 1937 - 106.
Unfinished road and bridge
April 10, 1937 - 107.
Sharp Curve Construction
April 14, 1937 - 108.
Preparing Sub-Grade
April 14, 1937 - 109.
View of Road Above Tunnel #2
April 22, 1937 - 110.
Mailbox on parkway
May 18, 1937 - 111.
Hand Placed Rock
May 20, 1937 - 112.
Bridge #9
May 25, 1937 - 113.
Road Construction
May 26, 1937 - 114.
Cement Stone Gutter
July 28, 1937 - 115.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 116.
North Along Rough Grade at 581-50
August 5, 1937 - 117.
Rock Slide at 576
August 5, 1937 - 118.
View of road
September 3, 1937 - 119.
Road Construction at Station 201-55
September 4, 1937 - 120.
Road Construction at Station 32
September 4, 1937 - 121.
Retaining Wall and unfinished slope of Icy Rock
September 4, 1937 - 122.
Fill Slide
September 9, 1937 - 123.
Deep Rock Cut North
September 14, 1937 - 124.
Cut Road
September 14, 1937 - 125.
Cut Road
September 14, 1937 - 126.
Rough Grade Road
October 10, 1937 - 127.
Road through Cut
October 10, 1937 - 128.
Road and Bridge with Guard Stakes
October 10, 1937 - 129.
Surfaced Road
October 11, 1937 - 130.
View of road
October 12, 1937 - 131.
Dressed Road
October 12, 1937 - 132.
Parkway in late afternoon
October 14, 1937 - 133.
Men Grading Slope
October 15, 1937 - 134.
Partially Worked Gradient
October 15, 1937 - 135.
Construction - Crusher
October 21, 1937 - 136.
Ice Rock
November 20, 1937 - 137.
Surfaced Road
November 20, 1937 - 138.
Icy Road
November 20, 1937 - 139.
Shoulder construction, High Piney Ridge in background
1938 - 140.
West Abutment, Overpass US 21
July 12, 1938 - 141.
Before grading. Cleared to connect slope line, with rock as excuse for steep slope. Ugly profile.
July 25, 1938 - 142.
Before grading. A 3/4 to 1 slope with almost vertical overhang of soft rock
July 25, 1938 - 143.
Before grading. Rotten rock 1:1; ditch too narrow ugly profile.
July 25, 1938 - 144.
Entrance road to lodge site
September 28, 1938 - 145.
Cut before grading
October 2, 1938 - 146.
Cut before grading
October 21, 1938 - 147.
Cut before grading
October 21, 1938 - 148.
Cut before grading
October 21, 1938 - 149.
Fill, before grading
November 7, 1938 - 150.
Cut before grading, looking back
November 22, 1938 - 151.
Cut before grading, looking back
November 22, 1938 - 152.
Cut before grading, looking back
November 22, 1938 - 153.
Before grading
December 1938 - 154.
Before Grading
December 1938 - 155.
Before grading
December 1938 - 156.
Before grading
December 1938 - 157.
Shoulder construction, High Piney Ridge in background
1938 - 158.
Arch ring
January 10, 1939 - 159.
Oblique View of structure
January 10, 1939 - 160.
Type 3 Drop Inlet
January 28, 1939 - 161.
New Cut slope
April 29, 1939 - 162.
Overpass US 21 and Access Drive
May 19, 1939 - 163.
Top of Overpass US 21
May 19, 1939 - 164.
Before flood and P.R.A. regrading
May 25, 1939 - 165.
View of road
August 8, 1939 - 166.
Before flood and P.R.A. regrading
September 25, 1939 - 167.
Daylight
November 7, 1939 - 168.
Heavy Fill
1940 - 169.
Heavy Slide
1940 - 170.
View looking north on Parkway
1940 - 171.
View looking North on Parkway
1940 - 172.
View looking south on Parkway
1940 - 173.
Heavy Fill
1940 - 174.
Broken Pavement Sign
March 15, 1940 - 175.
Cattle belonging to Mrs. C.H. Wright committing trespass
March 17, 1940 - 176.
60 foot cut: Great quantities of natural ground water cause trouble in this cut
July 26, 1940 - 177.
Flood Damage
August 17, 1940 - 178.
Flood damage, Debris washed into lower valleys.
August 17, 1940 - 179.
Block of road washed away
August 16, 1940 - 180.
Road washed out
August 16, 1940 - 181.
Flood Damage
August 16, 1940 - 182.
Flood damage. Gutter washed in and across road.
August 16, 1940 - 183.
Road and Fill Wash
August 16, 1940 - 184.
Block of road entirely removed by terrific stream of water
August 16, 1940 - 185.
Buck Creek Gap Overpass
January 1942 - 186.
Buck Creek Gap Overpass
January 1942 - 187.
Buck Creek Gap Overpass
January 1942 - 188.
Snow, drifts 10-20 ft high
March 1942 - 189.
Snow, drifts 10-20 ft high
March 1942 - 190.
Snow. Austin-Weston grader used to clear road.
