Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Bridge
September 18, year unknown - 2.
View of Road Construction from Tunnel
20th Century - 3.
Construction from Sta. looking west Sec. 2-Z
20th Century - 4.
Overpass Construction
20th Century - 5.
Backfilling 4x3 box culvert
June 20, year unknown - 6.
Parkway Road Construction
1930s - 7.
Access road on left of Parkway
1930s - 8.
Construction Site
1930s - 9.
Parkway Road Construction
1930s - 10.
Construction Workers
1930s - 11.
Early Construction
1930s - 12.
Access Road on Left of Parkway
1930s - 13.
Road construction
1930s - 14.
Post construction forces scaling tunnel
1930s - 15.
Unidentified Construction
1930s - 16.
A & W grader - grading overburden
1930s - 17.
Road Construction
1930s - 18.
Road Construction
June 3, 1955 - 19.
Road Construction
June 3, 1955 - 20.
Road Construction
June 3, 1955 - 21.
Overpass location at Benge (back)
June 19, 1935 - 22.
Before grading. 1:1 cut gullying badly; too steep to grass; flatten and round for grass
July 25, 1935 - 23.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 24.
First Gradeing Contract
September 1935 - 25.
First Grading Contract
September 1935 - 26.
First Gradeing Contract
September 1935 - 27.
Early Construction
November 1, 1935 - 28.
General view construction through low area
November 26, 1935 - 29.
General view of construction rough grading
November 26, 1935 - 30.
Overpass at Meadow Fork
March 4, 1936 - 31.
Early Construction
April 17, 1936 - 32.
Road construction
April 27, 1936 - 33.
Fill and box culvert
May 7, 1936 - 34.
Fill and Box Culvert
May 7, 1936 - 35.
Cut Slopes
May 7, 1936 - 36.
Grade crossing, Daniels Gap before revision
May 8, 1936 - 37.
Heavy Machinery and Construction
May 23, 1936 - 38.
Bridge Construction
May 23, 1936 - 39.
County road relocation and crossing
June 3, 1936 - 40.
Early Road Cut in Section 2A
June 23, 1936 - 41.
Unique Culvert Near Station 262
June 23, 1936 - 42.
Early Construction
June 26, 1936 - 43.
Early Construction
June 27, 1936 - 44.
Early Construction
June 28, 1936 - 45.
Proposed Site for Border of Section C and Section D
June 28, 1936 - 46.
Road construction
July 8, 1936 - 47.
Early Construction
July 13, 1936 - 48.
View of Machined-Flattened Parkway
July 22, 1936 - 49.
Workers and Machinery at Work in Section 2A
July 22, 1936 - 50.
Grade Correcting During Construction
July 22, 1936 - 51.
Partially Completed Overlook
July 22, 1936 - 52.
Early Construction
July 22, 1936 - 53.
Vehicle Tracks
July 22, 1936 - 54.
Wall 611
July 23, 1936 - 55.
#9 Bridge
July 23, 1936 - 56.
Path North over Proposed Bridge
July 23, 1936 - 57.
Drilling
July 23, 1936 - 58.
Shovel loading
July 23, 1936 - 59.
Line Guides
July 23, 1936 - 60.
Valley
July 23, 1936 - 61.
Early Construction
July 23, 1936 - 62.
mixer
July 28, 1936 - 63.
Early Construction
July 29, 1936 - 64.
Early Construction
August 1936 - 65.
View from top of cut opposite parking area looking north along line of parkway
August 1936 - 66.
Road Construction
August 14, 1936 - 67.
Machinery and Hillside
August 14, 1936 - 68.
Early Construction
August 16, 1936 - 69.
Construction Equipment
August 17, 1936 - 70.
Pipeline
August 17, 1936 - 71.
Linn Truck
August 17, 1936 - 72.
Koehring "Dumptor"
August 17, 1936 - 73.
Early Construction
August 19, 1936 - 74.
Early Construction
August 20, 1936 - 75.
Early Construction
August 20, 1936 - 76.
Early Construction
August 21, 1936 - 77.
Road View
August 22, 1936 - 78.
Road construction
August 24, 1936 - 79.
Early Construction
August 24, 1936 - 80.
Road construction
August 24, 1936 - 81.
Road construction
August 24, 1936 - 82.
Road construction
August 24, 1936 - 83.
