Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Land Acquisition Maps Section 2-B
1937 - 2.
Gaunt dead chestnut against woods background.
1937 - 3.
Road and Parking Area
1937 - 4.
Building - razed
January 12, 1937 - 5.
Lakes-To-Florida Highway Is Being Improved In Co.
January 21, 1937 - 6.
Route 18 Crossing
February 2, 1937 - 7.
Route 18 Intersection
February 2, 1937 - 8.
Cumberland Knob Drive
February 2, 1937 - 9.
Finished Slopes
February 2, 1937 - 10.
Curved Road
February 2, 1937 - 11.
Men cleaning gutter
February 2, 1937 - 12.
Intersection Corner
February 2, 1937 - 13.
Cumberland Knob Parking
February 2, 1937 - 14.
Unsurfaced Road
February 2, 1937 - 15.
Drain Wall
February 2, 1937 - 16.
Early construction
February 2, 1937 - 17.
Car on Road
February 2, 1937 - 18.
Winding Road
February 2, 1937 - 19.
Completed Road
February 2, 1937 - 20.
Bridge Arch
February 3, 1937 - 21.
Bridge Abutment
February 4, 1937 - 22.
Bridge Construction
February 4, 1937 - 23.
Bridge #9 construction
February 4, 1937 - 24.
Bridge #8
February 4, 1937 - 25.
Bridge Construction
February 4, 1937 - 26.
Rock embankment and culvert
February 4, 1937 - 27.
Construction materials
February 4, 1937 - 28.
Rock embankment and stream
February 4, 1937 - 29.
Early Construction
February 5, 1937 - 30.
Early construction
February 8, 1937 - 31.
Rock cut and tunnel
February 8, 1937 - 32.
View of road
February 8, 1937 - 33.
Road and tunnel
February 8, 1937 - 34.
Retaining Wall
February 8, 1937 - 35.
View of road
February 8, 1937 - 36.
Road and rock pile
February 8, 1937 - 37.
Cement stone wall
February 10, 1937 - 38.
Cleared ridge
February 10, 1937 - 39.
Retaining Wall
February 10, 1937 - 40.
Ahead along line
February 10, 1937 - 41.
Rock formation 46' right
February 26, 1937 - 42.
Timber cutting on ROW by Linville Lumber
February 26, 1937 - 43.
Rock formation 75' right
February 26, 1937 - 44.
Wood cutting on Cannaday property
March 10, 1937 - 45.
Wood cutting A.C. Nolen
March 10, 1937 - 46.
Wood cutting A.C. Nolen
March 10, 1937 - 47.
Bridge at site #7 Steel construction, looking back from south abutment
March 29, 1937 - 48.
North abutment and stringers
March 29, 1937 - 49.
East parapet wall south abutment
March 29, 1937 - 50.
Bridge at Site #7, Steel Construction
March 29, 1937 - 51.
Bridge at site #7 Steel construction
March 29, 1937 - 52.
Bridge at site #7, Steel stringers
March 29, 1937 - 53.
Cutting for telephone line on right-of-way line
March 30, 1937 - 54.
Sheets Gap parking overlook
April 1, 1937 - 55.
Culvert headwall
April 1, 1937 - 56.
Sand blown up on cut
April 1, 1937 - 57.
Culvert headwall
April 1, 1937 - 58.
Inlet culvert headwalll
April 1, 1937 - 59.
Thoroughfare (left) cut through during winter because of impassibility of proper access road (right)
April 1, 1937 - 60.
Culvert Headwall
April 2, 1937 - 61.
Grading at Benge
April 2, 1937 - 62.
Culvert Headwall
April 2, 1937 - 63.
Hand-laid rock embankment
April 2, 1937 - 64.
Hand-laid rock embankment
April 2, 1937 - 65.
Underside of bridge
April 6, 1937 - 66.
Riveters working
April 6, 1937 - 67.
Roosevelt Says Work On Parkway Is To Be Finished
April 9, 1937 - 68.
View of road
April 10, 1937 - 69.
View of bridge #4
April 10, 1937 - 70.
Unfinished road and bridge
April 10, 1937 - 71.
Rail details
April 10, 1937 - 72.
Bridge Construction
April 10, 1937 - 73.
Detail of expansion dam
April 10, 1937 - 74.
Detail Pier #2
April 10, 1937 - 75.
Landscape North to Bridge #6
April 10, 1937 - 76.
