Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Bridge at site #7 Steel construction, looking back from south abutment
March 29, 1937 - 2.
Underside of Viaduct
May 18, 1937 - 3.
Pier #1
June 22, 1937 - 4.
Station 15# Pier #4
June 22, 1937 - 5.
Viaduct, form work pier #3
July 7, 1937 - 6.
Viaduct, form work, pier #3
July 7, 1937 - 7.
Detail, interior face vaneer wing wall Viaduct
July 7, 1937 - 8.
Viaduct, Pier #4
July 7, 1937 - 9.
Viaduct Pier #4
September 12, 1937 - 10.
Viaduct pier #4
September 12, 1937 - See All Results
Refine Your Search
Types (2)
Photographs (49) Oral Histories (1)Locations (13)
Laurel Fork Viaduct (19) Linn Cove Viaduct (8) Grandfather Mountain (5) Big Laurel Mountain Viaduct (4) Milepost 225 (3) Milepost 305 (2) Section 2K (2) Beacon Heights (1) Crabtree Meadows (1) Goshen Creek Viaduct (1) See All ResultsSections (8)
2D (19) 2H (16) 2M (5) 2A (3) 2F (2) 2K (2) 2C (1) 2J (1)Counties (5)
Ashe (19) Avery (17) McDowell (7) Alleghany (4) Watauga (2)



