Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Blue Ridge Parkway near the Virginia - North Carolina Line
20th Century - 2.
Glade Valley
20th Century - 3.
Low Gap, NC
20th Century - 4.
Fisher's Peak from Cumberland Knob
20th Century - 5.
Low Gap, NC
20th Century - 6.
Bridge
September 18, year unknown - 7.
Sign for Roaring Gap, N.C.
20th Century - 8.
Fox Hunter's Paradise
20th Century - 9.
Storage Compound Bldg #164
20th Century - 10.
Cumberland Knob from Norvalle Crags
20th Century - 11.
End of Section A
1930s - 12.
View of road
1930s - 13.
Stream
1930s - 14.
Farmland and road
1930s - 15.
View of road
1930s - 16.
Hare Mill Pond with hillside and buildings
1930s - 17.
School Near Head of Glade Creek
1930s - 18.
View of road and gutter
1930s - 19.
Cliff along roadside
1930s - 20.
Station 566
1930s - 21.
#10 Bridge over Little Glade Creek
1930s - 22.
Before seeding and planting
1930s - 23.
View of road
1930s - 24.
View of road
1930s - 25.
View of road
1930s - 26.
Log Cabin
1930s - 27.
Stone Masons
1935 - 28.
Devils Garden Showing Steep Rocky Slopes
May 31, 1935 - 29.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 30.
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935 - 31.
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 - 32.
First Gradeing Contract
September 1935 - 33.
First Grading Contract
September 1935 - 34.
First Grading Contract
September 1935 - 35.
First Gradeing Contract
September 1935 - 36.
New New River Bridge, Detail of Chimney of Old House
September 17, 1935 - 37.
Stone work of Graystone Inn
September 18, 1935 - 38.
Early Construction
November 1, 1935 - 39.
Face of Sample Wall, Showing Raked Joints and Over 'Dressed Stone,' Giving a Hard, Formal Appearance
November 12, 1935 - 40.
Back of sample wall, showing same stone laid in a more informal treatment, etc
November 13, 1935 - 41.
Box culvert, 8' x 6', 15° skew
November 26, 1935 - 42.
General view construction through low area
November 26, 1935 - 43.
Box culvert 8' x 6', 15° skew
November 26, 1935 - 44.
Stripped area and top soil storage pile
November 26, 1935 - 45.
Rock filled tiled drain left of center line
November 26, 1935 - 46.
General view of construction rough grading
November 26, 1935 - 47.
Retaining wall, Class B, masonry. See neg# 5951
February 15, 1936 - 48.
Stone work detail Class B masonry retaining wall See neg# 5951
February 15, 1936 - 49.
Type #1 Headwall, Single
April 16, 1936 - 50.
General ground conditions, showing erosion
April 16, 1936 - 51.
Type #1 headwall, single
April 16, 1936 - 52.
Arch + cut stone - double box culvert
April 16, 1936 - 53.
Arch-cut Stone, Double Box Culvert
April 16, 1936 - 54.
General Ground Conditions Showing Stream Conditions
April 16, 1936 - 55.
Picnic area before clearing operations
April 21, 1936 - 56.
Road construction
April 27, 1936 - 57.
Cumberland Knob Picnic Area
April 28, 1936 - 58.
Cumberland Knob Picnic Area
April 28, 1936 - 59.
Bridge Tunnel
May 15, 1936 - 60.
Bridge Tunnel
May 23, 1936 - 61.
Parkway Road
May 23, 1936 - 62.
Bridge Tunnel
May 23, 1936 - 63.
Bridge Construction
May 23, 1936 - 64.
Heavy Machinery and Construction
May 23, 1936 - 65.
Parkway Road
May 23, 1936 - 66.
Parkway Road
May 23, 1936 - 67.
Cribbing check dams with brush back-fill
May 25, 1936 - 68.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 69.
Log Cribbing and Check Dams for Erosion Control
May 26, 1936 - 70.
Log cribbing and check dams for erosion control
May 26, 1936 - 71.
Switchback on trail from Cumberland Knob, picnic area to gulley. Creek showing ramps.
May 30, 1936 - 72.
Open grassy area on Knob, looking west
May 30, 1936 - 73.
Clearing below Knob, Looking toward Spur
May 30, 1936 - 74.
