Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
SHERANDO Lake site at National Forest Recreation Area
June 1934
-
Slope for Experiments 1 and 3 during scaling operations
July 23, 1943
-
Slope for experiments 2 and 4 before work was done
July 23, 1943
-
Experiment 2 after holes were silled with sawdust and earth. Note earth being lost on slope from rounding
July 26, 1943
-
Holes for root planting, lower portion of cut to be seeded
July 27, 1943
-
Experiment 1 after scaling and partial trenching
July 28, 1943
-
Experiment 3 slope after scaling and rounding, lime being applied
July 28, 1943
-
Experiment 1 with mulch placed between trenches
July 31, 1943
-
Experiment 1 completed
August 10, 1943
-
Experiment 4 completed
August 10, 1943
Items in Query
Results: 12
Refine Your Search
Types (1)
Photographs (12)Locations (4)
Milepost 7 (5) Section 1C (5) Milepost 10 (1) Sherando Lake Recreation Area (1)Sections (1)
1C (12)Counties (1)
Augusta (12)