Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Maintenance
20th Century - 2.
Construction from Sta. looking west Sec. 2-Z
20th Century - 3.
Dam
November, year unknown - 4.
Dam
May 19, year unknown - 5.
Backfilling 4x3 box culvert
June 20, year unknown - 6.
Bridge
September 18, year unknown - 7.
Middle Fork Bridge Under Construction
1930s - 8.
Parkway Road Construction
1930s - 9.
Linville Bridge
1930s - 10.
Parkway Road Construction
1930s - 11.
Parkway Construction
1930s - 12.
Road Construction
1930s - 13.
Bridge Construction
1930s - 14.
Construction Site
1930s - 15.
A & W grader - grading overburden
1930s - 16.
Stone Masons
1935 - 17.
Road Construction
June 3, 1955 - 18.
Road Construction
June 3, 1955 - 19.
First Gradeing Contract
September 1935 - 20.
First Grading Contract
September 1935 - 21.
First Gradeing Contract
September 1935 - 22.
First Grading Contract
September 1935 - 23.
Early Construction
November 1, 1935 - 24.
General view of construction rough grading
November 26, 1935 - 25.
View of Wagon Drill
May 2, 1936 - 26.
Drilling Operations
May 2, 1936 - 27.
Road relocation (pines to be welled)
May 8, 1936 - 28.
Heavy Machinery and Construction
May 23, 1936 - 29.
Bridge Tunnel
May 23, 1936 - 30.
Bridge Construction
May 23, 1936 - 31.
Workers and Machinery at Work in Section 2A
July 22, 1936 - 32.
Early Construction of Bridge in Section 2A
July 22, 1936 - 33.
View of Machined-Flattened Parkway
July 22, 1936 - 34.
Grade Correcting During Construction
July 22, 1936 - 35.
Shovel loading
July 23, 1936 - 36.
Early Construction
July 23, 1936 - 37.
NC #104 Relocation, Sec 2M Parkway Access Drive
July 25, 1936 - 38.
Drilling Operations. Looking across parkway line toward the west
August 1936 - 39.
Drilling and shoveling Operations
August 1936 - 40.
Early Construction
August 1936 - 41.
Tunnel Construction
August 14, 1936 - 42.
Super Reliance Grader "Caterpillar"
August 14, 1936 - 43.
Machinery and Hillside
August 14, 1936 - 44.
Proposed Tunnel Site
August 14, 1936 - 45.
Road Construction
August 14, 1936 - 46.
Linn Truck
August 17, 1936 - 47.
Koehring "Dumptor"
August 17, 1936 - 48.
Construction Equipment
August 17, 1936 - 49.
Mountain slope and construction
August 20, 1936 - 50.
Bridge 4, excavation site
August 22, 1936 - 51.
Ahead at site of excavation for bridge #4.
August 22, 1936 - 52.
View looking south along parkway, showing construction operations
September 1936 - 53.
View looking south on parkway showing construction and drilling operations
September 10, 1936 - 54.
View looking south along Ice Rock section of parkway
September 11, 1936 - 55.
Road construction
September 24, 1936 - 56.
Bulldozers and Construction
September 25, 1936 - 57.
Access Road Construction
October 2, 1936 - 58.
Back from Station 5
October 4, 1936 - 59.
Proposed Route 18 Crossing
October 4, 1936 - 60.
Road Grade near NC Route 18
October 4, 1936 - 61.
Top of #4 Bridge
October 5, 1936 - 62.
Construction at Bridge #4
October 5, 1936 - 63.
Left Wing of Bridge #4
October 5, 1936 - 64.
Top of #4 Bridge
October 5, 1936 - 65.
#3 Bridge Construction
October 5, 1936 - 66.
#4 Bridge Construction
October 5, 1936 - 67.
Cement Pouring at Bridge #10
October 5, 1936 - 68.
Icy Rock Cut
October 31, 1936 - 69.
Icy Rock Cut (2)
October 31, 1936 - 70.
Rough Grade Work
October 31, 1936 - 71.
Road Construction
November 9, 1936 - 72.
Looking back at cut and general damage
November 11, 1936 - 73.
Looking back at cut and general damage
November 11, 1936 - 74.
Station 258 Sec 2B Hand-laid rock embankment
November 19, 1936 - 75.
Station 258, Sec 2B Rock fill adjacent to hand-laid rock embankment
November 19, 1936 - 76.