Bridge #6
April 10, 1937 - 77.
View of bridge
April 10, 1937 - 78.
Detail of expansion dam
April 10, 1937 - 79.
Rail construction
April 10, 1937 - 80.
View of road
April 10, 1937 - 81.
View near Junction of 2A/2B
April 12, 1937 - 82.
Landscape at Sections 2A and 2B
April 12, 1937 - 83.
Bridge #10 and Stream
April 12, 1937 - 84.
Bridge #8
April 12, 1937 - 85.
View of Junction of 2A and 2B
April 12, 1937 - 86.
Bridge Rock Detail
April 12, 1937 - 87.
Left End of Bridge #9
April 12, 1937 - 88.
View near Junction of 2A/2B
April 12, 1937 - 89.
Road fill along edge of rough road
April 13, 1937 - 90.
Loading Holes for Blasting
April 14, 1937 - 91.
South End of Quarry
April 14, 1937 - 92.
Sharp Curve Construction
April 14, 1937 - 93.
Preparing Sub-Grade
April 14, 1937 - 94.
Rough Grade Rock Fill
April 14, 1937 - 95.
Cutting by State Right of way party
April 15, 1937 - 96.
North Through Tunnel #1
April 22, 1937 - 97.
Looking North Through Tunnel #2
April 22, 1937 - 98.
Completed Cement Retaining Wall
April 22, 1937 - 99.
View of Road Above Tunnel #2
April 22, 1937 - 100.
Trail view from Flat Rock Knob
April 22, 1937 - 101.
Construction of Tunnel #2
April 22, 1937 - 102.
Portal To Tunnel #1
April 22, 1937 - 103.
Masonry Wall Building
April 22, 1937 - 104.
Loading Rock at Retaining Wall
April 22, 1937 - 105.
Trail down Belle Ridge
April 22, 1937 - 106.
Construction of Tunnel #2
April 22, 1937 - 107.
Retaining Wall Looking North
April 22, 1937 - 108.
Tunnel Construction
April 22, 1937 - 109.
Valley from trail on Flat Rock Knob
April 22, 1937 - 110.
Drill Operation
April 22, 1937 - 111.
Fire hazard reduction along trail. Belle Ridge
April 22, 1937 - 112.
Construction on Cement Retaining Wall
April 22, 1937 - 113.
Looking Through Tunnel #1
April 22, 1937 - 114.
Linn Tractor dumping
April 23, 1937 - 115.
wagon drilling
April 23, 1937 - 116.
Rock shot
April 23, 1937 - 117.
Rough grade cut
April 23, 1937 - 118.
Fishers Peak Park. Proposed lake area from dam. Horse Knob background
April 23, 1937 - 119.
View of Rock Cut
April 23, 1937 - 120.
Center line on Tunnel #1
April 27, 1937 - 121.
Overpass site US Route 52
May 3, 1937 - 122.
Looking back over bridge #5
May 4, 1937 - 123.
No. 5 Bridge, cost $17,520
May 4, 1937 - 124.
No.4 Arch Bridge, cost $12,000
May 4, 1937 - 125.
#9 Bridge, Down Stream, Cost $20,120
May 4, 1937 - 126.
Overpass construction
May 4, 1937 - 127.
Guard rail, No.7 bridge
May 4, 1937 - 128.
No.6 bridge, cost $15,139
May 4, 1937 - 129.
Station 563 No 8 Bridge cost $34,053
May 4, 1937 - 130.
No. 5 Bridge, Cost $17,520, Pine Creek Bridge #5
May 4, 1937 - 131.
Near Linville Post Office Overpass site U.S. Rte 221
May 5, 1937 - 132.
Overpass Site
May 5, 1937 - 133.
Cumberland Knob Park Picnic Road
May 7, 1937 - 134.
Seek to Restore Park Road Funds (page 1 of 3)
May 13, 1937 - 135.
Seek to Restore Park Road Funds (page 2 of 3)
May 13, 1937 - 136.
Seek to Restore Park Road Funds (page 3 of 3)
May 13, 1937 - 137.
Park Road Funds May Be Restored
May 15, 1937 - 138.
Bridge #4
May 18, 1937 - 139.
Bridge #7, approximate cost $45,000
May 18, 1937 - 140.
Bridge #5 42' span cost $17,520
May 18, 1937 - 141.
Bridge No. 3, 57' Span, Cost $19,462
May 18, 1937 - 142.
