Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Dressed Slopes and Road Intersection
October 29, 1936 - 2.
Linn Tractor dumping
April 23, 1937 - 3.
Road Construction at Station 32
September 4, 1937 - 4.
Hoist On A Fordson Tractor
September 9, 1937 - 5.
Wall Construction
April 10, 1941 - 6.
Brinegar Cabin Parking Area
January 1942 - 7.
Hay baling
May 13, 1943 - 8.
Road Construction
April 3, 1953 - 9.
Road Construction
June 3, 1953 - 10.
Road Construction
June 3, 1953 - 11.
Tractor, Lime, and Fertilizer Spreaders, Bk. of Rt. 21
June 19, 1959 - 12.
Parkway Maintenance
1960s - 13.
Mowing
June 5, 1973 - 14.
Mowing
June 5, 1973 - 15.
Southern Pine Bark Beetle
February 7, 1974 - 16.
Sandy Flat Maintenance Area
April 22, 1974 - 17.
Road Repair - asphalt.
October 14, 1976
Refine Your Search
Types (1)
Photographs (17)Locations (13)
Gillespie Gap (2) Milepost 417 (2) Section 2C (2) Section 2M (2) Brinegar Cabin (1) Little Switzerland (1) Milepost 158 (1) Milepost 217 (1) Milepost 388 (1) Milepost 390 (1) See All ResultsSections (9)
2C (3) 2L (3) 2A (2) 2M (2) 2R (2) 2U (2) 1R (1) 2G (1) 2T (1)Counties (9)
Alleghany (5) Buncombe (2) McDowell (2) Transylvania (2) Yancey (2) Floyd (1) Haywood (1) Mitchell (1) Watauga (1)



