Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Retaining Wall
1940 - 2.
Heavy Slide
1940 - 3.
Tree Cutting Illegal
1940s - 4.
Heavy Fill
1940 - 5.
Goshen Creek Viaduct
1940s - 6.
Heavy Fill
1940 - 7.
Grading
1940 - 8.
Culvert Headwall
1940 - 9.
Cragg Cabin
1940s - 10.
Site of future overpass at Station 477
July 27, 1940 - 11.
12' x 12' Box Culvert at Station 347
July 27, 1940 - 12.
View into Blowing Rock town dump
July 27, 1940 - 13.
View from Blowing Rock town dump
July 27, 1940 - 14.
Showing Location of Blowing Rock town dump
July 27, 1940 - 15.
Use made of land adjacent to Parkway during 1940 construction
July 27, 1940 - 16.
Future Parkway Underpass Site at Aho Station
July 27, 1940 - 17.
Wall detail
July 27, 1940 - 18.
View from Blowing Rock Town Dump
July 27, 1940 - 19.
Box Culvert
July 27, 1940 - 20.
Shouls Creek during high water
August 17, 1940 - 21.
Showing the condition caused by the rains of August 13,1940.
August 17, 1940 - 22.
Blowing Rock Town power dam broken by rains of Aug 13, 1940
August 17, 1940 - 23.
After rains of August 13, 1940
August 18, 1940 - 24.
12' x 12' box culvert
October 1, 1940 - 25.
Stream Relocation
October 1, 1940 - 26.
Connection of Parkway with County Road to Blowing Rock
October 1, 1940 - 27.
Stream Relocation
October 1, 1940 - 28.
Location of Proposed Parking Area
October 1, 1940 - 29.
Location of proposed parking area
December 1, 1940 - 30.
12" x 12" box culvert
December 1, 1940