Station 258. Sec 2B Hand-laid rock embankment and rock fill being placed.
November 19, 1936 - 77.
Station 258, Sec 2B Rock spilled down mountain side
November 19, 1936 - 78.
General view showing machinery making fill through low wet area
November 25, 1936 - 79.
Bridge Construction
December 1, 1936 - 80.
Rock Cutting
December 5, 1936 - 81.
Rock Quarry
December 5, 1936 - 82.
HPRE Face
December 5, 1936 - 83.
Men at HPRE Wall
December 5, 1936 - 84.
Rock and Filling
December 7, 1936 - 85.
South Tunnel Entrance
December 14, 1936 - 86.
Tunnel Entrance
December 14, 1936 - 87.
North Tunnel Portal
December 14, 1936 - 88.
Shovel and Tractor
December 15, 1936 - 89.
Excavation Cut
December 15, 1936 - 90.
Rough Road
December 15, 1936 - 91.
Wagon Drill
December 15, 1936 - 92.
Construction Slope
December 15, 1936 - 93.
View of road
February 8, 1937 - 94.
View of road
February 8, 1937 - 95.
Rock cut and tunnel
February 8, 1937 - 96.
Retaining Wall
February 8, 1937 - 97.
Cleared ridge
February 10, 1937 - 98.
Riveters working
April 6, 1937 - 99.
Bridge Construction
April 10, 1937 - 100.
Landscape North to Bridge #6
April 10, 1937 - 101.
Road fill along edge of rough road
April 13, 1937 - 102.
South End of Quarry
April 14, 1937 - 103.
Preparing Sub-Grade
April 14, 1937 - 104.
Drill Operation
April 22, 1937 - 105.
Loading Rock at Retaining Wall
April 22, 1937 - 106.
Construction on Cement Retaining Wall
April 22, 1937 - 107.
Construction of Tunnel #2
April 22, 1937 - 108.
Masonry Wall Building
April 22, 1937 - 109.
Tunnel Construction
April 22, 1937 - 110.
Rock shot
April 23, 1937 - 111.
Rough grade cut
April 23, 1937 - 112.
wagon drilling
April 23, 1937 - 113.
Linn Tractor dumping
April 23, 1937 - 114.
Center line on Tunnel #1
April 27, 1937 - 115.
Drilling and Construction
May 26, 1937 - 116.
Road Construction
May 26, 1937 - 117.
Wagon Drills
May 26, 1937 - 118.
Preparations for Cement Wall
July 28, 1937 - 119.
Drilling and cleaning for stone wall at 255-35
July 28, 1937 - 120.
Dumping of Construction Material for replacing embankment
July 28, 1937 - 121.
Icy Rock Retaining Wall with Crane
September 4, 1937 - 122.
Retaining Wall along Icy Rock
September 4, 1937 - 123.
Hoist On A Fordson Tractor
September 9, 1937 - 124.
Crushing Plant
September 9, 1937 - 125.
Viaduct Pier #4
September 12, 1937 - 126.
Viaduct pier #4
September 12, 1937 - 127.
Gasoline Truck
September 14, 1937 - 128.
Tunnel Excavation
September 14, 1937 - 129.
Bucyrus Erie shovel
September 14, 1937 - 130.
Gardner-Denver machinery
September 14, 1937 - 131.
Tunnel Excavation
September 14, 1937 - 132.
Unfinished Construction
October 12, 1937 - 133.
Inside of a Tunnel
October 15, 1937 - 134.
Construction - Crusher
October 21, 1937 - 135.
The Bluff Crusher and Parkway
March 12, 1938 - 136.
Shovel working on top of 100' cut
August 16, 1938 - 137.
Tunnel #1 cut during excavation
October 1938 - 138.
Tunnel #1 cut during excavation
October 1938 - 139.
Cut at Station 277
February 27, 1939 - 140.
New Cut slope
April 29, 1939 - 141.
Wall Excavation
May 3, 1939 - 142.
Road Construction
May 11, 1939 - 143.
Workers and wall construction
May 24, 1939 - 144.
Rock Drilling
May 24, 1939 - 145.
Overpass Structure 2D-4 North Elevation
September 9, 1938 - 146.
CCC Bulldozer and Truck
1940 - 147.
Tye River Gap Bridge construction
1940s - 148.
Tye River Gap bridge construction
1940s - 149.
