Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Crabtree Falls Nature Walk
20th Century - 2.
Crabtree Falls
20th Century - 3.
Shufford Cabin Bldg. #616
1930s - 4.
Shufford Log Barn, Bldg. #596
1930s - 5.
Tunnel
1930s - 6.
Post construction forces scaling tunnel
1930s - 7.
General view from southeast
August 17, 1935 - 8.
Buck Creek Falls
August 17, 1935 - 9.
Looking over mountain toward Table Rock
August 21, 1935 - 10.
Black Mountain Range
August 21, 1935 - 11.
Road construction
July 8, 1936 - 12.
NC #104 Relocation, Sec 2M Parkway Access Drive
July 25, 1936 - 13.
Super Reliance Grader "Caterpillar"
August 14, 1936 - 14.
Toe Ditch
August 14, 1936 - 15.
Road Construction
August 14, 1936 - 16.
Machinery and Hillside
August 14, 1936 - 17.
East along 104 NC Station 415
August 14, 1936 - 18.
Road View
August 14, 1936 - 19.
Road Construction
August 14, 1936 - 20.
Road View
August 14, 1936 - 21.
Road View
August 14, 1936 - 22.
Road Construction
August 14, 1936 - 23.
Road Construction
August 14, 1936 - 24.
Tunnel Construction
August 14, 1936 - 25.
Road Construction
August 14, 1936 - 26.
Linn Truck
August 17, 1936 - 27.
Proposed Road Construction Site
August 17, 1936 - 28.
Pipeline
August 17, 1936 - 29.
Toe Ditch
August 17, 1936 - 30.
Toe Ditch
August 17, 1936 - 31.
View of Mountains
August 17, 1936 - 32.
Construction Equipment
August 17, 1936 - 33.
Koehring "Dumptor"
August 17, 1936 - 34.
View of Parkway
August 17, 1936 - 35.
Road construction
August 24, 1936 - 36.
Road construction
August 24, 1936 - 37.
Road construction
September 24, 1936 - 38.
Mountain Slope Road
September 25, 1936 - 39.
Rock Wall
September 25, 1936 - 40.
Road Grade and Chestnut Tree
September 25, 1936 - 41.
Part Road Grade
September 25, 1936 - 42.
Rock face and Side Slope
September 25, 1936 - 43.
Road grading
September 25, 1936 - 44.
Proposed Tunnel 1 End
September 25, 1936 - 45.
Near Entrance Tunnel #1
September 25, 1936 - 46.
Bulldozers and Construction
September 25, 1936 - 47.
Narrow Mountain Road
September 25, 1936 - 48.
Cleared Roadway
September 25, 1936 - 49.
Sample Wall
November 6, 1936 - 50.
Retaining Wall Construction
November 6, 1936 - 51.
Mountain Slope
November 6, 1936 - 52.
Excavation for Masonry Wall
November 6, 1936 - 53.
Mountain Slope
November 6, 1936 - 54.
Steep Mountain Slope
November 6, 1936 - 55.
Road on Cliffside
November 9, 1936 - 56.
Cemented Rock Wall
November 9, 1936 - 57.
Road Through Rock
November 9, 1936 - 58.
Road Construction
November 9, 1936 - 59.
Blacksmith Shop
November 9, 1936 - 60.
North Tunnel Portal
December 14, 1936 - 61.
Tunnel Entrance
December 14, 1936 - 62.
Through Rough Rock
December 14, 1936 - 63.
South Tunnel Entrance
December 14, 1936 - 64.
Proposed Line
December 14, 1936 - 65.
Shovel and Tractor
December 15, 1936 - 66.
Trail
December 15, 1936 - 67.
Cleared Path
December 15, 1936 - 68.
Rough Road
December 15, 1936 - 69.
Wagon Drill
December 15, 1936 - 70.
Excavation Cut
December 15, 1936 - 71.
Construction Slope
December 15, 1936 - 72.
Road and tunnel
February 8, 1937 - 73.
Road and rock pile
February 8, 1937 - 74.
View of road
February 8, 1937 - 75.
View of road
February 8, 1937 - 76.