Completed Trail, Indian Grave Trail
June 15, 1936 - 75.
Trail Route, Before Construction "Indian Grave Trail"
June 15, 1936 - 76.
Completed Cribbing "Spur Trail"
June 15, 1936 - 77.
Cribbing of trail, almost complete "Spur Trail"
June 15, 1936 - 78.
Completed Shuttle Trail, Looking Ahead
June 15, 1936 - 79.
Detailed View of Bridge Abutment
June 23, 1936 - 80.
Detail View of Bridge #1 Construction
June 23, 1936 - 81.
Pre-Asphalt Road in Section 2A
June 23, 1936 - 82.
Coarse Stone Road in Section 2A
June 23, 1936 - 83.
Bridge Site #10 Prior to Construction
June 23, 1936 - 84.
Detail View of Bridge Site #6
June 23, 1936 - 85.
Early Road Cut in Section 2A
June 23, 1936 - 86.
Cement Masonry
June 30, 1936 - 87.
Right Hand Beam
July 13, 1936 - 88.
Section of Trail Under Construction - Gully Creek
July 14, 1936 - 89.
Bridge #1 left-handed beam
July 14, 1936 - 90.
A Step Detail in Indian Grave Trail
July 14, 1936 - 91.
4th switch and rest bench site
July 14, 1936 - 92.
Early Construction of Bridge in Section 2A
July 22, 1936 - 93.
Vehicle Tracks
July 22, 1936 - 94.
Early Construction
July 22, 1936 - 95.
View of Machined-Flattened Parkway
July 22, 1936 - 96.
First Parkway Crossing of NC 18, Near Sparta, NC
July 22, 1936 - 97.
Partially Completed Overlook
July 22, 1936 - 98.
River/Trench
July 22, 1936 - 99.
Early Construction
July 23, 1936 - 100.
Line Guides
July 23, 1936 - 101.
Bridge site #1 east side looking north
July 23, 1936 - 102.
Valley
July 23, 1936 - 103.
Shovel loading
July 23, 1936 - 104.
Path North over Proposed Bridge
July 23, 1936 - 105.
Cement Rock Wall
July 23, 1936 - 106.
Culvert Head Wall
July 23, 1936 - 107.
Unpaved Road #1
July 23, 1936 - 108.
Wall 611
July 23, 1936 - 109.
Under Drain
July 23, 1936 - 110.
Bridge site east side looking south
July 23, 1936 - 111.
Fern Covered Rock along Trail
August 1936 - 112.
View from Top Looking Direction of Fishers Peak
August 1936 - 113.
Bench along trail at a point 100 yards from picnic area.
August 1936 - 114.
Cumberland Knob Park Trail
August 1936 - 115.
View from Highest Point in Cumberland Knob
August 1936 - 116.
Small waterfall, Camera placed at intersection of trail and stream
August 1936 - 117.
Cumberland Knob waterfall
August 1936 - 118.
Waterfall Cumberland Knob
August 1936 - 119.
View showing small pine trees cut by the owner, Wright property
August 1936 - 120.
Fungus Growth Along Trail
August 1936 - 121.
Wright Property, View Showing Small Pine Trees Cut by the Owner
August 1936 - 122.
View looking south along parkway
August 1936 - 123.
Bridge site #6 Southwest wing wall
August 3, 1936 - 124.
Bridge Site #6, Southwest Wing Wall, Pine Creek Bridge No. 6
August 4, 1936 - 125.
Bridge #6 Northwest wing wall
August 4, 1936 - 126.
Hand-placed rock wall
August 20, 1936 - 127.
Hare Mill Pond, scenic view
August 22, 1936 - 128.
Early Construction
August 22, 1936 - 129.
Bridge Construction
August 22, 1936 - 130.
Bridge and Abutment Construction
August 22, 1936 - 131.
Bridge and Abutment Construction
August 22, 1936 - 132.
Bridge and Abutment Construction
August 22, 1936 - 133.
Ahead at site of excavation for bridge #4.
August 22, 1936 - 134.
Bridge and Abutment Construction
August 22, 1936 - 135.
Bridge and Abutment
August 22, 1936 - 136.
Retaining Wall
August 22, 1936 - 137.
Bridge and Abutment Construction
August 22, 1936 - 138.
Hare Mill Pond, scenic view
August 22, 1936 - 139.