Underside of Viaduct
May 18, 1937 - 143.
Bridge No.2 49'10" span, cost $11,894
May 18, 1937 - 144.
Bridge #7 approximate cost $45,000
May 18, 1937 - 145.
Bridge #7, guard rail and pier detail
May 18, 1937 - 146.
Bridge no. 9, cost $20,120 24' span
May 18, 1937 - 147.
Mailbox on parkway
May 18, 1937 - 148.
Culvert headwall on culvert for access road
May 19, 1937 - 149.
Tree Well
May 20, 1937 - 150.
Tree wall
May 20, 1937 - 151.
Tree well
May 20, 1937 - 152.
Tree well
May 20, 1937 - 153.
Tree well
May 20, 1937 - 154.
Erosion
May 20, 1937 - 155.
Erosion
May 20, 1937 - 156.
Erosion
May 20, 1937 - 157.
Hand Placed Rock
May 20, 1937 - 158.
Completed Bridge #8
May 25, 1937 - 159.
Pine Creek Bridge #5
May 25, 1937 - 160.
Pine Creek Bridge #6
May 25, 1937 - 161.
Bridge #10
May 25, 1937 - 162.
Cars crossing Pine Creek Bridge #7
May 25, 1937 - 163.
Pine Creek Bridge #7
May 25, 1937 - 164.
Pine Creek Bridge #3
May 25, 1937 - 165.
Arch of Bridge #9
May 25, 1937 - 166.
Bridge #9
May 25, 1937 - 167.
Falls on Falls Creek
May 25, 1937 - 168.
Pine Creek Bridge #4
May 25, 1937 - 169.
House, former property of S.H. Boyd after moving by State. Fee simple line just beyond house.
May 25, 1937 - 170.
Bridge #2
May 25, 1937 - 171.
Drilling and Construction
May 26, 1937 - 172.
Hand Placed Rock embankment
May 26, 1937 - 173.
Road Construction
May 26, 1937 - 174.
Wagon Drills
May 26, 1937 - 175.
Icy Rock Curve
May 26, 1937 - 176.
Timber Cutting by M.C. iggerstaff
May 27, 1937 - 177.
Timber Cutting by M. C. Biggerstaff
May 27, 1937 - 178.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 179.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 180.
Timber Cutting by M.C. Biggerstaff
May 27, 1937 - 181.
Top View of Masonry Wall
May 29, 1937 - 182.
Detail of surrounding rocks
May 29, 1937 - 183.
Facing North from Masonry Wall
May 29, 1937 - 184.
Mountainside of timber to be cut by A.V. Millsap
June 1, 1937 - 185.
Old state box culvert to be removed
June 1, 1937 - 186.
Parkway box culvert
June 1, 1937 - 187.
Mountainside of timber to be cut by A. V. Millsap
June 1, 1937 - 188.
Letter from Heriot Clarkson to J. P. Dodge
June 4, 1937 - 189.
Sheets Gap Parking Overlook
June 6, 1937 - 190.
Rough headwall
June 8, 1937 - 191.
Rocky Knob; laurel in bloom in foreground
June 9, 1937 - 192.
Parkway looking towards the Haycocks
June 9, 1937 - 193.
Culvert headwall with circular well
June 9, 1937 - 194.
Some Day We Will Realize That Speed Mania Has To Be Curbed
June 10, 1937 - 195.
Cherokee Indian Reservation Is Of Great Interest To Visitors
June 13, 1937 - 196.
Mountain Laurel
June 14, 1937 - 197.
Mountain laurel in bloom by parkway
June 14, 1937 - 198.
Tree Well Construction
June 16, 1937 - 199.
Tree Well Construction
June 16, 1937 - 200.
Pier #4
June 22, 1937 - 201.
Pier #1
June 22, 1937 - 202.
Station 15# Pier #4
June 22, 1937 - 203.
Pier #1
June 22, 1937 - 204.
Special drainage structure
June 22, 1937 - 205.
Special drainage structure
June 22, 1937 - 206.
Useless backfill at base of cut slope
July 6, 1937 - 207.
Tree wells - rhododendrons
July 6, 1937 - 208.
Detail, interior face vaneer wing wall Viaduct
July 7, 1937 - 209.
Viaduct west abutment
June 7, 1937 - 210.
Viaduct, Pier #4
July 7, 1937 - 211.