Grading
1940 - 150.
CCC H.D. Trent & Heavy equip.
1940s - 151.
CCC Bulldozer and Truck
1940 - 152.
Overpass at Buck Creek Gap
January 21, 1941 - 153.
Overpass at Buck Creek Gap
February 18, 1941 - 154.
Trench
March 28, 1941 - 155.
Wall Construction
April 10, 1941 - 156.
Over Million Dollars In Road Work Under Construction
May 15, 1941 - 157.
South Abutment, Grade Separation
June 30, 1941 - 158.
Grade Separation, South Abutment
June 30, 1941 - 159.
Brinegar Cabin Parking Area
January 1942 - 160.
Brinegar Cabin - parking area, heavy excavation
January 1942 - 161.
Snow WPA Clearing the Road
March 1942 - 162.
Snow. Austin-Weston grader used to clear road
March 1942 - 163.
Snow, Austin-Weston Grader Used to Clear Road
March 1942 - 164.
Clearing-Mill Pond Site
June 1942 - 165.
Flume construction-main branch
June 1942 - 166.
Flume construction-main branch
June 1942 - 167.
30" timber for water-wheel shaft
June 1942 - 168.
Flume construction
August 1942 - 169.
Sorghum Mill
August 1942 - 170.
Guard Wall Construction
February 2, 1943 - 171.
Shovel Working Construction
April 12, 1945 - 172.
Water bound base course
August 12, 1946 - 173.
Rolling and brooming water bound base stone and dust
August 27, 1946 - 174.
Peaks of Otter terminal, stone curb construction
July 23, 1947 - 175.
During preparatory grading before planting
October 30, 1947 - 176.
Top soiling prior to seeding
May 20, 1948 - 177.
Radio Antenna Tower Installation
October 8, 1948 - 178.
Radio Antenna Tower Installation
October 8, 1948 - 179.
Radio Antenna Tower Installation
October 8, 1948 - 180.
Radio Antenna Tower Installation
October 8, 1948 - 181.
Radio Antenna Tower Installation
October 8, 1948 - 182.
Radio Antenna Tower Installation
October 8, 1948 - 183.
2-F Viaduct
October 20, 1948 - 184.
Producing Asphalt
June 24, 1950 - 185.
Grading project
April 1, 1953 - 186.
Grading project
April 1, 1953 - 187.
Construction Site
June 3, 1953 - 188.
Road Construction
June 3, 1953 - 189.
Quarry Drilling
June 3, 1953 - 190.
Road Work
June 3, 1953 - 191.
Work Site
May 4, 1955 - 192.
Road Construction
August 3, 1955 - 193.
Road Construction
August 3, 1955 - 194.
Road Construction
August 23, 1955 - 195.
Road Construction
October 12, 1955 - 196.
Sherrill Cove Tunnel
1956 - 197.
Road Construction
May 21, 1956 - 198.
Grist Mill in operation
July 1956 - 199.
Wildacres Tunnel
April 11, 1957 - 200.
Bridge Construction
July 30, 1957 - 201.
Bridge Construction
October 8, 1957 - 202.
Snow Drift
January 1958 - 203.
Mission 66 sign
August 22, 1958 - 204.
Mission 66 sign
August 22, 1958 - 205.
Soil spreader on rt. shoulder headed north
June 19, 1959 - 206.
Soil spreader, parked at storage trailer
June 19, 1959 - 207.
Shovel dozer at borrow pit on Perry Property
June 20, 1959 - 208.
Lumbering
1960s - 209.
Excavation - Lodge Site, Peaks of Otter
January 21, 1960 - 210.
Excavation - Lodge Site, Peaks of Otter
January 21, 1960 - 211.
Construction of Bridge, Balsam Gap
August 20, 1962 - 212.
Ice Storm - 1969
1969 - 213.
Grandfather Mtn. Const.
1970s - 214.
Grandfather Mtn. Const.
1970s - 215.
Holloway Mt. Rd. Bridge Grandfather Mt Construction
November 1971 - 216.
Holloway Mountain Road Bridge Grandfather Mt construction
November 1971 - 217.
Maintenance Area
1973 - 218.
Storage Area - Neglected Equipment and Poor Maint.
1973 - 219.
Road Stripping - Yellow Road
June 5, 1973 - 220.
Road Stripping - Yellow Road
June 5, 1973 - 221.
