Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Pipeline
August 17, 1936
-
Stone masonry wall
August 23, 1936
-
Gutter termination at pipe headwall
October 13, 1936
-
Work on Culvert
October 28, 1936
-
Drill Operation
April 22, 1937
-
Bridge - Grassy Gap Road
March 12, 1938
-
Pipeline
April 28, 1955
-
Drainage Construction
May 29, 1956
Page 1 of 1.
Items in Query
Results: 8
Refine Your Search
Types (1)
Photographs (8)Locations (6)
Section 2A (2) Section 2M (2) Doughton Park (1) Milepost 228 (1) Milepost 292 (1) Section 2G (1)Sections (5)
2A (3) 2M (2) 2C (1) 2G (1) 2H (1)Counties (3)
Alleghany (4) Watauga (2) Yancey (2)