Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Regional Sketch Map
1935 - 2.
First Grading Contract
September 1935 - 3.
Face of Sample Wall, Showing Raked Joints and Over 'Dressed Stone,' Giving a Hard, Formal Appearance
November 12, 1935 - 4.
Top soil stripping operations
November 26, 1935 - 5.
Retaining wall, class B masonry
February 15, 1936 - 6.
Retaining wall class B masonry See #5951
February 15, 1936 - 7.
Road construction
April 27, 1936 - 8.
Parkway Road
May 23, 1936 - 9.
Masonry Wall
May 23, 1936 - 10.
Parkway Road
May 23, 1936 - 11.
Culvert at Station 517
June 23, 1936 - 12.
Early Road Cut in Section 2A
June 23, 1936 - 13.
Channel Change at Bridge Site #10 (Section 2A)
June 23, 1936 - 14.
Bridge #6 During Construction (Section 2A)
June 23, 1936 - 15.
Unique Culvert Near Station 262
June 23, 1936 - 16.
Pre-Asphalt Road in Section 2A
June 23, 1936 - 17.
Coarse Stone Road in Section 2A
June 23, 1936 - 18.
Cement Masonry
June 30, 1936 - 19.
Baffles
June 30, 1936 - 20.
Early Construction
July 22, 1936 - 21.
"Bridge 3" Construction in Section 2A
July 22, 1936 - 22.
Pre-Asphalt Parkway Near Virginia Border
July 22, 1936 - 23.
View of Machined-Flattened Parkway
July 22, 1936 - 24.
Bridge Construction in Section 2A
July 22, 1936 - 25.
Side view Bridge Construction in Section 2A
July 22, 1936 - 26.
Bridge Construction Site in Section 2A
July 22, 1936 - 27.
#9 Bridge
July 23, 1936 - 28.
Under Drain
July 23, 1936 - 29.
Wright Property, View Showing Small Pine Trees Cut by the Owner
August 1936 - 30.
Wright property. View showing small pine trees cut by the owner
August 1936 - 31.
View showing small pine trees cut by the owner, Wright property
August 1936 - 32.
Road View
August 22, 1936 - 33.
Bridge Construction
August 22, 1936 - 34.
Curved Head Wall
August 22, 1936 - 35.
Bridge Construction
August 22, 1936 - 36.
Bridge and Abutment Construction
August 22, 1936 - 37.
Retaining Wall
August 22, 1936 - 38.
Bridge and Abutment Construction
August 22, 1936 - 39.
Bridge and Abutment Construction
August 22, 1936 - 40.
Bridge and Abutment Construction
August 22, 1936 - 41.
Bridge and Abutment Construction
August 22, 1936 - 42.
Bridge and Abutment Construction
August 22, 1936 - 43.
Road View
August 22, 1936 - 44.
View of Parkway
August 22, 1936 - 45.
Stone masonry wall
August 23, 1936 - 46.
Bridge 10, site of construction
August 25, 1936 - 47.
Stone detail
August 26, 1936 - 48.
Close-up of plant group left of parkway
August 27, 1936 - 49.
Top of #4 Bridge
October 5, 1936 - 50.
Top of #4 Bridge
October 5, 1936 - 51.
Cement Pouring at Bridge #10
October 5, 1936 - 52.
Stone Cement Gutter Construction
October 5, 1936 - 53.
View of Bridge 4 Abutment
October 5, 1936 - 54.
#4 Bridge Construction
October 5, 1936 - 55.
Construction on Bridge #8
October 5, 1936 - 56.
Floor and Side Forms of Bridge #8
October 5, 1936 - 57.
Left Wing of Bridge #4
October 5, 1936 - 58.
Construction at Bridge #4
October 5, 1936 - 59.
#3 Bridge Construction
October 5, 1936 - 60.
Wood and Stone Bridge
October 5, 1936 - 61.
Stone Cement Gutter
October 5, 1936 - 62.
View looking south along parkway
October 13, 1936 - 63.
General view of road and gutter
October 13, 1936 - 64.
300 feet from beginning of the section, view looking north along parkway
October 21, 1936 - 65.
Near Saddle Mountain church. View of right side of two-arch culvert.
October 22, 1936 - 66.
Drop Inlet Station 29
October 28, 1936 - 67.
Partly Completed Parking
October 28, 1936 - 68.
Right Head Wall 289
October 28, 1936 - 69.
Cut Ditch and Bank
October 28, 1936 - 70.
Work on Culvert
October 28, 1936 - 71.
Work Across Intersection from 39-20
October 28, 1936 - 72.
Dressed Slopes and Road Intersection
October 29, 1936 - 73.
Bridge #9 Abutment
October 29, 1936 - 74.
Bridge #6 Construction
October 29, 1936 - 75.
General view showing machinery making fill through low wet area
November 25, 1936 - 76.
Roadway
December 1, 1936 - 77.
Bridge Construction
December 1, 1936 - 78.
Arch of Bridge
December 1, 1936 - 79.
