Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
NP 21 before planting
1938 - 2.
Rock Overcast - Cleared and Obliterated
1938 - 3.
Construction Bear Den Parking Overlook
1938 - 4.
Excavation for principal footing retaining wall
1938 - 5.
Shoulder construction, High Piney Ridge in background
1938 - 6.
Wall at Bear Den Parking Overlook
1938 - 7.
Alignment near inlet large culvert
1938 - 8.
Rock cut at Devil's Garden
1938 - 9.
Stream to be treated by standard box culvert
1938 - 10.
Cumberland Park Pump House
January 5, 1938 - 11.
Mahogany Rock Parking Overlook after grading
January 24, 1938 - 12.
South parapet, west abutment
January 24, 1938 - 13.
Viaduct
January 24, 1938 - 14.
Cumberland Knob Slope flattening at entrance
January 24, 1938 - 15.
South wingwall of viaduct during construction
February 15, 1938 - 16.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 17.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 18.
Wildcat Rock and Lodge Parking area (proposed)
March 1938 - 19.
Sheep Hill Brand Lodge Site and proposed water storage
March 1938 - 20.
Rock spillage in ravine under structure, foreground
March 8, 1938 - 21.
Spillage (smaller rock above) from excavation for north abutment of viaduct
March 8, 1938 - 22.
Base of wing wall during construction
March 8, 1938 - 23.
Wall alignment at point where new section added
March 8, 1938 - 24.
Excessive rock spillage in ravine from cut
March 8, 1938 - 25.
Extensive fill scars developing in heavy (rock) construction
March 8, 1938 - 26.
Road construction to picnic area
March 12, 1938 - 27.
View of road
March 12, 1938 - 28.
Bridge - Grassy Gap Road
March 12, 1938 - 29.
Road on Top of Hills
March 12, 1938 - 30.
Bridge - Grassy Gap Road
March 12, 1938 - 31.
Picnic Table
March 12, 1938 - 32.
The Bluff Crusher and Parkway
March 12, 1938 - 33.
Picnic Table
March 12, 1938 - 34.
Piers and south abutment during construction
March 28, 1938 - 35.
Mt. Mitchell; game preserve below
April 19, 1938 - 36.
North portal of #1 tunnel
April 19, 1938 - 37.
Mt. Mitchell; Game Preserve Below
April 19, 1938 - 38.
Devil's Garden Parking and Overlook after Grading
April 21, 1938 - 39.
Wood tract Pierce Collins estate
April 21, 1938 - 40.
Front of barn as it would be seen from the parkway.
April 21, 1938 - 41.
Barn proposed for acquisition. Note logs and shake roof.
April 21, 1938 - 42.
Taken to show log corner detail -- underexposed
April 21, 1938 - 43.
Looking Down the Back Side of thru Rock Cut
April 25, 1938 - 44.
Rock Overcast on Lower Side thru Cut, Before Cleanup
April 25, 1938 - 45.
Large rock fragments over cast on lower of the rock cut as a result of overshooting
April 25, 1938 - 46.
Rock overcast at lower side through rock cut
April 25, 1938 - 47.
Lower side thru rock cut at 335 strewn with rock due to overshooting
April 25, 1938 - 48.
Looking West from One of the Parking Areas South of Cumberland Knob
April 27, 1938 - 49.
Shelter on Top of Cumberland Knob
April 27, 1938 - 50.
View from Bear Den parking overlook
May 7, 1938 - 51.
Careful and careless land use
May 7, 1938 - 52.
Wall construction Bear Den Parking Overlook
May 7, 1938 - 53.
Example of careless blasting from cut
May 7, 1938 - 54.
Forest Clearing
May 11, 1938 - 55.
Shortoff Mt and Lake James
June 1938 - 56.
Mt. Mitchell from Mitchell view parking overlook
June 1938 - 57.
Looking back toward Mt. Mitchell view parking overlook site
June 1938 - 58.
Looking back from tunnel
June 1938 - 59.
Viaduct
June 1938 - 60.
Excavation for Special Footings - CSM Wall
June 1938 - 61.
Proposed wall site
June 1938 - 62.
Finish Grading
June 1938 - 63.
CCC Camp just moving in
June 1938 - 64.
Viaduct
June 1938 - 65.
Tunnel #2 looking back
June 1938 - 66.
Big Cut at Devil's Garden
June 14, 1938 - 67.