Bridge 4, excavation site
August 22, 1936 - 140.
Bridge 10, site of construction
August 23, 1936 - 141.
Excavation for tree well
August 23, 1936 - 142.
Stone masonry wall
August 23, 1936 - 143.
Rock wall on side of road
August 23, 1936 - 144.
Bridge 10, site of construction
August 23, 1936 - 145.
After stream improvement
August 26, 1936 - 146.
Plant group left of parkway
August 27, 1936 - 147.
Plant group left of parkway
August 27, 1936 - 148.
View of Trail Leading to Cumberland Knob from the Parking Area
August 31, 1936 - 149.
Cabin within 100' right-of-way, looking north
September 1936 - 150.
Bridge Site #6, Southwest Wing Wall Under Construction
September 4, 1936 - 151.
Bridge site #6 Southeast wing wall under construction
September 4, 1936 - 152.
View looking south along parkway
September 8, 1936 - 153.
View of Fishers Peak from Trail
September 8, 1936 - 154.
View from Highest Point Looking Northeast
September 8, 1936 - 155.
View of parkway, looking north through wooded area. One of the few places where trees meet overhead.
September 9, 1936 - 156.
Brush Creek Bridge #8, Pier from south
September 16, 1936 - 157.
Brush Creek Bridge #8 Pier
September 16, 1936 - 158.
Bridge #8 Pier
September 16, 1936 - 159.
A view from the hillside opposite of the entrance to Cumberland Knob Park, looking across the Parkway to the park area
October 1936 - 160.
Construction on Bridge #8
October 5, 1936 - 161.
Cement Pouring at Bridge #10
October 5, 1936 - 162.
Stone Cement Gutter
October 5, 1936 - 163.
Looking north along parkway showing rock outcropping
October 11, 1936 - 164.
View looking south from wooded area into open meadow area.
October 12, 1936 - 165.
View across parkway looking east into escarpment one-half mile south of Cumberland Knob
October 12, 1936 - 166.
Parkway alignment, looking north
October 12, 1936 - 167.
View looking north along parkway
October 12, 1936 - 168.
Crushed stone base for rubble gutter
October 13, 1936 - 169.
Road alignment through wooded section
October 13, 1936 - 170.
View looking south along Parkway (Proposed cabin-gas road entrance at far end of cut on left).
October 13, 1936 - 171.
Detail of rubble gutter - completed
October 13, 1936 - 172.
Gutter termination at pipe headwall
October 13, 1936 - 173.
Rubble gutter completed
October 13, 1936 - 174.
View of culvert
October 13, 1936 - 175.
View looking north toward Pine Spur
October 13, 1936 - 176.
View looking south along parkway
October 13, 1936 - 177.
Looking North Along Parkway
October 14, 1936 - 178.
View looking north along Parkway
October 14, 1936 - 179.
Picnic Table
October 21, 1936 - 180.
Picnic table
October 21, 1936 - 181.
Bridge #1 View of left side (looking south). Looking down stream
October 22, 1936 - 182.
View of left side, looking south, showing detail of stone work
October 22, 1936 - 183.
Bridge #4 Detail of stone work; view of left side
October 22, 1936 - 184.
Brush Creek Bridge #8
November 19, 1936 - 185.
View looking across parkway from east side of bridge
November 19, 1936 - 186.
Station 258, Sec 2B Rock fill adjacent to hand-laid rock embankment
November 19, 1936 - 187.
Bridge #6 Bridge from east side.
November 19, 1936 - 188.
Bridge Construction
December 1, 1936 - 189.
Rounded Roadway
December 1, 1936 - 190.
Parking Overlook
December 1, 1936 - 191.
Pine Creek Bridge #4
December 1, 1936 - 192.
Bridge No. 4
December 2, 1936 - 193.
Station 386 Bridge #4
December 12, 1936 - 194.
Building - razed
January 12, 1937 - 195.
Men cleaning gutter
February 2, 1937 - 196.
Unsurfaced Road
February 2, 1937 - 197.
Completed Road
February 2, 1937 - 198.
Drain Wall
February 2, 1937 - 199.
Finished Slopes
February 2, 1937 - 200.
Bridge #8
February 4, 1937 - 201.
Bridge Construction
February 4, 1937 - 202.
Bridge #9 construction
February 4, 1937 - 203.