Parking Overlook
December 1, 1936 - 80.
Pine Creek Bridge #4
December 1, 1936 - 81.
Bridge Construction
December 1, 1936 - 82.
Bridge Construction
December 1, 1936 - 83.
Rounded Roadway
December 1, 1936 - 84.
Bridge Construction
December 1, 1936 - 85.
Bridge Frame
December 1, 1936 - 86.
Bridge Construction
December 1, 1936 - 87.
Early construction
February 2, 1937 - 88.
Cumberland Knob Parking
February 2, 1937 - 89.
Men cleaning gutter
February 2, 1937 - 90.
Car on Road
February 2, 1937 - 91.
Winding Road
February 2, 1937 - 92.
Intersection Corner
February 2, 1937 - 93.
Finished Slopes
February 2, 1937 - 94.
Cumberland Knob Drive
February 2, 1937 - 95.
Route 18 Crossing
February 2, 1937 - 96.
Curved Road
February 2, 1937 - 97.
Route 18 Intersection
February 2, 1937 - 98.
Bridge Arch
February 3, 1937 - 99.
Rock embankment and culvert
February 4, 1937 - 100.
Construction materials
February 4, 1937 - 101.
Bridge #9 construction
February 4, 1937 - 102.
Bridge Abutment
February 4, 1937 - 103.
Bridge #8
February 4, 1937 - 104.
Bridge Construction
February 4, 1937 - 105.
Rock embankment and stream
February 4, 1937 - 106.
Bridge at site #7, Steel stringers
March 29, 1937 - 107.
Underside of bridge
April 6, 1937 - 108.
Riveters working
April 6, 1937 - 109.
View of bridge
April 10, 1937 - 110.
Landscape North to Bridge #6
April 10, 1937 - 111.
View of bridge #4
April 10, 1937 - 112.
View of road
April 10, 1937 - 113.
View of road
April 10, 1937 - 114.
Bridge #6
April 10, 1937 - 115.
Detail Pier #2
April 10, 1937 - 116.
Detail of expansion dam
April 10, 1937 - 117.
Rail construction
April 10, 1937 - 118.
Rail details
April 10, 1937 - 119.
Unfinished road and bridge
April 10, 1937 - 120.
Left End of Bridge #9
April 12, 1937 - 121.
Bridge #10 and Stream
April 12, 1937 - 122.
Bridge Rock Detail
April 12, 1937 - 123.
Bridge #8
April 12, 1937 - 124.
Bridge no. 9, cost $20,120 24' span
May 18, 1937 - 125.
Cars crossing Pine Creek Bridge #7
May 25, 1937 - 126.
Bridge #10
May 25, 1937 - 127.
Pine Creek Bridge #6
May 25, 1937 - 128.
Pine Creek Bridge #3
May 25, 1937 - 129.
Pine Creek Bridge #5
May 25, 1937 - 130.
Pine Creek Bridge #7
May 25, 1937 - 131.
Completed Bridge #8
May 25, 1937 - 132.
Bridge #2
May 25, 1937 - 133.
Arch of Bridge #9
May 25, 1937 - 134.
Bridge #9
May 25, 1937 - 135.
Saddle Mountain Valley, Lake Site from station 277
August 20, 1937 - 136.
Road through Cut
October 10, 1937 - 137.
Road and Bridge with Guard Stakes
October 10, 1937 - 138.
Rough Grade Road
October 10, 1937 - 139.
Cement stone gutter
October 10, 1937 - 140.
Land Acquisition Maps Section 2-A
1938 - 141.
Cumberland Knob Slope flattening at entrance
January 24, 1938 - 142.
Signs near parking area
July 1, 1938 - 143.
Before grading. Steep, rotten rock cuts, shoulder and ditch. 2 ft short
July 25, 1938 - 144.
Before grading. Tape used to show concave slope. Needs transition, overhand and wide rounding
July 25, 1938 - 145.
Before grading. A 3/4 to 1 slope with almost vertical overhang of soft rock
July 25, 1938 - 146.
Before grading. Cleared to connect slope line, with rock as excuse for steep slope. Ugly profile.
July 25, 1938 - 147.
Washout at headwall. Shows need of different type of structure.
August 1, 1938 - 148.
Before grading
December 1938 - 149.
Hand Rail
January 1, 1939 - 150.
View of road
September 6, 1939 - 151.
After L.D. Grading
October 26, 1939 - 152.
Bridge and Car
1940s - 153.
Broken Pavement Sign
March 15, 1940 - 154.
Cattle belonging to Mrs. C.H. Wright committing trespass
March 17, 1940 - 155.
Cumberland Knob Guard Wall
November 18, 1940 - 156.
Operator's Sign
July 10, 1942
Items in Query
Ending Year [Remove]
Starting Year [Remove]
Show All Results [Remove]
Location [Remove]
Results: 156
Refine Your Search
Types (2)
Photographs (154) Maps (2)Locations (1)
Section 2A (156)Sections (1)
2A (156)Counties (1)
Alleghany (156)