60ft cut at Devils Garden
June 14, 1938 - 68.
Table Rock
July 14, 1938 - 69.
South portal tunnel #1
June 25, 1938 - 70.
Fill scar, slide area and overcast material
June 25, 1938 - 71.
Fill scar, slide area, and overcast material
June 25, 1938 - 72.
Fill scar area and overcast material
June 25, 1938 - 73.
South portal tunnel #1
June 25, 1938 - 74.
South portal tunnel #1
June 25, 1938 - 75.
South portal tunnel #1
June 25, 1938 - 76.
South portal tunnel #1
June 25, 1938 - 77.
Fill scar area and overcast material
June 25, 1938 - 78.
Shortoff Mountain
July 1938 - 79.
Grade separation Class B masonry and concrete barrel
July 1, 1938 - 80.
Water Fountain
July 1938 - 81.
Grade separation, south elevation
July 1938 - 82.
Signs near parking area
July 1, 1938 - 83.
Return Cabin Loop to Camping Loop
July 11, 1938 - 84.
Inside of wall parking area
July 11, 1938 - 85.
Dam site and watershed
July 11, 1938 - 86.
Face of Wall in Woods
July 11, 1938 - 87.
West Abutment, Overpass US 21
July 12, 1938 - 88.
Bluff Park from lodge site
July 12, 1938 - 89.
Retaining Wall Picnic Area
July 12, 1938 - 90.
Stack Rock
July 13, 1938 - 91.
Linville Valley & Boy's Camp
July 15, 1938 - 92.
Grandfather Mountain
July 15, 1938 - 93.
Grandfather Mountain
July 15, 1938 - 94.
Grandfather Mountain
July 15, 1938 - 95.
Linville Golf Course and Village
July 15, 1938 - 96.
Grandfather Mountain
July 15, 1938 - 97.
Slope on Parkway
July 16, 1938 - 98.
Grandfather Mountain
July 18, 1938 - 99.
Before grading. Cave-in on 1:1 slope. Will continue to slide unless flattened. Needs rounding.
July 25, 1938 - 100.
Before grading. Steep, rotten rock cuts, shoulder and ditch. 2 ft short
July 25, 1938 - 101.
Before grading. Rotten rock 1:1; ditch too narrow ugly profile.
July 25, 1938 - 102.
Before grading. A 3/4 to 1 slope with almost vertical overhang of soft rock
July 25, 1938 - 103.
Before grading. Tape used to show concave slope. Needs transition, overhand and wide rounding
July 25, 1938 - 104.
Unpaved roadway with erosion
July 25, 1938 - 105.
Before grading. Cleared to connect slope line, with rock as excuse for steep slope. Ugly profile.
July 25, 1938 - 106.
Black Rock Mt on Plott Balsam Range From tower near Soco Bald
July 26, 1938 - 107.
Panorama 1B and 1A Plott Balsom Range
July 26, 1938 - 108.
Clingman Drive Center from Tower near Soco Bald
July 26, 1938 - 109.
Water Rock Knob
July 26, 1938 - 110.
Burkes Creek Fire Tower near Big Witch Creek
July 26, 1938 - 111.
Falls along NC road
July 27, 1938 - 112.
From Devils Courthouse - Showing Rocky Mt., Chimney Gap Mt., and Sheep Cliff Mt.
July 27, 1938 - 113.
Jones Knob-Waterrock in distance
July 27, 1938 - 114.
Falls along NC road
July 27, 1938 - 115.
Looking glass falls
July 27, 1938 - 116.
Devils Court House
July 27, 1938 - 117.
Excavating through rock for culvert
July 28, 1938 - 118.
Overpass Site
July 29, 1938 - 119.
Washout at headwall. Shows need of different type of structure.
August 1, 1938 - 120.
Site for proposed parking area
August 1, 1938 - 121.
Construction of Camp Creek Bridge
August 12, 1938 - 122.
Construction of U.S. 221 overpass from state highway
August 16, 1938 - 123.
Shovel working on top of 100' cut
August 16, 1938 - 124.
Bear Den Cliff at proposed revision
August 16, 1938 - 125.
Construction of overpass U.S. 221
August 16, 1938 - 126.
Shovel working on top of 100' cut
August 16, 1938 - 127.
Overpass Structure
August 28, 1938 - 128.
