Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Early Construction
July 30, 1937 - 2.
Soil Erosion
1941 - 3.
Gully control (afer)
July 26, 1941 - 4.
Gully control (after)
July 26, 1941 - 5.
Gully control (after)
July 26, 1941 - 6.
Gully control (after)
July 26, 1941 - 7.
Gully control (after) Beng, N.C.
November 1941 - 8.
Shows active gully and sheet erosion (before)
November 1941 - 9.
Gully and Sheet Erosion
July 1, 1942 - 10.
"Before picture" shows close-up of severe sheet erosion. "After picture" neg #5443
August 1944 - See All Results
Refine Your Search
Types (1)
Photographs (12)Locations (3)
Milepost 268 (6) Section 2E (5) Daniels Gap (1)Sections (1)
2E (12)Counties (1)
Ashe (12)