Viaduct, form work, pier #3
July 7, 1937 - 212.
Viaduct, form work pier #3
July 7, 1937 - 213.
Folk Festival Planned At Indian Reservation (Page 2 of 2)
July 12, 1937 - 214.
Folk Festival Planned At Indian Reservation (Page 1 of 2)
July 12, 1937 - 215.
Culvert on side of slope above hollow
July 14, 1937 - 216.
Head wall and Stone Cement Channel
July 28, 1937 - 217.
Stone steps joining gutter
July 28, 1937 - 218.
Cement Stone Gutter
July 28, 1937 - 219.
Drilling and cleaning for stone wall at 255-35
July 28, 1937 - 220.
Preparations for Cement Wall
July 28, 1937 - 221.
Side view of access road to 2-C-1
July 28, 1937 - 222.
Cement Stone Gutter Along Rock Bank
July 28, 1937 - 223.
Dumping of Construction Material for replacing embankment
July 28, 1937 - 224.
Early Construction
July 30, 1937 - 225.
Lake Tahoma from Dam
August 1937 - 226.
Headwall to be changed to Drop Inlet
August 1937 - 227.
Pavilion on Lake Tahoma
August 1937 - 228.
Special headwall
August 1937 - 229.
Pavilion on Lake Tahoma
August 1937 - 230.
Cove of Lake Tahoma from Bridge NC #104
August 1937 - 231.
Pavilion on Lake Tahoma
August 1937 - 232.
Headwall placed too near center line.
August 1937 - 233.
Lake Tahoma from NC #104
August 1937 - 234.
Driveway across Lake Tahoma
August 1937 - 235.
Lower Side of Lake Tahoma
August 1937 - 236.
South End of Tunnel 1
August 4, 1937 - 237.
South End of Tunnel 2
August 4, 1937 - 238.
North Entrance of Tunnel 1
August 4, 1937 - 239.
Rock Slide at 576
August 5, 1937 - 240.
North Along Rough Grade at 581-50
August 5, 1937 - 241.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 242.
Quarry Operation for Masonry Material
August 5, 1937 - 243.
Partially Built Retaining Wall at 537
August 5, 1937 - 244.
Timber cutting and nuisance on right-of-way
August 7, 1937 - 245.
Parking overlook
August 18, 1937 - 246.
Valley view from post office
August 18, 1937 - 247.
Ice Rock Wall
August 18, 1937 - 248.
Letter from Francis O. Clarkson to R. G. Browning
August 18, 1937 - 249.
Saddle Mountain Valley, Lake Site from station 277
August 20, 1937 - 250.
Unknown variety of plant 6 - 7' high, yellow flowers in bloom
August 20, 1937 - 251.
Saddle Mountain Valley. Lake site, looking up at valley, woods opposite
August 20, 1937 - 252.
Saddle Mountain Valley, Lake Site
August 20, 1937 - 253.
Drop inlet
August 20, 1937 - 254.
Letter from R. Getty Browning to Francis O. Clarkson
August 20, 1937 - 255.
Letter from Heriot Clarkson to Francis O. Clarkson
August 23, 1937 - 256.
Letter from Francis O. Clarkson to Gov. Clyde R. Hoey
August 24, 1937 - 257.
Indians to Vote on Park Route
August 25, 1937 - 258.
Letter from Frank L. Dunlap to Francis O. Clarkson
August 27, 1937 - 259.
Letter from Clyde R. Hoey to Francis O. Clarkson
August 30, 1937 - 260.
Cumberland Knob Shelter Bldg #89
September 1937 - 261.
Letter from Daisy Marshall Bacot to Heriot Clarkson
September 1, 1937 - 262.
Letter from Heriot Clarkson to Francis O. Clarkson
September 2, 1937 - 263.
Letter from J. P. Dodge to Francis O. Clarkson
September 2, 1937 - 264.
View of road
September 3, 1937 - 265.
Stone masonry retaining wall
September 4, 1937 - 266.
Icy Rock Curve
September 4, 1937 - 267.
Culvert Cement Stone Gutter at Station 122-30
September 4, 1937 - 268.
Construction of Gutter at Station 108-60
September 4, 1937 - 269.
Icy Rock Retaining Wall with Crane
September 4, 1937 - 270.
Road Construction at Station 201-55
September 4, 1937 - 271.
Road Construction at Station 32
September 4, 1937 - 272.
