Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Rock Embankment
1930s - 2.
Before seeding and planting
1930s - 3.
Bank Sloping
1930s - 4.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 5.
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935 - 6.
Coarse Stone Road in Section 2A
June 23, 1936 - 7.
Handlaid rock embankment
August 14, 1936 - 8.
Hand-laid rock embankment detail
August 14, 1936 - 9.
Hand-laid rock embankment construction
August 14, 1936 - 10.
Early Construction
August 20, 1936 - 11.
Hand-laid rock embankment after cleanup
October 25, 1936 - 12.
View looking south across Ice Rock toward hand-laid rock embankmen
November 11, 1936 - 13.
Station 258 Sec 2B Hand-laid rock embankment
November 19, 1936 - 14.
Pipe headwall, "backwall" and cobble gutter
December 13, 1936 - 15.
Typical riprap bank protection
December 13, 1936 - 16.
Sand blown up on cut
April 1, 1937 - 17.
Hand-laid rock embankment
April 2, 1937 - 18.
Hand-laid rock embankment
April 2, 1937 - 19.
Bridge #9
May 25, 1937 - 20.
Hand Placed Rock embankment
May 26, 1937 - 21.
Icy Rock Curve
May 26, 1937 - 22.
Overcast Material
December 15, 1937 - 23.
Gorge below Parkway From south end of Ice Rock
January 2, 1939 - 24.
Before flood and P.R.A. regrading
May 25, 1939 - 25.
Proposed Line Change on Parkway
March 29, 1945 - 26.
Proposed Line Change on Parkway
March 29, 1945 - 27.
Illegal timber cutting by Electric Corp
July 1946 - 28.
After preparatory grading - before planting - looking south
October 29, 1947 - 29.
After preparatory grading - before planting - looking north
October 29, 1947 - 30.
Slide after Storm Damage
February 6, 1957 - 31.
Slides
February 6, 1957 - 32.
Advertising sign adjacent to Parkway
1959 - 33.
Advertising signs along the Parkway
1959 - 34.
Advertising sign adjacent to Parkway
1959 - 35.
Rock and mud slides from heavy rains
June 5, 1973 - 36.
Construction
November 29, 1973 - 37.
Construction
November 29, 1973 - 38.
Grandfather Mtn. Progress
October 1975 - 39.
Grandfather Mountain Progress
October 1975 - 40.
Bank slide
October 14, 1976 - 41.
Banks before sloping
Refine Your Search
Types (1)
Photographs (41)Locations (24)
Grandfather Mountain (4) Milepost 229 (3) Milepost 263 (3) Milepost 270 (3) Milepost 312 (3) Milepost 237 (2) Milepost 262 (2) Section 2A (2) Section 2C (2) Section 2M (2) See All ResultsSections (13)
2E (9) 2A (5) 2C (5) 2J (5) 2H (4) 2B (2) 2M (2) 2R (2) 2Y (2) 1D (1) See All ResultsCounties (11)
Alleghany (12) Avery (9) Ashe (5) Wilkes (3) Buncombe (2) Franklin (2) Jackson (2) Yancey (2) Henderson (1) Nelson (1) See All Results