Bridge at Site #7, Steel Construction
March 29, 1937 - 204.
Bridge at site #7 Steel construction, looking back from south abutment
March 29, 1937 - 205.
Detail Pier #2
April 10, 1937 - 206.
Bridge Construction
April 10, 1937 - 207.
Detail of expansion dam
April 10, 1937 - 208.
Left End of Bridge #9
April 12, 1937 - 209.
Bridge #10 and Stream
April 12, 1937 - 210.
No. 5 Bridge, Cost $17,520, Pine Creek Bridge #5
May 4, 1937 - 211.
Station 563 No 8 Bridge cost $34,053
May 4, 1937 - 212.
No.6 bridge, cost $15,139
May 4, 1937 - 213.
No.4 Arch Bridge, cost $12,000
May 4, 1937 - 214.
Looking back over bridge #5
May 4, 1937 - 215.
#9 Bridge, Down Stream, Cost $20,120
May 4, 1937 - 216.
Bridge No. 3, 57' Span, Cost $19,462
May 18, 1937 - 217.
Bridge #4
May 18, 1937 - 218.
Mailbox on parkway
May 18, 1937 - 219.
Bridge #5 42' span cost $17,520
May 18, 1937 - 220.
Arch of Bridge #9
May 25, 1937 - 221.
Bridge #2
May 25, 1937 - 222.
Bridge #10
May 25, 1937 - 223.
Bridge #9
May 25, 1937 - 224.
Pine Creek Bridge #4
May 25, 1937 - 225.
Completed Bridge #8
May 25, 1937 - 226.
Old state box culvert to be removed
June 1, 1937 - 227.
Parkway box culvert
June 1, 1937 - 228.
Saddle Mountain Valley, Lake Site from station 277
August 20, 1937 - 229.
Saddle Mountain Valley. Lake site, looking up at valley, woods opposite
August 20, 1937 - 230.
Unknown variety of plant 6 - 7' high, yellow flowers in bloom
August 20, 1937 - 231.
Saddle Mountain Valley, Lake Site
August 20, 1937 - 232.
Cumberland Knob Shelter Bldg #89
September 1937 - 233.
Fireplace in shelter on top of Cumberland Knob
October 1937 - 234.
Rock Cut - Devil's Garden
October 13, 1937 - 235.
Rock cut at Devil's Garden
1938 - 236.
Shoulder construction, High Piney Ridge in background
1938 - 237.
Cumberland Park Pump House
January 5, 1938 - 238.
Devil's Garden Parking and Overlook after Grading
April 21, 1938 - 239.
Front of barn as it would be seen from the parkway.
April 21, 1938 - 240.
Shelter on Top of Cumberland Knob
April 27, 1938 - 241.
Looking West from One of the Parking Areas South of Cumberland Knob
April 27, 1938 - 242.
Water Fountain
July 1938 - 243.
West Abutment, Overpass US 21
July 12, 1938 - 244.
Before grading. Cave-in on 1:1 slope. Will continue to slide unless flattened. Needs rounding.
July 25, 1938 - 245.
Before grading. Tape used to show concave slope. Needs transition, overhand and wide rounding
July 25, 1938 - 246.
Unpaved roadway with erosion
July 25, 1938 - 247.
Washout at headwall. Shows need of different type of structure.
August 1, 1938 - 248.
Before grading
December 1938 - 249.
Before grading
December 1938 - 250.
Before grading
December 1938 - 251.
High cuts thru wooded area. During selective cutting.
December 15, 1938 - 252.
Shoulder construction, High Piney Ridge in background
1938 - 253.
Hand Rail
January 1, 1939 - 254.
#4 Arch Bridge, Masonry Detail
January 10, 1939 - 255.
Old barn on left, to be removed
January 18, 1939 - 256.
Sheds (Torn down by BLRI 2/1/39)
January 18, 1939 - 257.
Cleary, Osbourne and Richardson Property Below Cleary property
March 30, 1939 - 258.
Richardson Property between Richardson and Osborne Houses
March 30, 1939 - 259.
Osbourne and Richardson Property. West of House
March 30, 1939 - 260.
Top of Overpass US 21
May 19, 1939 - 261.
Overpass US 21
May 19, 1939 - 262.
Overpass US 21
May 19, 1939 - 263.