March 1942 - 191.
Snow. Austin-Weston grader used to clear road
March 1942 - 192.
Snow, WPA clearing the road
March 1942 - 193.
Fill Slope where Slide Continues, Post Construction
May 6, 1942 - 194.
Spreading Calcium Chloride
July 7, 1942 - 195.
Removing Rock Slide
July 7, 1942 - 196.
Completed Ditch Line
July 20, 1942 - 197.
Finished Roadway
November 4, 1942 - 198.
Guard Wall Construction
February 2, 1943 - 199.
Pavement struck by lightning
March 29, 1943 - 200.
Station 120, Blue Ridge Parkway
April 29, 1943 - 201.
Rock slide before removal
February 28, 1945 - 202.
Proposed Line Change on Parkway
March 29, 1945 - 203.
Craggy Gardens
June 1946 - 204.
Before Planting, Section 2J
October 1946 - 205.
Parkway motor road blocked with snow, Motorist stalled, Damage to shoulder and slope
March 1947 - 206.
Before Paving
September 1948 - 207.
Fallen rock
February 8, 1952 - 208.
Road near Sumter Cabin
October 1952 - 209.
Slide, Sec. 2-Y-4, Sta. 117 + 30
February 4, 1957 - 210.
Fill Slide
April 5, 1957 - 211.
Snowdrift
January 1958 - 212.
Snow Drift
January 1958 - 213.
Snow Drift
January 1958 - 214.
Snow Drift
January 1958 - 215.
Snow Drift
January 1958 - 216.
Dump Truck attempts to remove drift on Sec. 2-F
January 1958 - 217.
Snow Scene
December 7, 1962 - 218.
Snow Scene
December 7, 1962 - 219.
Slides
1970s - 220.
Slides
1970s - 221.
Slides
1970s - 222.
Maintenance
1970s - 223.
Slides
1970s - 224.
Road Patching
June 5, 1973 - 225.
Road Patching
June 5, 1973 - 226.
Berm erosion
June 5, 1973 - 227.
Road Stripping - Yellow Road
June 5, 1973 - 228.
Berm Erosion
June 5, 1973 - 229.
Road Patching
June 5, 1973 - 230.
Rock and mud slides from heavy rains
June 5, 1973 - 231.
Rock and mud slides heavy rains
June 5, 1973 - 232.
Road Patching
June 5, 1973 - 233.
Road patching
June 5, 1973 - 234.
Road Patching
June 5, 1973 - 235.
Road Patching
June 5, 1973 - 236.
Rock Slide
June 5, 1973 - 237.
Road Patching
June 5, 1973 - 238.
Road Stripping - Yellow Road
June 5, 1973 - 239.
Construction
November 29, 1973 - 240.
Construction
November 29, 1973 - 241.
Parkway Signs - Winter
February 20, 1974 - 242.
Snow damage to trees on Parkway
December 11, 1974 - 243.
Snow damage to trees on Parkway
December 11, 1974 - 244.
Snow damage to trees on Parkway
December 11, 1974 - 245.
Snow damage to trees on Parkway
December 11, 1974 - 246.
Snow damage to trees on Parkway
December 11, 1974 - 247.
Snow damage to trees on Parkway
December 11, 1974 - 248.
Snow damage to trees on Parkway
December 11, 1974 - 249.
Grandfather Mt. Connector Aerial photo
August 31, 1976 - 250.
Road repair - asphalt
October 14, 1976 - 251.
Road repair - asphalt
October 14, 1976 - 252.
Road repair - asphalt
October 14, 1976 - 253.
Road repair "asphalt"
October 14, 1976 - 254.
Road repair - asphalt
October 14, 1976 - 255.
Chip seal repaving problem
October 20, 1976 - 256.
Snow conditions on Parkway
January 12, 1977 - 257.
Snow Conditions- Barriers on Parkway
January 12, 1977 - 258.
Snow conditions on Parkway
January 12, 1977 - 259.
Snow conditions on Parkway
January 12, 1977 - 260.
Snow conditions Barrier on Parkway
January 12, 1977 - 261.
Snow conditions on Parkway
January 12, 1977 - 262.
Construction at Grandfather
September 22, 1979 - 263.
Aerials of Construction at Grandfather Mtn.
September 22, 1979 - 264.
Construction at Grandfather
September 22, 1979
Refine Your Search
Types (2)
Photographs (260) Newspaper Articles (3)Locations (68)
Section 2M (36) Section 2A (35) Section 2C (24) Asheville (16) Undetermined (11) Little Switzerland (7) Section 2K (7) Milepost 229 (6) Milepost 239 (6) Section 2F (6) See All ResultsSections (22)
2A (66) 2C (48) 2M (39) 2R (16) 2L (12) 2K (10) 2E (8) 2F (8) 2B (7) 2D (6) See All ResultsCounties (13)
Alleghany (119) Yancey (41) Buncombe (25) McDowell (12) Avery (11) Watauga (10) Ashe (9) Mitchell (8) Wilkes (6) Swain (4) See All Results



