Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Southeast wing wall
August 4, 1936 - 2.
Southwest wing wall
August 4, 1936 - 3.
Grade separation Class B masonry and concrete barrel
July 1, 1938 - 4.
Grade separation, south elevation
July 1938 - 5.
Before grading operation and clean-up, looking north
October 18, 1938 - 6.
Spandrel Wall - Rubble wing wall and concrete vault
October 18, 1938
Refine Your Search
Types (1)
Photographs (6)Locations (2)
Milepost 230 (4) Milepost 231 (2)Sections (1)
2B (6)Counties (1)
Alleghany (6)