Rough Grading Partially Complete
August 25, 1936 - 84.
View looking south along parkway, showing construction operations
September 1936 - 85.
Latest wagon drill in action. View looking south from point toward Bluffs
September 1936 - 86.
View from edge of parkway, 1 looking north along alignment towad Cumberland Knob Park Area
September 1936 - 87.
View looking south on parkway showing construction and drilling operations
September 10, 1936 - 88.
View looking south along Ice Rock section of parkway
September 11, 1936 - 89.
Road construction
September 24, 1936 - 90.
Cleared Roadway
September 25, 1936 - 91.
Near Entrance Tunnel #1
September 25, 1936 - 92.
Mountain Slope Road
September 25, 1936 - 93.
Narrow Mountain Road
September 25, 1936 - 94.
Road grading
September 25, 1936 - 95.
Bulldozers and Construction
September 25, 1936 - 96.
Access Road Construction
October 2, 1936 - 97.
Back from Station 5
October 4, 1936 - 98.
Road Grade near NC Route 18
October 4, 1936 - 99.
#3 Bridge Construction
October 5, 1936 - 100.
View of alignment looking north near beginning of section
October 13, 1936 - 101.
Partly Completed Parking
October 28, 1936 - 102.
Cut Ditch and Bank
October 28, 1936 - 103.
Drop Inlet Station 29
October 28, 1936 - 104.
Work Across Intersection from 39-20
October 28, 1936 - 105.
Bridge #6 Construction
October 29, 1936 - 106.
Icy Rock Cut
October 31, 1936 - 107.
Across Icy Rock Curve
October 31, 1936 - 108.
Icy Rock Cut (4)
October 31, 1936 - 109.
Rough Grade Work
October 31, 1936 - 110.
Left Head Wall 437
October 31, 1936 - 111.
Right Head Wall 437
October 31, 1936 - 112.
Icy Rock Curve (3)
October 31, 1936 - 113.
Icy Rock Curve
October 31, 1936 - 114.
Icy Rock Curve (2)
October 31, 1936 - 115.
Icy Rock Cut (2)
October 31, 1936 - 116.
Icy Rock Cut (3)
October 31, 1936 - 117.
Road Through Rock
November 9, 1936 - 118.
Road Construction
November 9, 1936 - 119.
Parkway road and parking area
November 11, 1936 - 120.
Crew working in cut
November 11, 1936 - 121.
Looking back at cut and general damage
November 11, 1936 - 122.
Looking back at cut and general damage
November 11, 1936 - 123.
General view showing machinery making fill through low wet area
November 25, 1936 - 124.
Rock Cutting
December 5, 1936 - 125.
Rock and Filling
December 7, 1936 - 126.
South Tunnel Entrance
December 14, 1936 - 127.
Through Rough Rock
December 14, 1936 - 128.
Tunnel Entrance
December 14, 1936 - 129.
North Tunnel Portal
December 14, 1936 - 130.
Excavation Cut
December 15, 1936 - 131.
Shovel and Tractor
December 15, 1936 - 132.
Early construction
February 2, 1937 - 133.
Early Construction
February 5, 1937 - 134.
View of road
February 8, 1937 - 135.
Road and tunnel
February 8, 1937 - 136.
Rock cut and tunnel
February 8, 1937 - 137.
View of road
February 8, 1937 - 138.
Cleared ridge
February 10, 1937 - 139.
Grading at Benge
April 2, 1937 - 140.
Hand-laid rock embankment
April 2, 1937 - 141.
Landscape North to Bridge #6
April 10, 1937 - 142.
View of Junction of 2A and 2B
April 12, 1937 - 143.
Road fill along edge of rough road
April 13, 1937 - 144.
Loading Holes for Blasting
April 14, 1937 - 145.
Rough Grade Rock Fill
April 14, 1937 - 146.
Sharp Curve Construction
April 14, 1937 - 147.
Preparing Sub-Grade
April 14, 1937 - 148.
Construction on Cement Retaining Wall
April 22, 1937 - 149.
Rough grade cut
April 23, 1937 - 150.
Linn Tractor dumping
April 23, 1937 - 151.
Overpass construction
May 4, 1937 - 152.
Guard rail, No.7 bridge
May 4, 1937 - 153.
Mailbox on parkway
May 18, 1937 - 154.
