Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Mitchell Falls Mt. Mitchell
20th Century - 2.
Curve in Road
20th Century - 3.
Scenic Views, Parkway N.C.
20th Century - 4.
Tunnel, Blue Ridge Parkway
20th Century - 5.
Rocky Part of the Parkway
20th Century - 6.
Rocky Part of the Parkway
20th Century - 7.
South tunnel portal
1930s - 8.
North Portal Tanbark Ridge Tunnel
1930s - 9.
Rocky Ledge
1930s - 10.
Rock Embankment
1930s - 11.
Unidentified Construction
1930s - 12.
Parkway Construction
1930s - 13.
Grandfather Mt Balanced Rock
June 1934 - 14.
Devils Garden Showing Steep Rocky Slopes
May 31, 1935 - 15.
Cliffs along Linville River 1,000 Feet Upstream from Bridge
August 1, 1935 - 16.
Stone quarry for Roaring Gap Hotel
September 18, 1935 - 17.
Rock filled tiled drain left of center line
November 26, 1935 - 18.
Dry Masonry Stone Foundation, slaty schist.
February 19, 1936 - 19.
Early Construction
July 23, 1936 - 20.
Path North over Proposed Bridge
July 23, 1936 - 21.
Cumberland Knob #1
July 23, 1936 - 22.
Under Drain
July 23, 1936 - 23.
View from Highest Point in Cumberland Knob
August 1936 - 24.
Fern Covered Rock along Trail
August 1936 - 25.
Wildcat Rocks
August 3, 1936 - 26.
Bridge Site #6, Southwest Wing Wall, Pine Creek Bridge No. 6
August 4, 1936 - 27.
Toe Ditch
August 14, 1936 - 28.
Hand-laid rock embankment
August 14, 1936 - 29.
Road View
August 14, 1936 - 30.
Hand-laid rock embankment construction
August 14, 1936 - 31.
Road Construction
August 14, 1936 - 32.
Hand-placed rock wall
August 20, 1936 - 33.
Rock wall on side of road
August 23, 1936 - 34.
Early Construction
August 24, 1936 - 35.
View of Rock cut looking south
September 1936 - 36.
View looking south along Ice Rock section of parkway
September 11, 1936 - 37.
View looking north along cut through Ice Rock section of Parkway near Bluffs Park area
September 11, 1936 - 38.
Falls in Basin Creek Bluff Park
September 11, 1936 - 39.
Area at Otter Creek crossing showing pool
September 17, 1936 - 40.
Near Entrance Tunnel #1
September 25, 1936 - 41.
Rock face and Side Slope
September 25, 1936 - 42.
Rock Wall
September 25, 1936 - 43.
Access Road Construction
October 2, 1936 - 44.
Construction of prop. wall
October 4, 1936 - 45.
#4 Bridge Construction
October 5, 1936 - 46.
Top of #4 Bridge
October 5, 1936 - 47.
Stone Cement Gutter
October 5, 1936 - 48.
Gutter under construction
October 13, 1936 - 49.
View of table rock formation in valley to the east of parkway
October 22, 1936 - 50.
Hand-laid rock embankment after cleanup
October 25, 1936 - 51.
Bridge #6 Construction
October 29, 1936 - 52.
Icy Rock Cut (4)
October 31, 1936 - 53.
Across Icy Rock Curve
October 31, 1936 - 54.
Icy Rock Cut (3)
October 31, 1936 - 55.
Icy Rock Cut
October 31, 1936 - 56.
Icy Rock Curve (2)
October 31, 1936 - 57.
Icy Rock Curve
October 31, 1936 - 58.
Retaining Wall Construction
November 6, 1936 - 59.
Road Through Rock
November 9, 1936 - 60.
Hand-placed rock embankment
November 11, 1936 - 61.
Hand-placed rock embankment
November 11, 1936 - 62.
View looking north across Ice Rock area
November 11, 1936 - 63.
Hand-laid rock embankment
November 11, 1936 - 64.
View looking south across Ice Rock toward hand-laid rock embankmen
November 11, 1936 - 65.
Crew working in cut
November 11, 1936 - 66.