Early construction
February 8, 1937 - 77.
Rock cut and tunnel
February 8, 1937 - 78.
Retaining Wall
February 8, 1937 - 79.
Cleared ridge
February 10, 1937 - 80.
Retaining Wall
February 10, 1937 - 81.
Cement stone wall
February 10, 1937 - 82.
Ahead along line
February 10, 1937 - 83.
Construction on Cement Retaining Wall
April 22, 1937 - 84.
Completed Cement Retaining Wall
April 22, 1937 - 85.
Looking North Through Tunnel #2
April 22, 1937 - 86.
Masonry Wall Building
April 22, 1937 - 87.
Retaining Wall Looking North
April 22, 1937 - 88.
Construction of Tunnel #2
April 22, 1937 - 89.
View of Road Above Tunnel #2
April 22, 1937 - 90.
Tunnel Construction
April 22, 1937 - 91.
Drill Operation
April 22, 1937 - 92.
Portal To Tunnel #1
April 22, 1937 - 93.
Construction of Tunnel #2
April 22, 1937 - 94.
Looking Through Tunnel #1
April 22, 1937 - 95.
North Through Tunnel #1
April 22, 1937 - 96.
Loading Rock at Retaining Wall
April 22, 1937 - 97.
Linn Tractor dumping
April 23, 1937 - 98.
wagon drilling
April 23, 1937 - 99.
Rough grade cut
April 23, 1937 - 100.
Rock shot
April 23, 1937 - 101.
View of Rock Cut
April 23, 1937 - 102.
Center line on Tunnel #1
April 27, 1937 - 103.
Facing North from Masonry Wall
May 29, 1937 - 104.
Top View of Masonry Wall
May 29, 1937 - 105.
Detail of surrounding rocks
May 29, 1937 - 106.
South End of Tunnel 2
August 4, 1937 - 107.
South End of Tunnel 1
August 4, 1937 - 108.
North Entrance of Tunnel 1
August 4, 1937 - 109.
North Along Rough Grade at 581-50
August 5, 1937 - 110.
Rock Slide at 576
August 5, 1937 - 111.
Quarry Operation for Masonry Material
August 5, 1937 - 112.
Right of "North Along Rough Grade at 581-50"
August 5, 1937 - 113.
Partially Built Retaining Wall at 537
August 5, 1937 - 114.
South Entrance Tunnel #1
September 9, 1937 - 115.
Hoist On A Fordson Tractor
September 9, 1937 - 116.
Crushing Plant
September 9, 1937 - 117.
Rough grade road
September 9, 1937 - 118.
Fill Slide
September 9, 1937 - 119.
Deep Rock Cut
September 9, 1937 - 120.
Tunnel #2
October 15, 1937 - 121.
Retaining Wall
October 15, 1937 - 122.
Inside of a Tunnel
October 15, 1937 - 123.
Partially Worked Gradient
October 15, 1937 - 124.
Tunnel entrance and culvert headwall
October 15, 1937 - 125.
Men Grading Slope
October 15, 1937 - 126.
Construction - Crusher
October 21, 1937 - 127.
Inside Tunnel #2
November 24, 1937 - 128.
Mountainside
November 24, 1937 - 129.
View of Route 104
November 24, 1937 - 130.
Private Residues in Forest Areas
1938 - 131.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 132.
South wingwall of viaduct during construction
February 15, 1938 - 133.
Stonework on south wingwall of viaduct during construction
February 15, 1938 - 134.
Base of wing wall during construction
March 8, 1938 - 135.
Excessive rock spillage in ravine from cut
March 8, 1938 - 136.
Rock spillage in ravine under structure, foreground
March 8, 1938 - 137.
Piers and south abutment during construction
March 28, 1938 - 138.
North portal of #1 tunnel
April 19, 1938 - 139.
Finish Grading
June 1938 - 140.
Tunnel #2 looking back
June 1938 - 141.
View of road grade
January 24, 1939 - 142.
Tunnel near Buck Creek Gap
January 28, 1939 - 143.
Ice formation taken from viaduct
January 29, 1939 - 144.
Cut at Station 277
February 27, 1939 - 145.