Bridge #2
May 25, 1937 - 155.
Road Construction
May 26, 1937 - 156.
Wagon Drills
May 26, 1937 - 157.
Drilling and Construction
May 26, 1937 - 158.
Preparations for Cement Wall
July 28, 1937 - 159.
Early Construction
July 30, 1937 - 160.
South End of Tunnel 1
August 4, 1937 - 161.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 162.
View of road
September 3, 1937 - 163.
Retaining Wall along Icy Rock
September 4, 1937 - 164.
Road Construction at Station 32
September 4, 1937 - 165.
Construction of Gutter at Station 108-60
September 4, 1937 - 166.
Road Construction at Station 201-55
September 4, 1937 - 167.
Retaining Wall and unfinished slope of Icy Rock
September 4, 1937 - 168.
Icy Rock Retaining Wall with Crane
September 4, 1937 - 169.
Rough grade road
September 9, 1937 - 170.
Tunnel Excavation
September 14, 1937 - 171.
Cut Road
September 14, 1937 - 172.
Cut Road
September 14, 1937 - 173.
Tunnel Excavation
September 14, 1937 - 174.
Early Construction
October 11, 1937 - 175.
Unfinished Construction
October 12, 1937 - 176.
Rock Cut - Devil's Garden
October 13, 1937 - 177.
Looking off toward Obida
October 14, 1937 - 178.
Parkway--good example flat slopes and gutter
October 14, 1937 - 179.
Men Grading Slope
October 15, 1937 - 180.
Construction - Crusher
October 21, 1937 - 181.
Road to Lodge (under construction)
November 1937 - 182.
Road to Lodge (under construction)
November 1937 - 183.
Surfaced Road
November 20, 1937 - 184.
Road Routes
November 22, 1937 - 185.
Mountainside
November 24, 1937 - 186.
Overcast material (distant) and fill (foreground)
December 15, 1937 - 187.
Shoulder construction, High Piney Ridge in background
1938 - 188.
Road construction to picnic area
March 12, 1938 - 189.
Wood tract Pierce Collins estate
April 21, 1938 - 190.
Example of careless blasting from cut
May 7, 1938 - 191.
Finish Grading
June 1938 - 192.
Grade separation, south elevation
July 1938 - 193.
Before grading. Cleared to connect slope line, with rock as excuse for steep slope. Ugly profile.
July 25, 1938 - 194.
Construction of overpass U.S. 221
August 16, 1938 - 195.
Shovel working on top of 100' cut
August 16, 1938 - 196.
Bear Den Cliff at proposed revision
August 16, 1938 - 197.
Entrance road to lodge site
September 28, 1938 - 198.
Tunnel #1 cut during excavation
October 1938 - 199.
Tunnel #1 cut during excavation
October 1938 - 200.
Cut before grading
October 4, 1938 - 201.
Fill Before Grading
October 6, 1938 - 202.
Before grading
December 1938 - 203.
Before grading
December 1938 - 204.
Shoulder construction, High Piney Ridge in background
1938 - 205.
Oblique view
January 10, 1939 - 206.
Arch ring
January 10, 1939 - 207.
Cut at Station 277
February 27, 1939 - 208.
Construction road to stable site
March 25, 1939 - 209.
Road Construction
May 11, 1939 - 210.
View of road
August 8, 1939 - 211.
Earth and Rock cut before L.D. grading
October 6, 1939 - 212.
Unstable rock cut during L.D. grading
October 6, 1939 - 213.
Cuts before L.D. grading
October 6, 1939 - 214.
Earth and Rock cut before L.D. grading
October 6, 1939 - 215.
Daylight
November 7, 1939 - 216.
Looking south on Parkway
1940 - 217.
Looking south on parkway
1940 - 218.
Looking south on Parkway
1940 - 219.
Looking north on the Parkway
1940 - 220.
Heavy Fill
1940 - 221.
Heavy Fill
1940 - 222.
Heavy Slide
1940 - 223.
Looking south on Parkway
1940 - 224.
Grading
1940 - 225.
Gutter
June 12, 1940 - 226.
60 foot cut Great quantities of natural ground water have caused much trouble in this cut
July 8, 1940 - 227.
60 foot cut: Great quantities of natural ground water cause trouble in this cut
July 26, 1940 - 228.