Ahead on Line
November 11, 1936 - 67.
Station 258 Sec 2B Hand-laid rock embankment
November 19, 1936 - 68.
Station 258. Sec 2B Hand-laid rock embankment and rock fill being placed.
November 19, 1936 - 69.
Station 258, Sec 2B Rock fill adjacent to hand-laid rock embankment
November 19, 1936 - 70.
Station 258, Sec 2B Rock spilled down mountain side
November 19, 1936 - 71.
Close-up of hand-laid rock embankment
November 19, 1936 - 72.
Hand laid rock embankment showing small stone
November 19, 1936 - 73.
Rock Quarry
December 5, 1936 - 74.
HPRE Face
December 5, 1936 - 75.
Rock Cutting
December 5, 1936 - 76.
Men at HPRE Wall
December 5, 1936 - 77.
Rock and Filling
December 7, 1936 - 78.
Through Rough Rock
December 14, 1936 - 79.
Tunnel Entrance
December 14, 1936 - 80.
Rock embankment and culvert
February 4, 1937 - 81.
Rock embankment and stream
February 4, 1937 - 82.
Rock cut and tunnel
February 8, 1937 - 83.
Road and rock pile
February 8, 1937 - 84.
Cement stone wall
February 10, 1937 - 85.
Retaining Wall
February 10, 1937 - 86.
Rock formation 46' right
February 26, 1937 - 87.
Rock formation 75' right
February 26, 1937 - 88.
Hand-laid rock embankment
April 2, 1937 - 89.
Hand-laid rock embankment
April 2, 1937 - 90.
Left End of Bridge #9
April 12, 1937 - 91.
Bridge Rock Detail
April 12, 1937 - 92.
Road fill along edge of rough road
April 13, 1937 - 93.
South End of Quarry
April 14, 1937 - 94.
Sharp Curve Construction
April 14, 1937 - 95.
Loading Holes for Blasting
April 14, 1937 - 96.
North Through Tunnel #1
April 22, 1937 - 97.
Construction of Tunnel #2
April 22, 1937 - 98.
Drill Operation
April 22, 1937 - 99.
Loading Rock at Retaining Wall
April 22, 1937 - 100.
Completed Cement Retaining Wall
April 22, 1937 - 101.
Looking North Through Tunnel #2
April 22, 1937 - 102.
View of Road Above Tunnel #2
April 22, 1937 - 103.
Tunnel Construction
April 22, 1937 - 104.
Looking Through Tunnel #1
April 22, 1937 - 105.
View of Rock Cut
April 23, 1937 - 106.
Rock shot
April 23, 1937 - 107.
Center line on Tunnel #1
April 27, 1937 - 108.
Hand Placed Rock
May 20, 1937 - 109.
Icy Rock Curve
May 26, 1937 - 110.
Hand Placed Rock embankment
May 26, 1937 - 111.
Detail of surrounding rocks
May 29, 1937 - 112.
Rough headwall
June 8, 1937 - 113.
Cement Stone Gutter Along Rock Bank
July 28, 1937 - 114.
South End of Tunnel 2
August 4, 1937 - 115.
North Entrance of Tunnel 1
August 4, 1937 - 116.
South End of Tunnel 1
August 4, 1937 - 117.
North Along Rough Grade at 581-50
August 5, 1937 - 118.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 119.
Quarry Operation for Masonry Material
August 5, 1937 - 120.
Partially Built Retaining Wall at 537
August 5, 1937 - 121.
Rock Slide at 576
August 5, 1937 - 122.
Ice Rock Wall
August 18, 1937 - 123.
Icy Rock Retaining Wall with Crane
September 4, 1937 - 124.
Gutter Work along Rock Face
September 4, 1937 - 125.
Stone masonry retaining wall
September 4, 1937 - 126.
Hoist On A Fordson Tractor
September 9, 1937 - 127.
Deep Rock Cut
September 9, 1937 - 128.
Fill Slide
September 9, 1937 - 129.
Crushing Plant
September 9, 1937 - 130.
South Entrance Tunnel #1
September 9, 1937 - 131.
