Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Bank Sloping
1930s - 2.
Before seeding and planting
1930s - 3.
Rock Embankment
1930s - 4.
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935 - 5.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 6.
Coarse Stone Road in Section 2A
June 23, 1936 - 7.
Handlaid rock embankment
August 14, 1936 - 8.
Hand-laid rock embankment detail
August 14, 1936 - 9.
Hand-laid rock embankment construction
August 14, 1936 - 10.
Early Construction
August 20, 1936 - See All Results
Refine Your Search
Types (1)
Photographs (41)Locations (24)
Grandfather Mountain (4) Milepost 229 (3) Milepost 263 (3) Milepost 270 (3) Milepost 312 (3) Milepost 237 (2) Milepost 262 (2) Section 2A (2) Section 2C (2) Section 2M (2) See All ResultsSections (13)
2E (9) 2A (5) 2C (5) 2J (5) 2H (4) 2B (2) 2M (2) 2R (2) 2Y (2) 1D (1) 1P (1) 1Q (1) 2L (1)Counties (11)
Alleghany (12) Avery (9) Ashe (5) Wilkes (3) Buncombe (2) Franklin (2) Jackson (2) Yancey (2) Henderson (1) Nelson (1) See All Results