Example of Effective Holding In, or Fill by Laying Fill
August 31, 1939 - 129.
Example of good alignment without layout but with good inspection
August 31, 1939 - 130.
Example of good alignment without layout but with good inspection parapet wall
August 31, 1939 - 131.
Overpass structure 2b-3 North Elevation Bridge over US 221 Roaring Gap
September 8, 1938 - 132.
Water Storage Tank, Cabin Area
September 28, 1938 - 133.
Clearing for Water Supply Reservoir
September 28, 1938 - 134.
Entrance road to lodge site
September 28, 1938 - 135.
Construction Unit Water Storage North End of Dam
September 28, 1938 - 136.
Slope before grading. Showing steep over-burden and talus concealing rock. Ledges before grading.
October 1938 - 137.
Slope during grading
October 1938 - 138.
Slope during grading
October 1938 - 139.
Slope during grading
October 1938 - 140.
Tunnel #1 cut during excavation
October 1938 - 141.
Tunnel #1 cut during excavation
October 1938 - 142.
Slope during grading
October 1938 - 143.
Cut before grading
October 2, 1938 - 144.
Northwest elevation showing grading.
October 3, 1938 - 145.
Cut before grading
October 4, 1938 - 146.
Fill before grading
October 4, 1938 - 147.
Fill Before Grading
October 6, 1938 - 148.
Southwest wing and Spandrel Wall Masonry, under men to be removed because of stacking
October 18, 1938 - 149.
Spandrel Wall - Rubble wing wall and concrete vault
October 18, 1938 - 150.
Before grading operation and clean-up, looking north
October 18, 1938 - 151.
Expansion joints at junction of spandrel and wing walls
October 18, 1938 - 152.
Cut before grading
October 21, 1938 - 153.
Cut before grading
October 21, 1938 - 154.
Cut before grading
October 21, 1938 - 155.
Cut before grading
October 21, 1938 - 156.
Peaks of Otter Existing Overnight Cabins and Collection Gate
October 29, 1938 - 157.
Fire tower and building on top of Sharp Top
October 29, 1938 - 158.
Existing building on top of Sharp Top, taken from highest point
October 29, 1938 - 159.
Mt Mitchell and Roan Mt from Mt Mitchell view overlook
November 5, 1938 - 160.
Mt Mitchell and Roan Mt from Mt. Mitchell View Overlook
November 5, 1938 - 161.
North end of former tunnel
November 5, 1938 - 162.
Fill, before grading
November 7, 1938 - 163.
Fill, before grading
November 7, 1938 - 164.
Cut, before grading
November 11, 1938 - 165.
North end of former tunnel
November 8, 1938 - 166.
Cut before grading, looking back
November 22, 1938 - 167.
Cut before grading, looking back
November 22, 1938 - 168.
Cut before grading, looking back
November 22, 1938 - 169.
After Cleanup of Excessive Overcast Material
November 29, 1938 - 170.
After clean-up of excessive overcast material
November 29, 1938 - 171.
Before grading
December 1938 - 172.
Before grading
December 1938 - 173.
Before grading
December 1938 - 174.
Excessive overcast yardage from bench cut in rock, looking down from shoulder
December 1938 - 175.
Excessive overcast yardage from bench cut in rock
December 1938 - 176.
Before Grading
December 1938 - 177.
Before grading
December 1938 - 178.
Slope during L.D. grading
December 12, 1938 - 179.
Slope before L.D. grading
December 12, 1938 - 180.
High cuts thru wooded area. During selective cutting.
December 15, 1938 - 181.
Before grading. Looking back across Hare Mill Pond
December 15, 1938
Refine Your Search
Types (1)
Photographs (181)Locations (70)
Doughton Park (10) Milepost 369 (10) Milepost 239 (8) Section 2A (8) Mount Mitchell (6) Milepost 230 (5) Milepost 241 (5) Milepost 319 (5) Bear Den Campground (4) Big Laurel Mountain Viaduct (4) See All ResultsSections (22)
2C (39) 2A (30) 2K (18) 2P (15) 2N (14) 2M (10) 2J (9) 2B (7) 2D (6) 1S (4) See All ResultsCounties (16)
Alleghany (76) McDowell (21) Avery (18) Buncombe (15) Yancey (8) Ashe (7) Jackson (7) Mitchell (6) Patrick (4) Bedford (3) See All Results