Tunnel Excavation
September 14, 1937 - 132.
Deep Rock Cut North
September 14, 1937 - 133.
Air Bellows Gap Underpass
September 21, 1937 - 134.
West wingwall Air Bellows Gap Underpass
September 23, 1937 - 135.
Winding Road
October 11, 1937 - 136.
Stone Gutter
October 11, 1937 - 137.
Stone Hillside Work
October 11, 1937 - 138.
Paving Gutters
October 11, 1937 - 139.
Rock Embankment
October 11, 1937 - 140.
Water Channel
October 11, 1937 - 141.
Dirt Road
October 11, 1937 - 142.
Rock Cut - Devil's Garden
October 13, 1937 - 143.
Inside of a Tunnel
October 15, 1937 - 144.
Ice Formations
November 1937 - 145.
Ice Rock
November 20, 1937 - 146.
Rock Overcast - Cleared and Obliterated
1938 - 147.
Excessive rock spillage in ravine from cut
March 8, 1938 - 148.
Rock spillage in ravine under structure, foreground
March 8, 1938 - 149.
Rock Overcast on Lower Side thru Cut, Before Cleanup
April 25, 1938 - 150.
Looking Down the Back Side of thru Rock Cut
April 25, 1938 - 151.
Rock overcast at lower side through rock cut
April 25, 1938 - 152.
Lower side thru rock cut at 335 strewn with rock due to overshooting
April 25, 1938 - 153.
Large rock fragments over cast on lower of the rock cut as a result of overshooting
April 25, 1938 - 154.
Big Cut at Devil's Garden
June 14, 1938 - 155.
Table Rock
July 14, 1938 - 156.
Fill scar area and overcast material
June 25, 1938 - 157.
Fill scar, slide area and overcast material
June 25, 1938 - 158.
Stack Rock
July 13, 1938 - 159.
Before grading. A 3/4 to 1 slope with almost vertical overhang of soft rock
July 25, 1938 - 160.
Devils Court House
July 27, 1938 - 161.
Example of Effective Holding In, or Fill by Laying Fill
August 31, 1939 - 162.
Excessive overcast yardage from bench cut in rock
December 1938 - 163.
Excessive overcast yardage from bench cut in rock, looking down from shoulder
December 1938 - 164.
From south end of Ice Rock
January 2, 1939 - 165.
North end of ice rock
January 16, 1939 - 166.
Road Construction
May 11, 1939 - 167.
Rock Drilling
May 24, 1939 - 168.
Rock Cut at Station 123-50
May 24, 1939 - 169.
Natural arch rock about 100' high
May 26, 1939 - 170.
Undercutting Fill Slopes for Stream Relocation
August 1939 - 171.
Stream undermining Abutment from upstream
August 1, 1939 - 172.
Rock cut
August 8, 1939 - 173.
Wild Cat Overlook from Below
October 26, 1939 - 174.
Wild Cat Rock
1940 - 175.
Heavy Slide
1940 - 176.
Grade Separation Structure Over US 21 Looking Northwest
1940 - 177.
View looking south on parkway
1940 - 178.
"Old Man of the Mountain" near the Falls of Dan, and only 1 mile north of the Pinnacles
Early 1940s - 179.
Flood Damage
August 17, 1940 - 180.
Rock Wall
February 18, 1941 - 181.
Rock Wall
February 18, 1941 - 182.
Rock Wall
February 18, 1941 - 183.
Rock Wall
February 18, 1941 - 184.
Trench
March 28, 1941 - 185.
Guard wall (sample sec.) Show rear elevation of wall and rear batter.
August 1941 - 186.
Brinegar Cabin, Spring House, Spring Retaining Wall
January 1942 - 187.
Overpass Structure, Section 2M
January 1942 - 188.
Rock Embankment
April 10, 1942 - 189.
Rock Embankment
April 10, 1942 - 190.
Fill Slope where Slide Continues, Post Construction
May 6, 1942 - 191.
Ice Rock
June 11, 1942 - 192.
Narrows at Bluff Park
June 11, 1942 - 193.