Site of future overpass at Station 477
July 27, 1940 - 229.
Use made of land adjacent to Parkway during 1940 construction
July 27, 1940 - 230.
Connection of Parkway with County Road to Blowing Rock
October 1, 1940 - 231.
Overpass ringstones
November 18, 1940 - 232.
12" x 12" box culvert
December 1, 1940 - 233.
Wall Construction
April 10, 1941 - 234.
Brinegar Cabin Parking Area and Entrance Road from the Parkway
January 1942 - 235.
Buck Creek Gap Overpass
January 1942 - 236.
Brinegar Cabin - parking area, heavy excavation
January 1942 - 237.
Buck Creek Gap Overpass
January 1942 - 238.
Contractor Finishes Seven-Mile Section of Parkway This Week (Page 2 of 2)
November 12, 1942 - 239.
Contractor Finishes Seven-Mile Section of Parkway This Week (Page 1 of 2)
November 12, 1942 - 240.
Guard Wall Construction
February 2, 1943 - 241.
Balsam, grading and Rangers Smith and Liles
July 1944 - 242.
Balsam stand
July 1944 - 243.
Rock slide before removal
February 28, 1945 - 244.
Shovel Working Construction
April 12, 1945 - 245.
Trench Cut Maintenance
August 1945 - 246.
Craggy Gardens
June 1946 - 247.
Water bound base course
August 12, 1946 - 248.
Rolling and brooming water bound base stone and dust
August 27, 1946 - 249.
Road to Sharp Top before construction. Slope flattening
November 15, 1946 - 250.
Road from Sharp Top - before slope flattening
November 15, 1946 - 251.
Relocation Rte 43 Cut station
September 1947 - 252.
Cut after completion Rte 43
October 1947 - 253.
Before Paving
September 1948 - 254.
Men At Work
March 30, 1953 - 255.
Road Construction
March 30, 1953 - 256.
Grading project
April 1, 1953 - 257.
Grading project
April 1, 1953 - 258.
Road Construction
April 3, 1953 - 259.
Road Construction
April 3, 1953 - 260.
Road Building
June 3, 1953 - 261.
Construction Site
June 3, 1953 - 262.
Quarry Drilling
June 3, 1953 - 263.
Road Work
June 3, 1953 - 264.
Road Construction
June 3, 1953 - 265.
Trucks At Work
July 9, 1953 - 266.
Drilling
May 5, 1954 - 267.
Work Site
May 4, 1955 - 268.
Overpass Construction
May 19, 1955 - 269.
Overpass Construction
May 19, 1955 - 270.
Overpass Construction
May 30, 1955 - 271.
Overpass
July 19, 1955 - 272.
Road Construction
August 3, 1955 - 273.
Road Construction
August 3, 1955 - 274.
Road Construction
August 3, 1955 - 275.
Road Construction
August 23, 1955 - 276.
Road Construction
October 12, 1955 - 277.
Road Construction
May 21, 1956 - 278.
Drainage Construction
May 31, 1956 - 279.
Drainage Construction
June 5, 1956 - 280.
Fill Slide
April 5, 1957 - 281.
Bridge Construction
July 30, 1957 - 282.
Grandfather Mtn. Prog. Const.
1970s - 283.
Grandfather Mtn. Const.
1970s - 284.
Holloway Mountain Road Bridge Grandfather Mt construction
November 1971 - 285.
Road Striping - Yellow Paint
June 5, 1973 - 286.
Road Striping - Yellow
June 5, 1973 - 287.
Road Striping - Yellow Line
June 5, 1973 - 288.
Road Striping - Yellow Paint
June 5, 1973 - 289.
Road Striping - Yellow Paint
June 5, 1973 - 290.
Grandfather Mountain Progress
August 1973 - 291.
Grandfather Mountain Progress
August 1973 - 292.
Construction Work
September 18, 1973 - 293.
Progress
September 20, 1973 - 294.
Progress
September 20, 1973 - 295.
Progress
September 20, 1973 - 296.
Progress
September 20, 1973 - 297.
Progress
September 20, 1973 - 298.
Progress
September 20, 1973 - 299.
Grandfather Mtn. Construction
October 23, 1973 - 300.
Grandfather Mtn. Construction
October 23, 1973 - 301.
Grandfather Mtn. Construction
October 23, 1973 - 302.
