Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Before flood and P.R.A. regrading
September 25, 1939 - 2.
60 foot cut Great quantities of natural ground water have caused much trouble in this cut
July 8, 1940 - 3.
60 foot cut: Great quantities of natural ground water cause trouble in this cut
July 26, 1940 - 4.
Flood Damage
August 17, 1940 - 5.
Gully and sheet erosion (mulching with pine)
November 1941
Refine Your Search
Types (1)
Photographs (5)Locations (3)
Milepost 268 (2) Milepost 269 (2) Milepost 276 (1)Sections (1)
2E (5)Counties (3)
Ashe (2) Wilkes (2) Watauga (1)



