Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Alligator Back Sheet erosion control (after)
July 26, 1941 - 2.
Sheet erosion control (after)
July 26, 1941 - 3.
Severe sheet and some gully erosion (before)
August 1941 - 4.
Gully and sheet erosion work completed
August 1941 - 5.
Severe sheet and some gully erosion (after) see neg# 5436
November 1941 - 6.
Gully and sheet erosion (mulching with pine)
November 1941 - 7.
Shows active gully and sheet erosion (before)
November 1941 - 8.
Gully and sheet erosion (work started)
November 1941 - 9.
Gully and Sheet Erosion
July 1, 1942 - 10.
Gully and sheet erosion, large pasture with active sheet erosion.
September 1942 - 11.
Erosion to be controlled under 1944 S. & M.C.
October 6, 1943 - 12.
"Before picture" shows close-up of severe sheet erosion. "After picture" neg #5443
August 1944 - 13.
Gully and sheet erosion
August 1944 - 14.
Gully and sheet erosion.
August 1944 - 15.
"After picture" shows same area controlled by pine brush mulching and seeding to Lespedeza sericea. Before picture neg# 5442
March 1946
Refine Your Search
Types (1)
Photographs (15)Locations (8)
Milepost 268 (3) Section 2E (3) Milepost 242 (2) Milepost 261 (2) Milepost 265 (2) Alligator Back (1) Daniels Gap (1) Milepost 264 (1)Sections (3)
2E (10) 2C (3) 2D (2)Counties (3)
Ashe (9) Alleghany (3) Wilkes (3)