Ice Rock
June 11, 1942 - 194.
Slide in Ditch Line
June 11, 1942 - 195.
Removing Rock Slide
July 7, 1942 - 196.
Removing rock slide from ditch line
August 26, 1942 - 197.
From portal of tunnel looking south
November 4, 1942 - 198.
Finished Roadway
November 4, 1942 - 199.
Explosion View of Portal of Tunnel
November 4, 1942 - 200.
Finished Roadway
November 4, 1942 - 201.
Tunnel Portal
January 6, 1943 - 202.
Tunnel #1 West Portal
April 28, 1943 - 203.
Tunnel No. 1 East Portal
April 28, 1943 - 204.
Tunnel No. 1 West Portal
April 28, 1943 - 205.
Tunnel #1 West Portal
April 28, 1943 - 206.
Balsam, Grading, and Ranger Smith and Liles
July 1944 - 207.
Shovel Working Construction
April 12, 1945 - 208.
Parkway near Mahogany Rock P.O.
1946 - 209.
Scenic Views, Parkway N.C.
June 1946 - 210.
Camp Creek Bridge
June 1946 - 211.
Parkway near Devils Garden P.O.
June 1946 - 212.
Upper Falls, Linville Falls
June 1946 - 213.
Tunnel
June 1946 - 214.
Craggy Pinnacle Tunnel
June 1946 - 215.
Blue Ridge Parkway at Ice Rock
June 1946 - 216.
Tunnel 819
June 1946 - 217.
Cross rocks, looking south
November 15, 1946 - 218.
Cross rocks, looking northeast
November 15, 1946 - 219.
Cross rocks looking north
November 15, 1946 - 220.
Cross rocks, looking northeast
November 15, 1946 - 221.
Cross rocks looking N.W.
November 15, 1946 - 222.
Interpretive sign for Caudill Cabin at Wildcat Rock Overlook
April 1947 - 223.
Rock Embankment
June 1947 - 224.
Relocation Rte 43 Cut station
September 1947 - 225.
Sharp Top Trail
April 1948 - 226.
Sharp Top Trail
April 1948 - 227.
Views of Sharp Top Trail
April 28, 1948 - 228.
Sharp Top Trail
April 28, 1948 - 229.
Section 2F near Blowing Rock, N.C.
September 1948 - 230.
Thrasher accident of Sept 19, 1948 showing points of impact; rock wall
September 26, 1948 - 231.
Peaks of Otter Sharp Top pedestrian shelter and parking area
July 8, 1949 - 232.
Sharp Top pedestrian shelter and parking area
July 8, 1949 - 233.
Peaks of Otter. Sharp Top pedestrian shelter and parking area
July 8, 1949 - 234.
Sharp Top Pedestrian Shelter and Parking Area
July 8, 1949 - 235.
Peaks of Otter. Sharp Top pedestrian shelter and parking area
July 8, 1949 - 236.
Fill settlement and slide
1951 - 237.
Rock Wall, Project 2M2
February 27, 1951 - 238.
Slide Near Crabtree Meadows
November 1951 - 239.
Shelter, Sharp Top
1952 - 240.
Sharp Top
1952 - 241.
View of Automobile and Rock
February 8, 1952 - 242.
Fallen rock
February 8, 1952 - 243.
Rock with Leaves
February 8, 1952 - 244.
Rock Slide
May 19, 1952 - 245.
Construction Site
June 3, 1953 - 246.
Road Construction
June 3, 1953 - 247.
Rocky Overhang
April 1, 1954 - 248.
Drilling for Blasting in a Mica Mine in North Carolina
1955 - 249.
Rock Slide on Gillespie Gap
February 20, 1955 - 250.
Mining mica from open pit
Spring 1955 - 251.
Work Site
May 4, 1955 - 252.
#22, Picnic Area
October 9, 1955 - 253.
Camp rock near Craggy Pinnacle
March 1956 - 254.
Proposed Exhibit Planned by W. M. Graham for the Museum of N. C. Minerals
November 1956 - 255.
Rock Slide
April 3, 1957 - 256.
Bridge Construction
July 30, 1957 - 257.
