Search Results:
- 1.
View of road and gutter
1930s - 2.
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 - 3.
Rock filled tiled drain left of center line
November 26, 1935 - 4.
Box culvert, 8' x 6', 15° skew
November 26, 1935 - 5.
Box culvert 8' x 6', 15° skew
November 26, 1935 - 6.
Bluff Park Culvert Grassy Gap Road
January 5, 1936 - 7.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 8.
Under Drain
July 23, 1936 - 9.
Pipeline
August 17, 1936 - 10.
Stone Cement Gutter Construction
October 5, 1936 - 11.
Stone Cement Gutter
October 5, 1936 - 12.
Stone Cement Gutter
October 5, 1936 - 13.
Rubble gutter treatment at intersection of secondary road
October 13, 1936 - 14.
Detail of rubble gutter and tile underdrain emerging
October 13, 1936 - 15.
Rubble gutter completed
October 13, 1936 - 16.
Gutter termination at pipe headwall
October 13, 1936 - 17.
Gutter under construction
October 13, 1936 - 18.
General view of road and gutter
October 13, 1936 - 19.
Detail of rubble gutter - completed
October 13, 1936 - 20.
View of culvert
October 13, 1936 - 21.
Simple arch culvert on west side of parkway
October 13, 1936 - 22.
Work on Culvert
October 28, 1936 - 23.
Drop Inlet Station 29
October 28, 1936 - 24.
Drop Inlet and Cement Stone Masonry Apron
November 17, 1936 - 25.
Winding Road
February 2, 1937 - 26.
Drain Wall
February 2, 1937 - 27.
Men cleaning gutter
February 2, 1937 - 28.
Inlet culvert headwalll
April 1, 1937 - 29.
Culvert headwall
April 1, 1937 - 30.
Culvert Headwall
April 2, 1937 - 31.
View of road
April 10, 1937 - 32.
Bridge #5 42' span cost $17,520
May 18, 1937 - 33.
Bridge #9
May 25, 1937 - 34.
Special drainage structure
June 22, 1937 - 35.
Special drainage structure
June 22, 1937 - 36.
Culvert on side of slope above hollow
July 14, 1937 - 37.
Stone steps joining gutter
July 28, 1937 - 38.
Head wall and Stone Cement Channel
July 28, 1937 - 39.
Cement Stone Gutter Along Rock Bank
July 28, 1937 - 40.
Cement Stone Gutter
July 28, 1937 - 41.
Headwall to be changed to Drop Inlet
August 1937 - 42.
Headwall placed too near center line.
August 1937 - 43.
Drop inlet
August 20, 1937 - 44.
Construction of Gutter at Inlet Towards Station 28
September 4, 1937 - 45.
Gutter Work along Rock Face
September 4, 1937 - 46.
Stone and iron culvert
September 4, 1937 - 47.
Culvert Cement Stone Gutter at Station 122-30
September 4, 1937 - 48.
Construction of Gutter at Station 108-60
September 4, 1937 - 49.
Cement stone gutter
October 10, 1937 - 50.
View of road
October 11, 1937 - 51.
Paving Gutters
October 11, 1937 - 52.
Stone Gutter
October 11, 1937 - 53.
Gutter Construction
October 11, 1937 - 54.
Parkway--good example flat slopes and gutter
October 14, 1937 - 55.
Drop inlet set back of gutter
October 14, 1937 - 56.
Tunnel entrance and culvert headwall
October 15, 1937 - 57.
Tunnel #2
October 15, 1937 - 58.
Bridge - Grassy Gap Road
March 12, 1938 - 59.
Cut, before grading
November 11, 1938 - 60.
Type 3 Drop Inlet
January 28, 1939 - 61.
Type 3 Drop Inlet
January 28, 1939 - 62.
View of road
September 6, 1939 - 63.
Example of proper junction D-1 and bituminous gutter
September 11, 1939 - 64.
Example of proper junction D-1 and bituminous gutter
September 11, 1939 - 65.
Before flood and P.R.A. regrading
September 25, 1939 - 66.
Curb and culvert detail on island for gasoline station
October 26, 1939 - 67.
Pump house site and dam
October 26, 1939 - 68.
View looking south on parkway
1940 - 69.
12' x 12' box culvert
October 1, 1940 - 70.
Seeding and staked mulch (in Bluff Park)
1941 - 71.
Cut to be daylighted prior to seeding of grass bay.
January 1947 - 72.
Deteriorated Grate
May 19, 1952 - 73.
Drainage Construction
May 29, 1956 - 74.
Drainage Construction
May 31, 1956 - 75.
Drainage Construction
June 5, 1956 - 76.
Box Culvert
July 26, 1956 - 77.
Box Culvert
July 27, 1956 - 78.
Poor drainage
June 5, 1973 - 79.
Poor drainage
June 5, 1973 - 80.
Construction
November 29, 1973 - 81.
New Drain Field Site in Front of Male Servant's Quarter
June 1975 - 82.
Drain line for Cone sewage system will go from carriage barn (left), down the road to the end of the rail fence (background)
June 1975 - 83.
View of area in which septic tank drainfield will be constructed
June 1975 - 84.
Drainfield for Moses Cone sewage system. View is toward Manor House which is in the background of the photo.
June 1975 - 85.
Drain line for Cone sewage system will go downhill from this point to the drain field
June 1975
Refine Your Search
Types (1)
Photographs (85)Locations (37)
Section 2A (13) Section 2C (13) Milepost 221 (4) Moses H. Cone Memorial Park (4) Doughton Park (3) Milepost 224 (3) Milepost 225 (3) Milepost 227 (3) Milepost 240 (3) Section 2M (3) See All ResultsSections (15)
2A (29) 2C (23) 2G (8) 2D (4) 2E (4) 2H (3) 2M (3) 2K (2) 2N (2) 2R (2) See All ResultsCounties (10)
Alleghany (53) Watauga (11) Ashe (5) Yancey (4) Buncombe (3) McDowell (3) Wilkes (3) Avery (1) Botetourt (1) Haywood (1)