Special headwall 10' x 7' R.C. box
May 25, 1935
-
Special Headwall, 10' x 7' R.C. Box
May 25, 1935
-
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935
-
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935
-
First Grading Contract
September 1935
-
First Grading Contract
September 1935
-
Top soil stripping operations
November 26, 1935
-
Heavy Machinery and Construction
May 23, 1936
-
Bridge Construction
May 23, 1936
-
Log Cribbing and Check Dams for Erosion Control
May 25, 1936