Foundation for wall
February 27, 1939 - 146.
Cleared path
March 31, 1939 - 147.
Wall Site
March 31, 1939 - 148.
Cleared path
March 31, 1939 - 149.
New Cut slope
April 29, 1939 - 150.
Wall Excavation
May 3, 1939 - 151.
Road Construction
May 11, 1939 - 152.
Rock Cut at Station 123-50
May 24, 1939 - 153.
Workers and wall construction
May 24, 1939 - 154.
Rock Drilling
May 24, 1939 - 155.
View of road
August 3, 1939 - 156.
Rock cut
August 8, 1939 - 157.
View of road
August 8, 1939 - 158.
View of road
August 8, 1939 - 159.
Workers at landslide
November 7, 1939 - 160.
Looking south on Parkway
1940 - 161.
Looking north on the Parkway
1940 - 162.
Grade Separation - N.C. Rte. 104: Section and Details Part 3
June 1940 - 163.
Grade Separation - N.C. Rte. 104 Part 1 of 3
June 1940 - 164.
Grade Separation - N.C. Rte. 104 Part 2
June 1940 - 165.
Gutter
June 12, 1940 - 166.
Washed Out Fill
August 16, 1940 - 167.
Firetool box (experimental) Marion Unit No.1
September 17, 1940 - 168.
Overpass ringstones
November 18, 1940 - 169.
Overpass ringstones
November 18, 1940 - 170.
Overpass at Buck Creek Gap
January 21, 1941 - 171.
Rock Wall
February 18, 1941 - 172.
Rock Wall
February 18, 1941 - 173.
Rock Wall
February 18, 1941 - 174.
Overpass at Buck Creek Gap
February 18, 1941 - 175.
Trench
March 28, 1941 - 176.
Buck Creek Gap Overpass
January 1942 - 177.
Buck Creek Gap Overpass
January 1942 - 178.
Buck Creek Gap Overpass
January 1942 - 179.
Buck Creek Gap Overpass
January 1942 - 180.
Buck Creek Gap Overpass
January 1942 - 181.
Overpass Structure, Section 2M
January 1942 - 182.
Rock Embankment
April 10, 1942 - 183.
Rock Embankment
April 10, 1942 - 184.
Fill Slope where Slide Continues, Post Construction
May 6, 1942 - 185.
Removing Rock Slide
July 7, 1942 - 186.
Spreading Calcium Chloride
July 7, 1942 - 187.
Guard post placed by post construction
September 9, 1942 - 188.
Buck Creek Gap Overpass
September 10, 1942 - 189.
Mt. Mitchell thru Buck Creek Cap Overpass
September 10, 1942 - 190.
Buck Creek Gap Overpass
September 10, 1942 - 191.
Parkway crossing county road
October 22, 1942 - 192.
Tunnel Portal
January 6, 1943 - 193.
Tunnel #2. East Portal regular landscape development treatment will be sufficient
May 1943 - 194.
Tunnel #1. West portal. Regular landscape development will be sufficient. Grading and seeding complete
May 1943 - 195.
Tunnel No. 1, East Portal Regular landscape development treatment will be sufficient Grading and seeding complete
May 1943 - 196.
Rock slide before removal
February 28, 1945 - 197.
Proposed Line Change on Parkway
March 29, 1945 - 198.
Proposed Line Change on Parkway
March 29, 1945 - 199.
Shovel Working Construction
April 12, 1945 - 200.
Vista and Management Areas
1946 - 201.
Below Crabtree Falls
June 1946 - 202.
Buck Creek Gap Overpass
June 1946 - 203.
Mount Mitchell from the Blue Ridge Parkway
June 1946 - 204.
Buck Creek Gap Overpass
June 1946 - 205.
Water bound base course
August 12, 1946 - 206.
Rolling and brooming water bound base stone and dust
August 27, 1946 - 207.
NC Route 80
October 24, 1946 - 208.
Parkway near Buck Creek Gap
October 24, 1946 - 209.
Rock Embankment
June 1947 - 210.
Parkway Service Sign
June 12, 1947 - 211.