Retaining Wall and unfinished slope of Icy Rock
September 4, 1937 - 273.
Retaining Wall along Icy Rock
September 4, 1937 - 274.
Construction of Gutter at Inlet Towards Station 28
September 4, 1937 - 275.
Gutter Work along Rock Face
September 4, 1937 - 276.
Stone and iron culvert
September 4, 1937 - 277.
Letter from Heriot Clarkson to Francis O. Clarkson
September 6, 1937 - 278.
Fill Slide
September 9, 1937 - 279.
South Entrance Tunnel #1
September 9, 1937 - 280.
Rough grade road
September 9, 1937 - 281.
Deep Rock Cut
September 9, 1937 - 282.
Crushing Plant
September 9, 1937 - 283.
Hoist On A Fordson Tractor
September 9, 1937 - 284.
Viaduct Pier #4
September 12, 1937 - 285.
Viaduct pier #4
September 12, 1937 - 286.
Viaduct Pier #4
September 12, 1937 - 287.
Tunnel Excavation
September 14, 1937 - 288.
Gardner-Denver machinery
September 14, 1937 - 289.
Cut Road
September 14, 1937 - 290.
Tunnel Excavation
September 14, 1937 - 291.
Deep Rock Cut North
September 14, 1937 - 292.
Bucyrus Erie shovel
September 14, 1937 - 293.
Gasoline Truck
September 14, 1937 - 294.
Retaining Wall
September 14, 1937 - 295.
Cut Road
September 14, 1937 - 296.
Air Bellows Gap Underpass
September 21, 1937 - 297.
West wingwall Air Bellows Gap Underpass
September 23, 1937 - 298.
Fireplace in shelter on top of Cumberland Knob
October 1937 - 299.
View of viaduct under construction
October 4, 1937 - 300.
View of viaduct under construction
October 4, 1937 - 301.
View of viaduct under construction
October 4, 1937 - 302.
Takeoff to campground area before construction
October 8, 1937 - 303.
Saddle in campground area looking west before construction
October 8, 1937 - 304.
Rough Grade Road
October 10, 1937 - 305.
Road and Bridge with Guard Stakes
October 10, 1937 - 306.
Cement stone gutter
October 10, 1937 - 307.
Road through Cut
October 10, 1937 - 308.
Rock Embankment
October 11, 1937 - 309.
Mabry Mill
October 11, 1937 - 310.
Winding Road
October 11, 1937 - 311.
Paving Gutters
October 11, 1937 - 312.
Stone culvert head wall
October 11, 1937 - 313.
Surfaced Road
October 11, 1937 - 314.
Gutter Construction
October 11, 1937 - 315.
View of road
October 11, 1937 - 316.
Water wheel on Mabry Mill
October 11, 1937 - 317.
Parkway alignment
October 11, 1937 - 318.
Water Channel
October 11, 1937 - 319.
Rock cut back of parking overlook
October 11, 1937 - 320.
Stone Hillside Work
October 11, 1937 - 321.
Parkway and Mabry Mill
October 11, 1937 - 322.
Stone Gutter
October 11, 1937 - 323.
Access Road to Route 18
October 11, 1937 - 324.
View of road
October 11, 1937 - 325.
Dirt Road
October 11, 1937 - 326.
Automobile on road
October 11, 1937 - 327.
Early Construction
October 11, 1937 - 328.
Team of Horses
October 12, 1937 - 329.
Dressed Road
October 12, 1937 - 330.
Dead chestnut in second growth. Cleanup and thinning badly needed
October 12, 1937 - 331.
Man and a Horse Team
October 12, 1937 - 332.
Unfinished Construction
October 12, 1937 - 333.
View of road
October 12, 1937 - 334.
Viaduct under construction
October 13, 1937 - 335.
Parkway just north of Air Bellows Gap
October 13, 1937 - 336.
Looking across Bluff Park toward Little Grandfather Mountain
October 13, 1937 - 337.
Bull Head Mountain and Parkway
October 13, 1937 - 338.
Rock Cut - Devil's Garden
October 13, 1937 - 339.
Looking through rock cut towards Ice Rock and Bluff
October 13, 1937 - 340.
Parkway in Late Afternoon
October 14, 1937 - 341.
Parkway overlook and view therefrom
October 14, 1937 - 342.
Drop inlet set back of gutter
October 14, 1937 - 343.
Mountain home site
October 14, 1937 - 344.
