Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
- 1.
Dam
May 19, year unknown - 2.
Bridge
October 6, year unknown - 3.
Type #1 headwall, single
April 16, 1936 - 4.
Right Head Wall 289
October 28, 1936 - 5.
Bridge #9 Abutment
October 29, 1936 - 6.
Sample Wall
November 6, 1936 - 7.
Bridge Construction
December 1, 1936 - 8.
Bridge Construction
December 1, 1936 - 9.
Grade separation Class B masonry and concrete barrel
July 1, 1938 - 10.
Spandrel Wall - Rubble wing wall and concrete vault
October 18, 1938 - See All Results
Refine Your Search
Types (1)
Photographs (28)Locations (14)
Section 2G (5) Milepost 230 (4) Milepost 296 (4) Section 2A (4) Flat Top Mountain (N.C.) (2) Beacon Heights (1) Grandfather Mountain (1) Linn Cove Viaduct (1) Milepost 225 (1) Milepost 240 (1) See All ResultsSections (7)
2G (13) 2A (5) 2B (4) 2C (2) 2H (2) 2J (1) 2M (1)Counties (4)
Watauga (13) Alleghany (11) Avery (3) Yancey (1)



