Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Dam
May 19, year unknown - 2.
Bridge
October 6, year unknown - 3.
Type #1 headwall, single
April 16, 1936 - 4.
Right Head Wall 289
October 28, 1936 - 5.
Bridge #9 Abutment
October 29, 1936 - 6.
Sample Wall
November 6, 1936 - 7.
Bridge Construction
December 1, 1936 - 8.
Bridge Construction
December 1, 1936 - 9.
Grade separation Class B masonry and concrete barrel
July 1, 1938 - 10.
Before grading operation and clean-up, looking north
October 18, 1938 - 11.
Spandrel Wall - Rubble wing wall and concrete vault
October 18, 1938 - 12.
Expansion joints at junction of spandrel and wing walls
October 18, 1938 - 13.
Pouring Concrete
March 25, 1939 - 14.
Overpass Construction
May 19, 1955 - 15.
Overpass Construction
May 19, 1955 - 16.
Overpass Construction
May 30, 1955 - 17.
Bridge Construction
October 8, 1957 - 18.
Dam
November 20, 1958 - 19.
Dam
November 20, 1958 - 20.
Dam
November 20, 1958 - 21.
Concrete Mixing
April 15, 1959 - 22.
Concrete Placement
April 15, 1959 - 23.
A large bridge
November 1959 - 24.
A bridge
November 1959 - 25.
Grandfather Mtn. Construction
September 22, 1979 - 26.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 27.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 28.
Incinerator Temperature cracks
Refine Your Search
Types (1)
Photographs (28)Locations (14)
Section 2G (5) Milepost 230 (4) Milepost 296 (4) Section 2A (4) Flat Top Mountain (N.C.) (2) Beacon Heights (1) Grandfather Mountain (1) Linn Cove Viaduct (1) Milepost 225 (1) Milepost 240 (1) See All ResultsSections (7)
2G (13) 2A (5) 2B (4) 2C (2) 2H (2) 2J (1) 2M (1)Counties (4)
Watauga (13) Alleghany (11) Avery (3) Yancey (1)



