Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Before seeding and planting (close-up)
20th Century - 2.
Before seeding and planting
1930s - 3.
View of road
1930s - 4.
View of road
1930s - 5.
View of road
1930s - 6.
Before seeding and planting
1930s - 7.
Hillside
1930s - 8.
Before bank sloping
1930s - 9.
Moving trees - CCC
1930s - 10.
Landscape View off of Blue Ridge Parkway
1930s - 11.
Landscape View off of Blue Ridge Parkway
1930s - 12.
Moving trees - CCC
1930s - 13.
Grandfather Mtn. Lumbering operations
September 1934 - 14.
Grandfather Mtn. Lumbering operations
September 1934 - 15.
Special Headwall, 10' x 7' R.C. Box
May 25, 1935 - 16.
Special headwall 10' x 7' R.C. box
May 25, 1935 - 17.
Devils Garden and Green Mountain Parorama
May 31, 1935 - 18.
First Grading Contract
September 1935 - 19.
Stripped area and top soil storage pile
November 26, 1935 - 20.
Top soil stripping operations
November 26, 1935 - 21.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 22.
General ground conditions showing stream conditions
April 16, 1936 - 23.
Picnic area before clearing operations
April 21, 1936 - 24.
Special headwall, Type #1 10' x 7' Box
May 25, 1936 - 25.
Log cribbing and check for erosion control
May 26, 1936 - 26.
Log cribbing and check dams for erosion control
May 26, 1936 - 27.
County road relocation and crossing
June 3, 1936 - 28.
Completed Shuttle Trail, Looking Ahead
June 15, 1936 - 29.
A Step Detail in Indian Grave Trail
July 14, 1936 - 30.
Willow planted along channel change, 10 days after planting
August 13, 1936 - 31.
Early Construction
August 20, 1936 - 32.
Excavation for tree well
August 23, 1936 - 33.
Bridge 10, site of construction
August 25, 1936 - 34.
After stream improvement
August 26, 1936 - 35.
Clearing for road and new laurel growth
September 1936 - 36.
View of Rock cut looking south
September 1936 - 37.
Proposed Route 18 Crossing
October 4, 1936 - 38.
Looking back at cut and general damage
November 11, 1936 - 39.
Rock formation 46' right
February 26, 1937 - 40.
Grading at Benge
April 2, 1937 - 41.
View of Rock Cut
April 23, 1937 - 42.
Tree well
May 20, 1937 - 43.
Tree well
May 20, 1937 - 44.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 45.
Timber Cutting by M. C. Biggerstaff
May 27, 1937 - 46.
Timber Cutting by M.C. iggerstaff
May 27, 1937 - 47.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 48.
Man and a Horse Team
October 12, 1937 - 49.
Team of Horses
October 12, 1937 - 50.
Alignment near inlet large culvert
1938 - 51.
Excavation for Special Footings - CSM Wall
June 1938 - 52.
Proposed wall site
June 1938 - 53.
Before grading. Tape used to show concave slope. Needs transition, overhand and wide rounding
July 25, 1938 - 54.
After Cleanup of Excessive Overcast Material
November 29, 1938 - 55.
High cuts thru wooded area. During selective cutting.
December 15, 1938 - 56.
Pouring Concrete
March 25, 1939 - 57.
Cleared path
March 31, 1939 - 58.
Cleared path
March 31, 1939 - 59.
Wall Site
March 31, 1939 - 60.
New Cut slope
April 29, 1939 - 61.
Road Construction
May 11, 1939 - 62.
Rock Drilling
May 24, 1939 - 63.
Rock Cut at Station 123-50
May 24, 1939 - 64.
Rock cut
August 8, 1939 - 65.
View of road
August 8, 1939 - 66.
Earth and Rock cut before L.D. grading
October 6, 1939 - 67.
Earth and Rock cut before L.D. grading
October 6, 1939 - 68.
Cuts before L.D. grading
October 6, 1939 - 69.
National Park Service Organizational Chart
May 1, 1940 - 70.
Portion of Rock Cliff and overhand at proposed parking overlook
July 27, 1940 - 71.
Road and Fill Wash
August 16, 1940 - 72.
Stream Relocation
October 1, 1940 - 73.
Stream Relocation
October 1, 1940 - 74.
Seeding and staked mulch (in Bluff Park)
1941 - 75.
Rock Wall
February 18, 1941 - 76.
Rock Wall
February 18, 1941 - 77.
Northwest bridge slope after seeding
October 1942 - 78.
Tunnel #2. East Portal regular landscape development treatment will be sufficient
May 1943 - 79.
Tunnel #1 East portal
May 1943 - 80.
Tunnel #1. West portal. Regular landscape development will be sufficient. Grading and seeding complete
May 1943 - 81.
Buffer Strip and Stump Removal, Wm. M. Shuffler Lease
Spring 1944 - 82.
"Before picture" shows close-up of severe sheet erosion. "After picture" neg #5443
August 1944 - 83.
From State Road Shoulder Left, Before Planting
October 29, 1947 - 84.
After preparatory grading - before planting - looking north
October 29, 1947 - 85.
Heeling in bed
November 1947 - 86.
Shoulder and ditch prior to seeding
May 20, 1948 - 87.
Top soiling prior to seeding
May 20, 1948 - 88.
Discing on the Rocky Knob District
1950 - 89.
Grading project
April 1, 1953 - 90.
Surface mining operations
1955 - 91.
Road Construction
August 3, 1955 - 92.
Road Construction
August 23, 1955 - 93.
Road Construction
October 12, 1955 - 94.
Road Construction
May 21, 1956 - 95.
Drainage Construction
June 5, 1956 - 96.
