Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Hillside
1930s - 2.
View of road
1930s - 3.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 4.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936
Refine Your Search
Types (1)
Photographs (4)Locations (3)
Section 2A (2) Milepost 225 (1) Milepost 229 (1)Sections (1)
2A (4)Counties (1)
Alleghany (4)