Grandfather Mountain Progress
August 1973 - 222.
Grandfather Mountain Progress
August 1973 - 223.
Grandfather Mtn. Progress
August 9, 1973 - 224.
Grandfather Mtn. Progress
August 9, 1973 - 225.
Grandfather Mtn. Progress
August 9, 1973 - 226.
Construction Work
September 18, 1973 - 227.
Construction Work
September 18, 1973 - 228.
Construction Work
September 18, 1973 - 229.
Construction Work
September 18, 1973 - 230.
Grandfather Mtn. Construction
October 23, 1973 - 231.
Grandfather Mtn. Construction
October 23, 1973 - 232.
Grandfather Mtn. Construction
October 23, 1973 - 233.
Grandfather Mtn. Construction
October 23, 1973 - 234.
Grandfather Mtn. Construction
October 23, 1973 - 235.
Grandfather Mtn. Construction
October 23, 1973 - 236.
Grandfather Mtn. Construction
October 23, 1973 - 237.
Grandfather Mtn. Construction
October 23, 1973 - 238.
Grandfather Mountain Construction
October 23, 1973 - 239.
Landslide
November 2, 1973 - 240.
Landslide
November 2, 1973 - 241.
Construction, South End of Grandfather Mtn. Project
November 29, 1973 - 242.
Road (Access) Repair
November 29, 1973 - 243.
Progress - Grandfather Mtn.
February 20, 1974 - 244.
Progress - Grandfather Mtn.
February 20, 1974 - 245.
Progress Grandfather Mtn.
February 20, 1974 - 246.
Road repair - asphalt
October 14, 1976 - 247.
Road repair - asphalt
October 14, 1976 - 248.
Repairs on the Irwin's View Trail
October 14, 1976 - 249.
Road Repair - asphalt.
October 14, 1976 - 250.
Road Repair - asphalt.
October 14, 1976 - 251.
Road repair - asphalt
October 14, 1976 - 252.
Repairing Parkway near Alta Pass
July 1978 - 253.
Construction at Grandfather Mtn.
September 22, 1978 - 254.
Linn Cove Viaduct Construction
September 1979 - 255.
Construction at Grandfather
September 22, 1979 - 256.
Construction at Grandfather
September 22, 1979 - 257.
Construction at Grandfather
September 22, 1979 - 258.
Aerials of Construction at Grandfather Mountain
September 22, 1979 - 259.
Construction at Grandfather
September 22, 1979 - 260.
Construction at Grandfather
September 22, 1979 - 261.
Construction at Grandfather
September 22, 1979 - 262.
Construction at Grandfather
September 22, 1979 - 263.
Aerials of Construction at Grandfather
September 22, 1979 - 264.
Construction at Grandfather
September 22, 1979 - 265.
Grandfather Mtn. Construction
September 22, 1979 - 266.
Construction at Grandfather
September 22, 1979 - 267.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 268.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 269.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 270.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 271.
Grandfather Mountain Road/Bridge Construction
October 2, 1981 - 272.
Grandfather Mountain Road/Bridge Construction
October 2, 1981 - 273.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 274.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 275.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 276.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 277.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 278.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 279.
Grandfather Mtn. Road/Bridge Cosntruction
October 2, 1981 - 280.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 281.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 282.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 283.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 284.
Linn Cove Viaduct Construction
1980s - 285.
Construction - Grandfather Mountain
October 18, 1973 - 286.
Construction - Grandfather Mountain
October 18, 1973 - 287.
Grandfather Mountain Const.
1980s - 288.
Grandfather Mountain Const.
1980s
Refine Your Search
Types (2)
Photographs (286) Newspaper Articles (1)Locations (70)
Grandfather Mountain (51) Section 2M (49) Section 2C (30) Section 2A (18) Mabry Mill (Va.) (7) Section 2P (7) Undetermined (7) Milepost 238 (6) Linn Cove Viaduct (5) Little Switzerland (5) See All ResultsSections (27)
2H (61) 2M (56) 2C (44) 2A (35) 2B (8) 2L (8) 1T (7) 2G (7) 2P (7) 2D (6) See All ResultsCounties (18)
Alleghany (81) Avery (59) Yancey (56) Watauga (16) Buncombe (13) Floyd (7) Haywood (7) Mitchell (7) Wilkes (7) Ashe (6) See All Results