Applying commercial fertilizer to Road Shoulders, Blue Ridge Parkway
March 24, 1958 - 97.
Soil spreader on rt. shoulder headed north
June 19, 1959 - 98.
Hydroseeder, Left on Parkway, Headed North
June 19, 1959 - 99.
Lumbering
1960s - 100.
Atop Devil's Courthouse Nature Trail - Plant succession
July 1960 - 101.
Mulching Seeded Slope - APW Program
May 9, 1963 - 102.
Oral History Interview with Stanley Abbott, March 24, 1971
March 24, 1971 - 103.
Grandfather Mtn. Progress
August 9, 1973 - 104.
Grandfather Mtn. Construction
October 23, 1973 - 105.
Trenches from Civil War
November 29, 1973 - 106.
Trenches from Civil War
November 29, 1973 - 107.
Strange Growth in Tree
April 30, 1974 - 108.
Brush Clearing
August 8, 1974 - 109.
Brush Clearing
August 8, 1974 - 110.
Brush Clearing
August 8, 1974 - 111.
Brush Clearing
August 8, 1974 - 112.
Brush Clearing
August 8, 1974 - 113.
Brush Clearing
August 8, 1974 - 114.
Brush Clearing
August 8, 1974 - 115.
Brush Clearing
August 8, 1974 - 116.
Brush Clearing
August 8, 1974 - 117.
Grandfather Mtn. Progress
October 1975 - 118.
Civil War Earthworks
February 1976 - 119.
Working on Grandfather Mt. Connector
August 31, 1976 - 120.
Richland Balsam Trail - Repair and construction
December 1976 - 121.
Richland Balsam Trail - Repair and construction
December 1976 - 122.
Richland Balsam Trail - Repair and construction
December 1976 - 123.
Richland Balsam Trail - Repair and construction
December 1976 - 124.
Richland Balsam Trail - Repair and construction
December 1976 - 125.
Richland Balsam Trail - Repair and construction
December 1976 - 126.
Richland Balsam Trail - Repair and construction
December 1976 - 127.
Richland Balsam Trail - Repair and construction
December 1976 - 128.
Richland Balsam Trail - Repair and construction
December 1976 - 129.
Richland Balsam Trail - Repair and construction
December 1976 - 130.
Richland Balsam Trail - Repair and construction
December 1976 - 131.
Richland Balsam Trail - Repair and construction
December 1976 - 132.
Richland Balsam Trail - Repair and construction
December 1976 - 133.
Richland Balsam Trail - Repair and construction
December 1976 - 134.
Richland Balsam Trail - Repair and construction
December 1976 - 135.
Richland Balsam Trail - Repair and construction
December 1976 - 136.
Richland Balsam Trail - Repair and construction
December 1976 - 137.
Richland Balsam Trail - Repair and construction
December 1976 - 138.
Richland Balsam Trail - Repair and construction
December 1976 - 139.
Richland Balsam Trail - Repair and construction
December 1976 - 140.
Richland Balsam Trail - Repair and construction
December 1976 - 141.
Richland Balsam Trail - Repair and construction
December 1976 - 142.
Richland Balsam Trail - Repair and construction
December 1976 - 143.
Richland Balsam Trail - Repair and construction
December 1976 - 144.
Richland Balsam Trail - Repair and construction
December 1976 - 145.
Richland Balsam Trail - Repair and construction
December 1976 - 146.
Richland Balsam Trail - Repair and construction
December 1976 - 147.
Richland Balsam Trail - Repair and construction
December 1976 - 148.
Richland Balsam Trail - Repair and construction
December 1976 - 149.
Richland Balsam Trail - Repair and construction
December 1976 - 150.
Richland Balsam Trail - Repair and construction
December 1976 - 151.
Richland Balsam Trail - Repair and construction
December 1976 - 152.
Richland Balsam Trail - Repair and construction
December 1976 - 153.
Richland Balsam Trail - Repair and construction
December 1976 - 154.
Richland Balsam Trail - Repair and construction
December 1976 - 155.
YACC Blog Trail
August 18, 1978 - 156.
YACC Blog Trail
August 18, 1978 - 157.
Construction at Grandfather
September 22, 1979 - 158.
Vanishing Vistas (page 2 of 2)
January 24, 1993 - 159.
Vanishing Vistas (page 1 of 2)
January 24, 1993 - 160.
Oral History Interview with William Pruitt, June 14, 1996
June 14, 1996 - 161.
Oral History Interview with Ted Pease, October 7, 1996
October 7, 1996 - 162.
Oral History Interview with William Hooper, October 25, 1996
October 25, 1996 - 163.
Oral History Interview with Ted Pease, November 5, 2000
November 5, 2000 - 164.
Oral History Interview with William Hooper, January 6, 2001
January 6, 2001 - 165.
Early Construction
Refine Your Search
Types (4)
Photographs (156) Oral Histories (6) Newspaper Articles (2) Drawings, Plans, and Projections (1)Locations (65)
Milepost 430 (35) Section 2M (11) Heffner Gap (9) Grandfather Mountain (5) Milepost 276 (5) Section 2A (5) Undetermined (4) Cumberland Knob (3) Milepost 226 (3) Milepost 232 (3) See All ResultsSections (22)
2W (35) 2A (25) 2M (14) 2K (13) 2E (12) 2C (9) 2H (8) 2B (7) 2J (5) 2D (4) See All ResultsCounties (16)
Alleghany (38) Haywood (36) Avery (12) Watauga (12) Mitchell (11) Yancey (11) McDowell (8) Wilkes (8) Ashe (5) Transylvania (4) See All Results



