Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Stripped area and top soil storage pile
November 26, 1935 - 2.
General view construction through low area
November 26, 1935 - 3.
Rock filled tiled drain left of center line
November 26, 1935 - 4.
General view of construction rough grading
November 26, 1935 - 5.
Box culvert 8' x 6', 15° skew
November 26, 1935 - 6.
Box culvert, 8' x 6', 15° skew
November 26, 1935
Refine Your Search
Types (1)
Photographs (6)Locations (1)
Milepost 221 (6)Sections (1)
2A (6)Counties (1)
Alleghany (6)