Overpass US 21 and Access Drive
May 19, 1939 - 264.
Stream undermining Abutment from upstream
August 1, 1939 - 265.
Undercutting Fill Slopes for Stream Relocation
August 1939 - 266.
After Planting
October 26, 1939 - 267.
After L.D. Grading
October 26, 1939 - 268.
After grading and planting
October 26, 1939 - 269.
Foundation - Equipment storage and office building CCC job 142
November 1939 - 270.
Construction of Combination Building, comfort station, picnic shelter, and refractory
1940 - 271.
View looking North on parkway
1940 - 272.
Grade Separation Structure Over US 21 Looking East
1940 - 273.
Drive in Picnic Area
1940 - 274.
Drinking Fountain
1940 - 275.
Watershed
1940 - 276.
Entrance to Park
1940 - 277.
View Looking South on Parkway
1940 - 278.
Looking East from Entrance Road
1940 - 279.
Azalea Bloom
1940 - 280.
Trail Shelter
1940 - 281.
Holiday, Cumberland Knob
1940s - 282.
Pedestrian Overlook at Fox Hunters Paradise
1940 - 283.
View looking south on Parkway Showing bridge #6
1940 - 284.
Comfort Station Cumberland Knob
1940 - 285.
Scene near Devil's Garden, Blue Ridge Parkway
1940s - 286.
Parking at Cumberland Knob
1940s - 287.
Fishers Peak from Outer Parking area at Fox Hunters Paradise
1940 - 288.
Picnic area
1940 - 289.
Parking at Cumberland Knob
1940s - 290.
View from Fox Hunters Paradise in Cumberland Knob Area
1940s - 291.
Big Piney Creek Bridge #6, Pine Creek Bridge #6
1940 - 292.
Entrance to Park showing sign and crate structure
1940 - 293.
Bridge and Car
1940s - 294.
Viaduct Bridge #7
1940 - 295.
Broken Pavement Sign
March 15, 1940 - 296.
Cattle belonging to Mrs. C.H. Wright committing trespass
March 17, 1940 - 297.
Flood Damage
August 16, 1940 - 298.
Operators Sign
July 10, 1942 - 299.
Operators Signs, Approach from N
July 10, 1942 - 300.
Operator Sign
July 10, 1942 - 301.
Operator's Sign
July 10, 1942 - 302.
Operators Signs
July 10, 1942 - 303.
Operator's Sign - Approach from S
July 10, 1942 - 304.
Operator Sign, Lunch Room, Comfort Station
July 10, 1942 - 305.
Operator's Sign Approach from S
July 10, 1942 - 306.
Operators Signs Approach from N
July 10, 1942 - 307.
Fox Hunters Paradise
September 11, 1942 - 308.
C.K. Marker Stone Cumberland Knob
September 12, 1942 - 309.
Guard Wall Construction
February 2, 1943 - 310.
Station 120, Blue Ridge Parkway
April 29, 1943 - 311.
Station 120, Blue Ridge Parkway
April 29, 1943 - 312.
Fox Hunters Paradise
1946 - 313.
Concession Bldg. at Cumberland Knob
1946 - 314.
Picnicking
June 1946 - 315.
Blue Ridge Parkway, Sec. 2-B
June 1946 - 316.
Scenic View along Parkway
June 1946 - 317.
Picnic Group, Cumberland Knob
June 1946 - 318.
Fox Hunters Paradise
June 1946 - 319.
Picnicking
June 1946 - 320.
Bridge along the Parkway
June 1946 - 321.
Blue Ridge Parkway near Sparta, N.C.
June 1946 - 322.
Scenic Views NC
June 1946 - 323.
Parkway near Devils Garden P.O.
June 1946 - 324.
Section 2A, N.C.
June 1946 - 325.
Picnicking
June 1946 - 326.
Picnic Group, Cumberland Knob
June 1946 - 327.
Cumberland Knob
June 1946 - 328.
Hare Mill Pond
October 3, 1946 - 329.
Hare Mill Pond
October 3, 1946 - 330.
Parkway motor road blocked with snow, Motorist stalled, Damage to shoulder and slope
March 1947 - 331.
Attempt of motorist to detour snowdrift
March 1947 - 332.
Removal of Car from Snowdrift by Wrecker
March 1947 - 333.
