Before grading. Gullies and cave-ins. Slope too steep.
July 25, 1935 - 2.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 3.
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935 - 4.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 5.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 6.
General ground conditions, showing erosion
April 16, 1936 - 7.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 8.
Log cribbing and check for erosion control
May 26, 1936 - 9.
Log cribbing and check dams for erosion control
May 26, 1936 - 10.
Log Cribbing and Check Dams for Erosion Control
May 26, 1936 - 11.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 12.
Erosion near the Bluffs at the head of Basin Creek
October 20, 1936 - 13.
Wood cutting A.C. Nolen
March 10, 1937 - 14.
Wood cutting A.C. Nolen
March 10, 1937 - 15.
Erosion
May 20, 1937 - 16.
Erosion
May 20, 1937 - 17.
Erosion
May 20, 1937 - 18.
Water Channel
October 11, 1937 - 19.
Before grading. Cave-in on 1:1 slope. Will continue to slide unless flattened. Needs rounding.
July 25, 1938 - 20.
Unpaved roadway with erosion
July 25, 1938 - 21.
Washout at headwall. Shows need of different type of structure.
August 1, 1938 - 22.
Before flood and P.R.A. regrading
September 25, 1939 - 23.
Before flood and P.R.A. regrading
September 25, 1939 - 24.
60 foot cut: Great quantities of natural ground water cause trouble in this cut
July 26, 1940 - 25.
Flood Damage
August 17, 1940 - 26.
Flood damage fill wash
August 21, 1940 - 27.
Gutter, Shoulder, and Part of Road Washed Out
August 16, 1940 - 28.
Road washed out
August 16, 1940 - 29.
Complete slide where earth was saturated with water
August 16, 1940 - 30.
Complete washout in road Flood damage
August 16, 1940 - 31.
Complete Slide from Cut
August 16, 1940 - 32.
Soil Erosion
1941 - 33.
Gully control (after)
July 26, 1941 - 34.
Alligator Back Sheet erosion control (after)
July 26, 1941 - 35.
Sheet erosion control (after)
July 26, 1941 - 36.
Gully control (after)
July 26, 1941 - 37.
Severe sheet and some gully erosion (before)
August 1941 - 38.
Gully and sheet erosion work completed
August 1941 - 39.
Gully and sheet erosion (work started)
November 1941 - 40.
Severe sheet and some gully erosion (after) see neg# 5436
November 1941 - 41.
Gully control (after) Beng, N.C.
November 1941 - 42.
Gully and sheet erosion (mulching with pine)
November 1941 - 43.
Shows active gully and sheet erosion (before)
November 1941 - 44.
Gully and Sheet Erosion
July 1, 1942 - 45.
Gully and sheet erosion, large pasture with active sheet erosion.
September 1942 - 46.
Soil Erosion Before Erosion Control Work
November 1942 - 47.
Soil Erosion Before Erosion Control Work
November 1942 - 48.
Utilization of brush (provided from selective cutting) to control erosion
May 13, 1943 - 49.
Sheet and gully erosion
June 25, 1943 - 50.
Sheet erosion proposed control S & M.C. 1944 before
June 25, 1943 - 51.
Erosion to be controlled under 1944 S. & M.C.
October 6, 1943 - 52.
Erosion to be controlled under 1944 S. & M.C.
October 6, 1943 - 53.
Gully and sheet erosion.
August 1944 - 54.
Gully and sheet erosion
August 1944 - 55.
"Before picture" shows close-up of severe sheet erosion. "After picture" neg #5443
August 1944 - 56.
"After picture" shows same area controlled by pine brush mulching and seeding to Lespedeza sericea. Before picture neg# 5442
March 1946 - 57.
Berm Erosion
June 5, 1973 - 58.
Berm Erosion
June 5, 1973 - 59.
Berm Erosion
June 5, 1973 - 60.
Rock and mud slides heavy rains
June 5, 1973 - 61.
Berm erosion
June 5, 1973 - 62.
Berm Erosion
June 5, 1973 - 63.
Berm Erosion
June 5, 1973 - 64.
Oral History Interview with William Hooper, January 6, 2001
January 6, 2001
Refine Your Search
Types (2)
Photographs (63) Oral Histories (1)Locations (33)
Asheville (7) Milepost 268 (6) Milepost 158 (5) Section 2E (4) Cumberland Knob (3) Milepost 264 (3) Milepost 225 (2) Milepost 226 (2) Milepost 229 (2) Milepost 242 (2) See All ResultsSections (10)
2E (20) 2A (13) 2C (8) 2R (7) 1R (5) 2K (3) 1V (2) 2D (2) 2H (2) 2N (2)Counties (9)
Alleghany (20) Ashe (13) Wilkes (10) Buncombe (8) Floyd (5) Avery (4) Carroll (2) McDowell (1) Yancey (1)