Inside Tunnel
June 17, 1947 - 212.
NC-80 overpass at Buck Creek Gap
1950s - 213.
Rock Wall, Project 2M2
February 27, 1951 - 214.
Slide Near Crabtree Meadows
November 1951 - 215.
Slide near Crabtree Meadows
November 1951 - 216.
Slide near Crabtree Meadows
November 1951 - 217.
Milepost 354
1952 - 218.
Parkway Land Use Map Section 2-M
1953 - 219.
Black Mountain Orientation Display
March 3, 1956 - 220.
Crabtree Falls
July 1956 - 221.
Camping
July 3, 1956 - 222.
Wildacres Tunnel
April 11, 1957 - 223.
Singecat Ridge
May 5, 1957 - 224.
South Twin Tunnel
June 4, 1957 - 225.
Pump House #88
October 1957 - 226.
Comfort Station #130
October 1957 - 227.
Comfort Station #130
October 1957 - 228.
Comfort Station #132
October 1957 - 229.
Pump House #88
October 1957 - 230.
Picnic Party at Crabtree Meadows
1958 - 231.
Crabtree Falls
1958 - 232.
Crabtree Falls
1958 - 233.
Outdoor Amphitheater, Crabtree Meadows
June 10, 1958 - 234.
Outdoor Amphitheater Crabtree Meadows
June 10, 1958 - 235.
Outdoor Amphitheater, Crabtree Meadows
June 10, 1958 - 236.
Outdoor Amphitheater, Crabtree Meadows
June 10, 1958 - 237.
Temporary Amphitheater, Crabtree Meadows
June 12, 1958 - 238.
Temporary Amphitheater, Crabtree Meadows
June 12, 1958 - 239.
Mount Mitchell
September 1958 - 240.
Camping at Crabtree Meadows Campground
August 22, 1959 - 241.
Camping at Crabtree Meadows Campground
August 22, 1959 - 242.
Camping at Crabtree Meadows Campground
August 22, 1959 - 243.
Crabtree Falls
August 22, 1959 - 244.
Crabtree Falls
August 22, 1959 - 245.
Crabtree Falls
August 22, 1959 - 246.
Singecat Ridge
October 1959 - 247.
Crabtree Falls Nature Walk
1960s - 248.
Karl Synder, Seasonal Interpreter (died 12/12/73)
1960s - 249.
Crabtree Falls Nature Walk
1960s - 250.
Picnic Party
August 1965 - 251.
Ranger Naturalist Edmond Deal giving talk
August 1965 - 252.
District Naturalist Schiffman leading singing
August 1965 - 253.
Picnic Party
August 1965 - 254.
Ranger Naturalist Herb McCullough Cutting Wood for Campfire
August 1965 - 255.
Ranger Naturalist Herb McCullough at Crabtree Amphitheater
August 1965 - 256.
Ranger Naturalist Edmond Deal giving talk
August 1965 - 257.
District Naturalist Schiffman Leading Singing
August 1965 - 258.
Ranger Naturalist Herb McCullough cutting wood for campfire
August 1965 - 259.
Parkway and N.C. 80 at Buck Creek Gap
August 1971 - 260.
Overpass Over NC 80
August 1971 - 261.
Twin Tunnels, MP 344.7
August 1971 - 262.
Twin Tunnels
August 1971 - 263.
Karl Snyder (Died 12/12/73) Seasonal Interpreter
July 1973 - 264.
Karl Snyder
July 1973 - 265.
Crabtree Meadows campers
July 13, 1973 - 266.
Crabtree Meadows Campers
July 13, 1973 - 267.
Paul Miller, Student Minister
July 24, 1973 - 268.
Paul Miller, Student Minister
July 24, 1973 - 269.
Christian Ministry
July 24, 1973 - 270.
Paul Miller, Student Minister
July 24, 1973 - 271.
Paul Miller, Student Minister
July 24, 1973 - 272.
Crabtree Meadows Coffee Shop, exterior
July 28, 1973 - 273.
Crabtree Meadows Shop (exterior)
July 28, 1973 - 274.
Crabtree Meadows Coffee Shop (Exterior)
July 28, 1973 - 275.