Grandfather Mtn. Construction
October 23, 1973 - 303.
Grandfather Mtn. Construction
October 23, 1973 - 304.
Grandfather Mtn. Construction
October 23, 1973 - 305.
Construction
November 1973 - 306.
Construction
November 1973 - 307.
Construction
November 1973 - 308.
Construction
November 29, 1973 - 309.
Construction
November 29, 1973 - 310.
Construction
November 29, 1973 - 311.
Construction
November 29, 1973 - 312.
Progress Grandfather Mountain
February 20, 1974 - 313.
Progress - Grandfather Mtn.
February 20, 1974 - 314.
Progress - Grandfather Mtn.
February 20, 1974 - 315.
Progress - Grandfather Mtn.
February 20, 1974 - 316.
Progress Grandfather Mtn.
February 20, 1974 - 317.
Progress - Grandfather Mtn.
February 20, 1974 - 318.
Progress - Grandfather Mtn.
February 20, 1974 - 319.
Resort Road Construction - Air Bellows Gap
August 1974 - 320.
Resort Road Construction - Air Bellows
August 1974 - 321.
Resort Road Construction Air Bellows Gap
August 1974 - 322.
Resort Road Construction - Air Bellows Gap
August 1974 - 323.
Resort Road Construction - Air Bellows
August 1974 - 324.
Grandfather Mtn. Progress
October 1975 - 325.
Grandfather Mtn. Progress
October 1975 - 326.
Grandfather Mountain Connector
August 31, 1976 - 327.
Helicopter used for aerial inspection of progress of Grandfather Mt. connection
August 31, 1976 - 328.
Working on Grandfather Mt. Connector
August 31, 1976 - 329.
Progress on Parkway connection (aerial)
August 31, 1976 - 330.
Progress on Parkway connection (aerial)
August 31, 1976 - 331.
Progress on Parkway Connection (aerial)
August 31, 1976 - 332.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 333.
Progress on Parkway connection (aerial)
August 31, 1976 - 334.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 335.
Grandfather Mt. Connector Aerial photo
August 31, 1976 - 336.
Progress on Parkway extension (aerial)
August 31, 1976 - 337.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 338.
Progress on Parkway connection (aerial)
August 31, 1976 - 339.
Progress on Parkway connection (aerial)
August 31, 1976 - 340.
Progress on Parkway connection (aerial)
August 31, 1976 - 341.
Grandfather Mt. Connector
August 31, 1976 - 342.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 343.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 344.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 345.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 346.
Helicopter Used for Aerial Inspection of Progress of Grandfather Mt Connector
August 31, 1976 - 347.
Helicopter used for aerial inspection of progress of Grandfather Mt. connection
August 31, 1976 - 348.
Helicopter Used for Aerial Inspection of Progress of Grandfather Mt Connection
August 31, 1976 - 349.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 350.
Parkway connection (aerial photo)
August 31, 1976 - 351.
Parkway connection (aerial photo)
August 31, 1976 - 352.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 353.
Progress on Parkway connection (aerial)
August 31, 1976 - 354.
Progress on Parkway extension (aerial)
August 31, 1976 - 355.
Grandfather Mt Connector
August 31, 1976 - 356.
Progress on Parkway connection
August 31, 1976 - 357.
Grandfather Mt. Connector Aerial Photo
August 31, 1976 - 358.
Progress on Parkway connection (aerial)
August 31, 1976 - 359.
Grandfather Mt. Connector Aerial Photo
August 31, 1976 - 360.
Grandfather Mt. Connector aerial photo
August 31, 1976 - 361.
Parkway Connection (aerial photo)
August 31, 1976 - 362.
Road repair - asphalt
October 14, 1976 - 363.
Road Repair - asphalt.
October 14, 1976 - 364.
Road repair - asphalt
October 14, 1976 - 365.
Road Repair - asphalt.
October 14, 1976 - 366.
Road Repair "Asphalt".
October 14, 1976 - 367.
Road Repair - asphalt.
October 14, 1976 - 368.
Road repair - asphalt
October 14, 1976 - 369.
Road Repair - asphalt.
October 14, 1976 - 370.
Road Repair - asphalt.
October 14, 1976 - 371.
Repairing Parkway near Alta Pass
July 1978 - 372.