Garnets in Geiss
September 1958 - 258.
South-east Wing Wall
November 14, 1958 - 259.
Garnets in Schist
January 14, 1959 - 260.
Garnets in Schist
January 14, 1959 - 261.
Waterrock Knob
September 17, 1959 - 262.
Upturned strata
October 1959 - 263.
Parkway with Waterrock Knob in background
October 1959 - 264.
Crabtree Falls Nature Walk
1960s - 265.
Interpretive Sign - Mt. Airy Granite
July 1964 - 266.
Interpretive Sign - Mt. Airy Granite
July 1964 - 267.
Exhibit Panel
August 1965 - 268.
GARNETS Exhibit
August 1965 - 269.
Flat Rock Trail Repair
1970s - 270.
Rock Slides
1970s - 271.
Slides
1970s - 272.
Slides
1970s - 273.
Slides
1970s - 274.
Slides
1970s - 275.
Berm Erosion
June 5, 1973 - 276.
Rock and mud slides heavy rains
June 5, 1973 - 277.
Rock Slide
June 5, 1973 - 278.
Road Patching
June 5, 1973 - 279.
Rock and Mud Slides from Heavy Rains
June 5, 1973 - 280.
Mountain Climbing Practice
July 28, 1973 - 281.
Mountain climbing practice
July 28, 1973 - 282.
Mountain Climbing Practice
July 28, 1973 - 283.
Mountain Climbing Practice
July 28, 1973 - 284.
Mountain Climbing Practice
July 28, 1973 - 285.
Mountain Climbing Practice
July 28, 1973 - 286.
Crabtree Meadows
July 31, 1973 - 287.
Big Spring
August 1973 - 288.
Beacon Heights
August 9, 1973 - 289.
Geology Tour
August 16, 1973 - 290.
Construction Work
September 18, 1973 - 291.
Construction Work
September 18, 1973 - 292.
Construction Work
September 18, 1973 - 293.
Construction Work
September 18, 1973 - 294.
Grandfather Mtn. Construction
October 23, 1973 - 295.
Grandfather Mtn. Construction
October 23, 1973 - 296.
Grandfather Mtn. Construction
October 23, 1973 - 297.
Grandfather Mtn. Construction
October 23, 1973 - 298.
Grandfather Mtn. Construction
October 23, 1973 - 299.
Construction, South End of Grandfather Mtn. Project
November 29, 1973 - 300.
Vandalism (Painting)
March 1974 - 301.
Crafts
May 31, 1974 - 302.
Crafts - Mining Emeralds
June 6, 1974 - 303.
Crafts - Mining Emeralds
June 6, 1974 - 304.
Grandfather Mtn. Progress
October 1975 - 305.
Parkway Environmental Preservation
October 1975 - 306.
Grandfather Mtn. Progress
October 1975 - 307.
Linville River near Falls
August 1978 - 308.
Linville River near Falls
August 1978 - 309.
Linville River near Falls
August 1978 - 310.
Linville River near Falls
August 1978 - 311.
Linville River near Falls
August 1978 - 312.
Linville River near Falls
August 1978 - 313.
Color Time Traffic
October 13, 1978 - 314.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 315.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 316.
Grandfather Mtn. Road/Bridge Construction
October 2, 1981 - 317.
Construction - Grandfather Mountain
October 18, 1973
Refine Your Search
Types (1)
Photographs (317)Locations (99)
Section 2M (56) Section 2C (33) Grandfather Mountain (14) Section 2A (11) Sharp Top Mountain (Va.) (11) Milepost 242 (9) Linville Falls (8) Undetermined (7) Museum of North Carolina Minerals (6) Bear Den Campground (5) See All ResultsSections (25)
2M (65) 2C (56) 2A (30) 2L (18) 1K (16) 2H (16) 2B (14) 2J (14) 2K (9) 2P (9) See All ResultsCounties (17)
Alleghany (100) Yancey (64) Avery (31) Bedford (21) McDowell (17) Buncombe (14) Mitchell (14) Transylvania (11) Haywood (6) Wilkes (5) See All Results