Fox Hunters Paradise
March 1947 - 334.
Fox Hunters Paradise benches at overlook
April 1947 - 335.
Fox Hunters Paradise Highway sign (close-up)
April 1947 - 336.
Fox Hunters Paradise Interpretive Sign
April 1947 - 337.
New Access Sign Location Erected May 1949
June 30, 1949 - 338.
New Access Sign Location Erected May 1949
June 30, 1949 - 339.
Visitors eating lunch in shelter
1950s - 340.
Sandwich Shop (now Visitor Center)
1950s - 341.
Fox Hunters Paradise Rail
October 1950 - 342.
Post and Timber Rail
May 1952 - 343.
Masonry on side of Parkway
May 1952 - 344.
Concrete and Wood Guardrail
May 22, 1952 - 345.
Stone guard wall
May 22, 1952 - 346.
Fox Hunter's Paradise sign
March 9, 1953 - 347.
Fox Hunter's Paradise
March 9, 1953 - 348.
Incinerator #349
October 1957 - 349.
Radio sub-station #319
October 1957 - 350.
Signs at R/W for "The Pink Pig"
May 1958 - 351.
Sign and R/W and "The Pink Pig" Cafe
May 1958 - 352.
Signs at R/W for "The Pink Pig"
May 1958 - 353.
South-east Wing Wall
November 14, 1958 - 354.
View of mulcher on Left of Pky. headed north
June 17, 1959 - 355.
Tractor, Lime, and Fertilizer Spreaders, Bk. of Rt. 21
June 19, 1959 - 356.
Soil spreader on rt. shoulder headed north
June 19, 1959 - 357.
Soil spreader, parked at storage trailer
June 19, 1959 - 358.
Shovel dozer at borrow pit on Perry Property
June 20, 1959 - 359.
Overlook Shelter, Bldg #89 Built by ERA in 1938
1960s - 360.
Clifford C. Bailey Outbuilding
August 10, 1973 - 361.
New Bridge
November 29, 1973 - 362.
Bluffs Dist. US 21
August 1974 - 363.
Bluffs Dist. US 21 South
August 1974 - 364.
Bluffs Dist. US 21, South
August 1974 - 365.
Bluffs Dist. US 21
August 1974 - 366.
Bluffs Dist. US 21
August 1974 - 367.
Clifford C. Bailey Outbuilding, Building #587
August 20, 1975 - 368.
Clifford C. Bailey Outbuilding Front View
August 22, 1975 - 369.
Clifford C. Bailey House Bldg. #586
August 22, 1975 - 370.
Clifford C. Bailey Outbuilding Rear View
August 22, 1975 - 371.
Cumberland Knob Shelter Bldg #90
August 22, 1975 - 372.
Cumberland Knob Shelter Bldg #90
August 22, 1975 - 373.
Cumberland Knob Shelter Bldg #90
August 22, 1975 - 374.
Clifford C. Bailey outbuilding rear 3/4 view
August 22, 1975 - 375.
Cumberland Knob Shelter Building #90
August 22, 1975 - 376.
Cumberland Knob Shelter Building #90
August 22, 1975 - 377.
Clifford C. Bailey Outhouse Bldg. #621
August 22, 1975 - 378.
Equipment storage and office bldg. Bldg #94
February 1976 - 379.
Gas and oil house, building #93
February 1976 - 380.
Equipment storage and office bldg. Bldg #94
February 1976 - 381.
Equipment storage and office bldg. Bldg #94
February 1976 - 382.
Signs Picnic Area
1977 - 383.
Scenery
1977 - 384.
Scenery
1977 - 385.
Clifford C. Bailey Garage and Storage Structure #587
April 1977 - 386.
Entrance to campground
Summer 1977 - 387.
Campground
Summer 1977 - 388.
Direction and Accommodation Sign
February 7, 1957 - 389.
Brush Creek Bridge
Refine Your Search
Types (1)
Photographs (387)Locations (25)
Section 2A (71) Cumberland Knob (65) Milepost 229 (31) Milepost 217 (30) Milepost 224 (27) Milepost 225 (20) Milepost 221 (17) Milepost 227 (15) Milepost 228 (15) Cumberland Knob Park (14) See All ResultsSections (1)
2A (387)Counties (2)
Alleghany (373) Surry (14)