Construction at Grandfather
September 22, 1978 - 373.
Construction at Grandfather
September 22, 1979 - 374.
Construction at Grandfather
September 22, 1979 - 375.
Construction at Grandfather
September 22, 1979 - 376.
Construction at Grandfather
September 22, 1979 - 377.
Aerials of Construction at Grandfather
September 22, 1979 - 378.
Aerials of construction at Grandfather
September 22, 1979 - 379.
Construction at Grandfather
September 22, 1979 - 380.
Construction at Grandfather
September 22, 1979 - 381.
Grandfather Mtn. Construction
September 22, 1979 - 382.
Construction at Grandfather
September 22, 1979 - 383.
Construction at Grandfather
September 22, 1979 - 384.
Construction at Grandfather
September 22, 1979 - 385.
Construction at Grandfather
September 22, 1979 - 386.
Construction at Grandfather
September 22, 1979 - 387.
Construction at Grandfather
September 22, 1979 - 388.
Construction at Grandfather
September 22, 1979 - 389.
Construction at Grandfather
September 22, 1979 - 390.
Construction at Grandfather
September 22, 1979 - 391.
Construction at Grandfather
September 22, 1979 - 392.
Construction at Grandfather
September 22, 1979 - 393.
Construction at Grandfather
September 22, 1979 - 394.
Construction at Grandfather
September 22, 1979 - 395.
Construction at Grandfather
September 22, 1979 - 396.
Construction at Grandfather
September 22, 1979 - 397.
Construction at Grandfather
September 22, 1979 - 398.
Aerials of Construction at Grandfather Mountain
September 22, 1979 - 399.
Construction at Grandfather
September 22, 1979 - 400.
Construction at Grandfather
September 22, 1979 - 401.
Grandfather Mountain
September 22, 1979 - 402.
Construction at Grandfather
September 22, 1979 - 403.
Grandfather Mtn. Construction
September 22, 1979 - 404.
Construction at Grandfather
September 22, 1979 - 405.
Construction at Grandfather
September 22, 1979 - 406.
Construction at Grandfather
September 22, 1979 - 407.
Construction at Grandfather
September 22, 1979 - 408.
Construction at Grandfather
September 22, 1979 - 409.
Construction at Grandfather
September 22, 1979 - 410.
Construction at Grandfather
September 22, 1979 - 411.
Construction at Grandfather
September 22, 1979 - 412.
Grandfather Mtn Construction
September 22, 1979 - 413.
Construction at Grandfather Mtn.
September 22, 1979 - 414.
Construction at Grandfather Mtn.
September 22, 1979 - 415.
Grandfater Mountain Road/Bridge Construction
October 2, 1981 - 416.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 417.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 418.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 419.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 420.
Grandfather Mountain Road/Bridge Construction
October 2, 1981 - 421.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 422.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 423.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 424.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 425.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 426.
Grandfather Mtn. Road/Bridge Cosntruction
October 2, 1981 - 427.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 428.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 429.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 430.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 431.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 432.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 433.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 434.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 435.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 436.
Oral History Interview with Sam Bushnell, June 18, 1996
June 18, 1996 - 437.
Oral History Interview with Bernard Turner, July 11, 1996
July 11, 1996 - 438.
Tunnel near Little Switzerland
- 439.
Tunnel
- 440.
Grandfather Mountain Const.
1980s - 441.
Oral History Interview with Dillard Teer, January 20, 1997
January 20, 1997 - 442.
Grandfather Mountain Const.
1980s - 443.
Construction - Grandfather Mountain
October 18, 1973
Refine Your Search
Types (3)
Photographs (436) Oral Histories (3) Newspaper Articles (2)Locations (100)
Grandfather Mountain (103) Section 2M (45) Section 2C (39) Section 2A (22) Milepost 308 (18) Little Switzerland (10) Undetermined (9) Section 2P (7) Milepost 248 (6) Milepost 408 (6) See All ResultsSections (28)
2H (119) 2C (61) 2M (55) 2A (46) 2J (22) 2B (18) 2D (14) 2E (12) 2L (11) 2F (10) See All ResultsCounties (20)
Avery (137) Alleghany (119) Yancey (54) Watauga (23) Ashe (17) Wilkes (16) Buncombe (14) Haywood (11) Mitchell (10) Transylvania (8) See All Results



