Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Brinegar Cabin Parking Area
January 1942 - 2.
Brinegar cabin Spring house Framing details
January 1942 - 3.
Brinegar cabin Spring house reframing details
January 1942 - 4.
Before stream bank improvement
1942 - 5.
Buck Creek Gap Overpass
January 1942 - 6.
Brinegar Cabin Spring House existing structure
January 1942 - 7.
Stable - Two Horses, Construction Details
January 1942 - 8.
Stable - Two Horses, Construction Details
January 1942 - 9.
Buck Creek Gap Overpass
January 1942 - 10.
Brinegar Cabin. Spring House Existing Structure
January 1942 - 11.
Buck Creek Gap Overpass
January 1942 - 12.
Buck Creek Gap Overpass
January 1942 - 13.
Brinegar Cabin, Spring House, Spring Retaining Wall
January 1942 - 14.
Covered bridge near Floyd, VA Underfloor
1942 - 15.
Covered bridge near Floyd, VA Abutment failure
1942 - 16.
Comfort station, Picnic Area #1
1942 - 17.
Covered bride near Floyd, VA Latice [Lattice], 3 1/4 x 12" pine; Ledges 3 1/4 x 14" pine; dowels 2" dia oak
1942 - 18.
Brinegar Cabin Parking Area and Entrance Road from the Parkway
January 1942 - 19.
Brinegar Cabin - parking area, heavy excavation
January 1942 - 20.
Buck Creek Gap Overpass
January 1942 - 21.
Brinegar Cabin Spring House Reframing Details
January 1942 - 22.
Spring House Brinegar Cabin Bldg #163
1942 - 23.
Overpass Structure, Section 2M
January 1942 - 24.
Brinegar Cabin riving roof boards
January 1942 - 25.
Brinegar cabin - parking area Entrance road from Parkway
January 1942 - 26.
Brinegar Cabin Spring House Building reconstructed
February 1942 - 27.
Brinegar Cabin Spring House
February 1942 - 28.
Brinegar Cabin Store House
February 1942 - 29.
Snow, drifts 10-20 ft high
March 1942 - 30.
Brinegar cabin restoration Roof boards replaced
March 1942 - 31.
Snow. Austin-Weston grader used to clear road
March 1942 - 32.
Snow, WPA clearing the road
March 1942 - 33.
Snow, drifts 10-20 ft high
March 1942 - 34.
Snow WPA Clearing the Road
March 1942 - 35.
Snow. Austin-Weston grader used to clear road.
March 1942 - 36.
Snow, Austin-Weston Grader Used to Clear Road
March 1942 - 37.
Rock Embankment
April 10, 1942 - 38.
Rock Embankment
April 10, 1942 - 39.
Fill Slope where Slide Continues, Post Construction
May 6, 1942 - 40.
Harkening Hill
May 28, 1942 - 41.
Big Lynn Tree. Showing after having dangerous branches removed.
May 28, 1942 - 42.
Big Lynn Tree. Showing tree after having dangerous branches removed.
May 28, 1942 - 43.
Big Lynn Tree. Showing tree after having dangerous branches removed.
May 28, 1942 - 44.
Rail fences
May 30, 1942 - 45.
Rail fences
May 30, 1942 - 46.
Devil's Backbone parking overlook
May 30, 1942 - 47.
near Rakes Mill Pond
May 30, 1942 - 48.
Blacksmith Shop
June 1942 - 49.
Blacksmith Shop
June 1942 - 50.
Blacksmith Shop
June 1942 - 51.
Clearing-Mill Pond Site
June 1942 - 52.
Clearing-Mill Pond Site
June 1942 - 53.
Flume construction-main branch
June 1942 - 54.
Flume construction-main branch
June 1942 - 55.
Blacksmith Shop
June 1942 - 56.
Flume construction-main branch
June 1942 - 57.
Water-wheel shaft
June 1942 - 58.
Flume construction-main branch
June 1942 - 59.
Water-wheel construction
June 1942 - 60.
Water-wheel construction
June 1942 - 61.
Flume construction-main branch
June 1942 - 62.
Clearing-Mill Pond Site
June 1942 - 63.
Mabry Mill Mill Pond Site Old wheel removed
June 1942 - 64.
Water-wheel shaft in place
June 1942 - 65.
Mabry Mill - Residence to be removed
June 1942 - 66.
Water-wheel shaft
June 1942 - 67.
Water-wheel shaft
June 1942 - 68.
Water-wheel shaft
June 1942 - 69.
Blacksmith Shop (Making shakes)
June 1942 - 70.
30" timber for water-wheel shaft
June 1942 - 71.
Water-wheel shaft
June 1942 - 72.
Ice Rock
June 11, 1942 - 73.
Narrows at Bluff Park
June 11, 1942 - 74.
Slide in Ditch Line
June 11, 1942 - 75.
Ice Rock
June 11, 1942 - 76.
Bedford power line crossing
June 24, 1942 - 77.
Gully and Sheet Erosion
July 1, 1942 - 78.
Water-wheel construction
July 1942 - 79.