General view of parkway overlook
October 14, 1937 - 345.
Parkway--good example flat slopes and gutter
October 14, 1937 - 346.
Parkway overlook and Nigger Mt (Mt Jefferson)
October 14, 1937 - 347.
Parkway in late afternoon
October 14, 1937 - 348.
Parkway--good example flat slopes and gutter
October 14, 1937 - 349.
Looking off toward Obida
October 14, 1937 - 350.
Parking overlook and foreground
October 14, 1937 - 351.
Mountain home site near parkway
October 14, 1937 - 352.
General view of parkway
October 14, 1937 - 353.
Inside of a Tunnel
October 15, 1937 - 354.
Alligator Back and Meadow Fork Valley
October 15, 1937 - 355.
Alligator Back and Meadow Fork Valley
October 15, 1937 - 356.
Indians Not To Vote On Scenic Parkway Plan (Page 2 of 2)
October 15, 1937 - 357.
Parkway and Meadow Fork Valley from Bluff
October 15, 1937 - 358.
Parkway alignment, Meadow Fork Valley
October 15, 1937 - 359.
Back side of shelter
October 15, 1937 - 360.
Before clean-up. Fine trees obscured by dead and poor trees and scrub growth.
October 15, 1937 - 361.
Looking back at Alligator Back
October 15, 1937 - 362.
Retaining Wall
October 15, 1937 - 363.
Men Grading Slope
October 15, 1937 - 364.
Tunnel #2
October 15, 1937 - 365.
Indians Not To Vote On Scenic Parkway Plan (Page 1 of 2)
October 15, 1937 - 366.
Alligator Back
October 15, 1937 - 367.
On top of Bluff. Parkway and Little Grandfather Mt.
October 15, 1937 - 368.
Parkway approaching Meadow Fork Valley
October 15, 1937 - 369.
Partially Worked Gradient
October 15, 1937 - 370.
Tunnel entrance and culvert headwall
October 15, 1937 - 371.
Construction - Crusher
October 21, 1937 - 372.
Ice formations
November 1937 - 373.
Parking Overlook
November 1937 - 374.
Ice formations
November 1937 - 375.
Ice Formations
November 1937 - 376.
Ice Formations
November 1937 - 377.
Ice Formations
November 1937 - 378.
Ice Formations
November 1937 - 379.
Ice formations
November 1937 - 380.
Road to Lodge (under construction)
November 1937 - 381.
Road to Lodge (under construction)
November 1937 - 382.
Early Construction
November 5, 1937 - 383.
Letter from J. P. Dodge to Francis O. Clarkson
November 16, 1937 - 384.
Letter from Francis O. Clarkson to J. P. Dodge
November 18, 1937 - 385.
Ice Rock
November 20, 1937 - 386.
Surfaced Road
November 20, 1937 - 387.
Parkway toward the Bluff
November 20, 1937 - 388.
Roadway near Ice Rock
November 20, 1937 - 389.
Ice Rock
November 20, 1937 - 390.
Ice Rock
November 20, 1937 - 391.
Icy Road
November 20, 1937 - 392.
Ice Rock Channel and Drainage
November 20, 1937 - 393.
Fill
November 20, 1937 - 394.
Typical section in snow
November 20, 1937 - 395.
Road Routes
November 22, 1937 - 396.
View of Route 104
November 24, 1937 - 397.
Inside Tunnel #2
November 24, 1937 - 398.
Mountainside
November 24, 1937 - 399.
Overcast Material
December 15, 1937 - 400.
Overcast material (distant) and fill (foreground)
December 15, 1937
Refine Your Search
Types (4)
Photographs (372) Letters (13) Newspaper Articles (13) Maps (2)Locations (85)
Section 2M (56) Section 2A (53) Section 2C (52) Milepost 242 (17) Laurel Fork Viaduct (16) Little Switzerland (13) Milepost 225 (12) Milepost 266 (10) Section 2P (10) Lake Tahoma (7) See All ResultsSections (20)
2A (93) 2C (90) 2M (58) 2E (41) 2D (31) 2L (21) 2B (13) 2P (11) 1R (8) 2J (5) See All ResultsCounties (15)
Alleghany (199) Yancey (56) Wilkes (34) Ashe (33) Mitchell (14) Buncombe (11) Floyd (11) McDowell (9) Avery (7) Watauga (7) See All Results



