Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Before grading. Gullies and cave-ins. Slope too steep.
July 25, 1935 - 2.
Before grading. Deep gullies in erosive soil. Need flattening and rounding. Contour ditches required above.
July 25, 1935 - 3.
Before grading. Gullies in fill. Soil erosive. Needs flattening.
July 25, 1935 - 4.
Before grading. Detail showing depth of gullies in erosive soil. Rock decomposed into sand.
July 25, 1935 - 5.
General ground conditions, showing erosion
April 16, 1936 - 6.
General ground conditions, showing cut-over ground and erosion, also pine coming back.
April 16, 1936 - 7.
Log Cribbing and Check Dams for Erosion Control
May 25, 1936 - 8.
Log Cribbing and Check Dams for Erosion Control
May 26, 1936 - 9.
Log cribbing and check dams for erosion control
May 26, 1936 - 10.
Log cribbing and check for erosion control
May 26, 1936 - See All Results
Refine Your Search
Types (2)
Photographs (63) Oral Histories (1)Locations (33)
Asheville (7) Milepost 268 (6) Milepost 158 (5) Section 2E (4) Cumberland Knob (3) Milepost 264 (3) Milepost 225 (2) Milepost 226 (2) Milepost 229 (2) Milepost 242 (2) See All ResultsSections (10)
2E (20) 2A (13) 2C (8) 2R (7) 1R (5) 2K (3) 1V (2) 2D (2) 2H (2) 2N (2)Counties (9)
Alleghany (20) Ashe (13) Wilkes (10) Buncombe (8) Floyd (5) Avery (4) Carroll (2) McDowell (1) Yancey (1)