Crabtree Meadows Coffee
July 28, 1973 - 276.
Crabtree Meadows - Milepost 339.l5
July 31, 1973 - 277.
Crabtree Meadows
July 31, 1973 - 278.
Crabtree Meadows
July 31, 1973 - 279.
Crabtree Meadows Campers
July 31, 1973 - 280.
Twin Tunnels - Milepost 344.5
July 31, 1973 - 281.
Interpretative Walk
August 1973 - 282.
Construction Signs
September 18, 1973 - 283.
Construction Signs
September 18, 1973 - 284.
Construction Signs
September 18, 1973 - 285.
Construction Work
September 18, 1973 - 286.
Construction Work
September 18, 1973 - 287.
Construction Work
September 18, 1973 - 288.
Construction Signs
September 18, 1973 - 289.
Construction Work
September 18, 1973 - 290.
Construction Work
September 18, 1973 - 291.
Bridge over N.C. State Route 80
October 21, 1973 - 292.
New Retaining Wall
November 28, 1973 - 293.
New Retaining Wall
November 28, 1973 - 294.
Twin Tunnels
March 1974 - 295.
Rock Cut
March 1974 - 296.
New Wall by Laurel Mtn.
April 1974 - 297.
New Wall by Laurel Mtn.
April 1974 - 298.
New Wall by Laurel Mtn.
April 1974 - 299.
New trailer in Park
April 30, 1974 - 300.
Strange Growth in Tree
April 30, 1974 - 301.
Dogwood Tree
April 30, 1974 - 302.
New septic tanks
April 30, 1974 - 303.
New trailer in Park
April 30, 1974 - 304.
Strange growth in tree
April 30, 1974 - 305.
New park ranger booth - Crabtree
July 4, 1974 - 306.
Rhododendron in campground-trailer park
July 15, 1974 - 307.
Amphitheater Program, Seasonal Interpreter Peggy Thom, VIP Mike Hensley
August 1974 - 308.
Amphi. Program, VIP Mike Hensley
August 1974 - 309.
Amphi. Program, Mt. Culture
August 1974 - 310.
Crabtree Meadows Restaurant
August 1974 - 311.
Amphi. Program VIP Mike Hensley Sea. Int. Peggy Thompson
August 1974 - 312.
Crabtree Meadow Campground
August 1974 - 313.
Crabtree Meadows Restaurant
August 1974 - 314.
Crabtree Meadows Restaurant
August 1974 - 315.
Amphi. Program
August 1974 - 316.
Amphi. Program Sea. Int. Peggy Thompson
August 1974 - 317.
Amphi. Program
August 1974 - 318.
Crabtree Meadows Campground Sign
August 1974 - 319.
Crabtree Meadows Campground
August 1974 - 320.
Amphi. Program Sea. Int. Peggy Thompson VIP Mike Hensley
August 1974 - 321.
Amphi. Program
August 1974 - 322.
Crabtree Meadow Picnicing
August 1974 - 323.
Amphi. Program Sea. Int. Peggy Thompson
August 1974 - 324.
Crabtree Meadows Restaurant
August 1974 - 325.
Crabtree Meadows Campground Gas Station
August 1974 - 326.
Amphi. Program Peggy Thompson Sea. Int.
August 1974 - 327.
Amphi. Program
August 1974 - 328.
Amphi. Program Sea. Int. Peggy Thompson
August 1974 - 329.
Amphi. Program VIP Mike Hensley
August 1974 - 330.
Amphi. Program
August 1974 - 331.
Crabtree Meadows Restaurant
August 1974 - 332.
Crabtree Meadows Restaurant
August 1974 - 333.
Crabtree Meadows Campground Gas Station
August 1974 - 334.
Amphi Program
August 1974 - 335.
Crabtree Meadows Campground Gas Station
August 1974 - 336.
Crabtree Meadows Campground Gas Station
August 1974 - 337.
Amphi. Program Sea. Int. Peggy Thompson VIP Mike Hensley
August 1974 - 338.
Amphi. Program Sea. Int. Peggy Thompson
August 1974 - 339.
