Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Flood damage. Gutter washed in and across road.
August 16, 1940
-
Road washed out
August 16, 1940
-
Block of road entirely removed by terrific stream of water
August 16, 1940
-
Road and Fill Wash
August 16, 1940
-
Before Planting, Section 2J
October 1946
-
Construction
November 29, 1973
-
Construction
November 29, 1973
-
Grandfather Mt. Connector Aerial photo
August 31, 1976
-
Construction at Grandfather
September 22, 1979
-
Aerials of Construction at Grandfather Mtn.
September 22, 1979
Items in Query
Results: 11
Refine Your Search
Types (1)
Photographs (11)Locations (6)
Grandfather Mountain (5) Milepost 319 (2) Linn Cove Viaduct (1) Milepost 307 (1) Milepost 308 (1) Section 2J (1)Sections (3)
2H (6) 2J (3) 2K (2)Counties (1)
Avery (11)