Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Hillside
1930s
-
View of road
1930s
-
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935
-
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936
Page 1 of 1.
Items in Query
Results: 4
Refine Your Search
Types (1)
Photographs (4)Locations (3)
Section 2A (2) Milepost 225 (1) Milepost 229 (1)Sections (1)
2A (4)Counties (1)
Alleghany (4)