Ranger Jim Weedy singing in camper
August 9, 1974 - 340.
Camper and Dog at Crabtree
August 9, 1974 - 341.
Ranger Larry Scott on Nature Hike
August 9, 1974 - 342.
Crabtree Meadows Gas Station
September 1974 - 343.
Shufford Log Barn Bldg. #593
August 21, 1975 - 344.
Shufford Log Spring House - Bldg. #594
August 21, 1975 - 345.
Shufford Log Barn Bldg. #593
August 21, 1975 - 346.
Shufford Log Spring House - Bldg. #594
August 22, 1975 - 347.
Shufford Log Cabin - Bldg. #616
August 22, 1975 - 348.
Shufford Log Barn - Bldg. #616
August 22, 1975 - 349.
Shufford Log Barn Bldg. #593
August 22, 1975 - 350.
Shufford Log Barn - Bldg. #593
August 22, 1975 - 351.
Shufford Double Pen Log Barn Bldg 596
1976 - 352.
Shufford cabin (ruins) Bldg #616 (NW)
April 1977 - 353.
Shufford Barn (SW), Bldg. #616
April 1977 - 354.
Shufford Cabin (NW), Ruins, Bldg. #616
April 1977 - 355.
Shufford Cabin (Ruins) - Bldg. #616
April 1977 - 356.
Shufford double pen log barn (N. crib corner) - Bldg #593
April 1977 - 357.
Shufford Double Pen Log Barn (S. Crib Corner) - Bldg. #593
April 1977 - 358.
Shufford Springhouse - Bldg #594
April 1977 - 359.
Shufford springhouse (N) - Bldg #594
April 1977 - 360.
Shufford Springhouse (S) - Bldg #594
April 1977 - 361.
Shufford Spring House Bldg. #594
April 1977 - 362.
Shufford Cabin (Ruins) SE Bldg. #616
April 1977 - 363.
Shufford Barn Bldg 593
April 1977 - 364.
Shufford barn (SE) Bldg #593
April 1977 - 365.
Shufford Barn Bldg. #593
April 1977 - 366.
Shufford Springhouse (E) Bldg #594
April 1977 - 367.
Shufford Springhouse (W) Bldg #594
April 1977 - 368.
Roadside signs
June 1977 - 369.
Roadside Sign
June 1977 - 370.
Roadside sign
June 1977 - 371.
Roadside Sign
June 1977 - 372.
Roadside signs
June 1977 - 373.
Taping Road Barriers
October 25, 1977 - 374.
Rockslide
October 25, 1977 - 375.
Ranger Assisting Camper
July 1978 - 376.
Rangers Checking Engines on Trucks
July 1978 - 377.
Ranger Assisting Camper
July 1978 - 378.
Road Sign Along Parkway
July 1978 - 379.
Rangers checking engines on trucks
July 1978 - 380.
Ranger Assisting Camper
July 1978 - 381.
Ranger assisting camper
July 1978 - 382.
Ranger Assisting Camper
July 1978 - 383.
Campers with trailer
July 1978 - 384.
Refilling Box with Disposal Bags for Campers
July 1978 - 385.
Ranger assisting camper
July 1978 - 386.
Refilling box with disposable bags for campers
July 1978 - 387.
Karl Snyder Seasonal Interpreter
- 388.
Land Acquisition Maps Section 2-M
- 389.
Shufford Cabin Bldg #616
- 390.
Crabtree Falls Nature Walk
- 391.
Shufford Log Barn Bldg. #593
- 392.
Crabtree Meadows Service Center
- 393.
Tunnel
- 394.
Black Mt. Range
Refine Your Search
Types (3)
Photographs (386) Maps (5) Drawings, Plans, and Projections (3)Locations (13)
Section 2M (173) Crabtree Meadows (119) Milepost 340 (30) Buck Creek Gap (23) Milepost 345 (9) Twin Tunnel #2 (8) Milepost 344 (7) Milepost 346 (6) Milepost 347 (6) Big Laurel Mountain Viaduct (4) See All ResultsSections (1)
2M (394)Counties (2)
Yancey (222) McDowell (164)