Water-wheel construction
July 1942 - 80.
Water-wheel construction
July 1942 - 81.
Flume construction-main branch
July 1942 - 82.
Water-wheel construction
July 1942 - 83.
Water-wheel construction
July 1942 - 84.
Water-wheel construction
July 1942 - 85.
Flume construction
July 1942 - 86.
Blacksmith Shop
July 1942 - 87.
Water-wheel construction
July 1942 - 88.
Water-wheel construction
July 1942 - 89.
Water-wheel construction
July 1942 - 90.
Water-wheel construction
July 1942 - 91.
Water-wheel construction
July 1942 - 92.
Removing Rock Slide
July 7, 1942 - 93.
Spreading Calcium Chloride
July 7, 1942 - 94.
Operators Signs
July 10, 1942 - 95.
Operator's Sign
July 10, 1942 - 96.
Operator's Sign Approach from S
July 10, 1942 - 97.
Operator Sign
July 10, 1942 - 98.
Operators Sign
July 10, 1942 - 99.
Operator Sign, Lunch Room, Comfort Station
July 10, 1942 - 100.
Operator Sign (Lunch room, comfort station)
July 10, 1942 - 101.
Operator's Sign Approach from South
July 10, 1942 - 102.
Operators Signs, Approach from N
July 10, 1942 - 103.
Operators Signs Approach from N
July 10, 1942 - 104.
Refreshments Sign
July 10, 1942 - 105.
Operator's Sign - Approach from S
July 10, 1942 - 106.
Completed Ditch Line
July 20, 1942 - 107.
Lumber Stacks
August 1942 - 108.
Flume construction
August 1942 - 109.
Mabry Mill Pictures of tourists taking pictures
August 1942 - 110.
Sorghum Mill
August 1942 - 111.
Removing rock slide from ditch line
August 26, 1942 - 112.
Gully and sheet erosion, large pasture with active sheet erosion.
September 1942 - 113.
Guard post placed by post construction
September 9, 1942 - 114.
Mt. Mitchell thru Buck Creek Cap Overpass
September 10, 1942 - 115.
Buck Creek Gap Overpass
September 10, 1942 - 116.
Buck Creek Gap Overpass
September 10, 1942 - 117.
Wagon Road Gap
September 10, 1942 - 118.
Alleghany County
September 11, 1942 - 119.
Cascades Overlook
September 11, 1942 - 120.
Cascades
September 11, 1942 - 121.
Rail Fences
September 11, 1942 - 122.
Parkway
September 11, 1942 - 123.
Little Glade Pond
September 11, 1942 - 124.
Cascades
September 11, 1942 - 125.
Fox Hunters Paradise
September 11, 1942 - 126.
Cascades Overlook
September 11, 1942 - 127.
Ice Rock
September 11, 1942 - 128.
Little Glade Pond
September 11, 1942 - 129.
Cascades Overlook
September 11, 1942 - 130.
Alleghany County
September 11, 1942 - 131.
C.K. Marker Stone Cumberland Knob
September 12, 1942 - 132.
Parkway
September 12, 1942 - 133.
Access A
September 18, 1942 - 134.
Farming
October 1942 - 135.
Northwest bridge slope after seeding
October 1942 - 136.
Parkway crossing county road
October 22, 1942 - 137.
Rubble Headwall
October 23, 1942 - 138.
Pkwy from Rt. 56 after grading, seeding & mulching
October 23, 1942 - 139.
Tire heating, fitting and quenching trough
November 1942 - 140.
Stile over flume
November 1942 - 141.
Tire bending rack
November 1942 - 142.
Wheelwright shop setup
November 1942 - 143.
Soil Erosion Before Erosion Control Work
November 1942 - 144.
Soil Erosion Before Erosion Control Work
November 1942 - 145.
Roof "boards" ricked for drying
November 1942 - 146.
Riving "boards" from "bolt"
November 1942 - 147.
Footbridge and path loop to waterwheel
November 1942 - 148.
Finished Roadway
November 4, 1942 - 149.
Finished Roadway
November 4, 1942 - 150.
Explosion View of Portal of Tunnel
November 4, 1942 - 151.
From portal of tunnel looking south
November 4, 1942 - 152.
Fill after grading and seeding
November 6, 1942 - 153.
Blocking of grating by leaves
November 6, 1942
Refine Your Search
Types (1)
Photographs (153)Locations (44)
Mabry Mill (Va.) (49) Brinegar Cabin (14) Cumberland Knob (12) Section 2M (8) Buck Creek Gap (7) E.B. Jeffress Park (4) Section 2C (4) Section 2V (4) Milepost 162 (3) Milepost 408 (3) See All ResultsSections (21)
1T (49) 2C (29) 2M (16) 2A (14) 1R (9) 2E (6) 2B (5) 2V (4) 2L (3) 2T (3) See All ResultsCounties (13)
Floyd (59) Alleghany (48) Yancey (16) Wilkes (5) Haywood (4) Transylvania (4) McDowell (3) Ashe (2) Augusta (2) Bedford (2) See All Results



