- 1.
Tunnel, Blue Ridge Parkway
20th Century - 2.
North Portal Tanbark Ridge Tunnel
1930s - 3.
Rock Embankment
1930s - 4.
Devils Garden Showing Steep Rocky Slopes
May 31, 1935 - 5.
Rock cut near South Fork New River
February 21, 1936 - 6.
Shovel loading
July 23, 1936 - 7.
Drilling
July 23, 1936 - 8.
Road Construction
August 14, 1936 - 9.
Rock wall on side of road
August 23, 1936 - 10.
Early Construction
August 24, 1936 - 11.
View of Rock cut looking south
September 1936 - 12.
View looking north along cut through Ice Rock section of Parkway near Bluffs Park area
September 11, 1936 - 13.
Looking north along parkway showing rock outcropping
October 11, 1936 - 14.
Road alignment looking back
October 13, 1936 - 15.
Icy Rock Curve (2)
October 31, 1936 - 16.
Icy Rock Cut (3)
October 31, 1936 - 17.
Icy Rock Cut (4)
October 31, 1936 - 18.
Icy Rock Curve (3)
October 31, 1936 - 19.
Icy Rock Cut
October 31, 1936 - 20.
Icy Rock Cut (2)
October 31, 1936 - 21.
Road Through Rock
November 9, 1936 - 22.
Crew working in cut
November 11, 1936 - 23.
Ahead on Line
November 11, 1936 - 24.
Station 258, Sec 2B Rock fill adjacent to hand-laid rock embankment
November 19, 1936 - 25.
HPRE Face
December 5, 1936 - 26.
Rock Cutting
December 5, 1936 - 27.
Rock and Filling
December 7, 1936 - 28.
Through Rough Rock
December 14, 1936 - 29.
Tunnel Entrance
December 14, 1936 - 30.
Rock cut and tunnel
February 8, 1937 - 31.
Construction of Tunnel #2
April 22, 1937 - 32.
North Through Tunnel #1
April 22, 1937 - 33.
Looking Through Tunnel #1
April 22, 1937 - 34.
Looking North Through Tunnel #2
April 22, 1937 - 35.
Loading Rock at Retaining Wall
April 22, 1937 - 36.
Retaining Wall Looking North
April 22, 1937 - 37.
Tunnel Construction
April 22, 1937 - 38.
Rock shot
April 23, 1937 - 39.
View of Rock Cut
April 23, 1937 - 40.
Center line on Tunnel #1
April 27, 1937 - 41.
Hand Placed Rock
May 20, 1937 - 42.
Icy Rock Curve
May 26, 1937 - 43.
Detail of surrounding rocks
May 29, 1937 - 44.
Cement Stone Gutter Along Rock Bank
July 28, 1937 - 45.
South End of Tunnel 1
August 4, 1937 - 46.
North Entrance of Tunnel 1
August 4, 1937 - 47.
South End of Tunnel 2
August 4, 1937 - 48.
North Along Rough Grade at 581-50
August 5, 1937 - 49.
Quarry Operation for Masonry Material
August 5, 1937 - 50.
Rock Slide at 576
August 5, 1937 - 51.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 52.
Gutter Work along Rock Face
September 4, 1937 - 53.
South Entrance Tunnel #1
September 9, 1937 - 54.
Deep Rock Cut
September 9, 1937 - 55.
Deep Rock Cut North
September 14, 1937 - 56.
Gasoline Truck
September 14, 1937 - 57.
Water Channel
October 11, 1937 - 58.
Rock cut back of parking overlook
October 11, 1937 - 59.
Dirt Road
October 11, 1937 - 60.
Stone Hillside Work
October 11, 1937 - 61.
Stone Gutter
October 11, 1937 - 62.
Rock Cut - Devil's Garden
October 13, 1937 - 63.
Looking through rock cut towards Ice Rock and Bluff
October 13, 1937 - 64.
Ice Rock
November 20, 1937 - 65.
Surfaced Road
November 20, 1937 - 66.
Rock cut at Devil's Garden
1938 - 67.
Large rock fragments over cast on lower of the rock cut as a result of overshooting
April 25, 1938 - 68.
Lower side thru rock cut at 335 strewn with rock due to overshooting
April 25, 1938 - 69.
Rock Overcast on Lower Side thru Cut, Before Cleanup
April 25, 1938 - 70.
Looking Down the Back Side of thru Rock Cut
April 25, 1938 - 71.
Rock overcast at lower side through rock cut
April 25, 1938 - 72.
Example of careless blasting from cut
May 7, 1938 - 73.
Big Cut at Devil's Garden
June 14, 1938 - 74.
Excavating through rock for culvert
July 28, 1938 - 75.
Cut before grading
October 2, 1938 - 76.
Cut before grading
October 21, 1938 - 77.
Cut before grading
October 21, 1938 - 78.
Excessive overcast yardage from bench cut in rock, looking down from shoulder
December 1938 - 79.
Before Grading
December 1938 - 80.
North end of ice rock
January 16, 1939 - 81.
Type 3 Drop Inlet
January 28, 1939 - 82.
Rock Drilling
May 24, 1939 - 83.
Rock Cut at Station 123-50
May 24, 1939 - 84.
Rock cut
August 8, 1939 - 85.
Wild Cat Overlook from Below
October 26, 1939 - 86.
View looking south on parkway
1940 - 87.
North portal Tanbark Ridge Tunnel
1940s - 88.
Guard wall (sample sec.) Show rear elevation of wall and rear batter.
August 1941 - 89.
Tunnel No. 1 West Portal
April 28, 1943 - 90.
Tunnel No. 1, East Portal Regular landscape development treatment will be sufficient Grading and seeding complete
May 1943 - 91.
Typical ditch condition in thru cuts -- looking south
February 27, 1945 - 92.
Tunnel
June 1946 - 93.
Scenic Mountain View
October 1946 - 94.
Rock Embankment
June 1947 - 95.
Rock Wall, Project 2M2
February 27, 1951 - 96.
Rock with Leaves
February 8, 1952 - 97.
Road Construction
June 3, 1953 - 98.
Cuts
May 1958 - 99.
Cuts
May 1958 - 100.
Parkway North of Bear-Wallow Gap
May 1959 - 101.
Sign: 5 miles to Peaks of Otter
May 19, 1959 - 102.
Looking North
June 1959 - 103.
Peaks of Otter Sign
June 1959 - 104.
Parkway with Waterrock Knob in background
October 1959 - 105.
Slides
1970s - 106.
Rock and mud slides heavy rains
June 5, 1973 - 107.
Rock Cut
March 1974 - 108.
Rock Cut
March 1974 - 109.
Construction at Grandfather
September 22, 1979 - 110.
Slides
Refine Your Search
Types (1)
Photographs (110)Locations (41)
Section 2M (29) Section 2C (18) Devil's Garden (4) Milepost 90 (4) Undetermined (4) Milepost 239 (3) Milepost 242 (3) Milepost 227 (2) Milepost 228 (2) Milepost 235 (2) See All ResultsSections (18)
2M (32) 2C (30) 2A (10) 2N (7) 2P (5) 1K (4) 2B (3) 2K (2) 2Z (2) 1H (1) See All ResultsCounties (12)
Alleghany (41) Yancey (34) McDowell (7) Buncombe (6) Bedford (5) Wilkes (3) Cherokee (2) Transylvania (2) Ashe (1) Avery (1) See All Results