Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Soil Erosion
1941 - 2.
Back of wall. Sample section of guard wall
July 1, 1941 - 3.
Top and inside of wall. Sample section of guard wall.
July 1, 1941 - 4.
Gully control (after)
July 26, 1941 - 5.
Gully control (afer)
July 26, 1941 - 6.
Gully control (after)
July 26, 1941 - 7.
Gully control (after)
July 26, 1941 - 8.
Shows active gully and sheet erosion (before)
November 1941 - 9.
Gully and sheet erosion (mulching with pine)
November 1941 - 10.
Gully control (after) Beng, N.C.
November 1941 - See All Results
Refine Your Search
Types (1)
Photographs (11)Locations (3)
Milepost 268 (8) Milepost 263 (2) Section 2E (1)Sections (1)
2E (11)Counties (1)
Ashe (11)



