Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Rail yard and sample fence
January 1943
-
Wood flume and box to take surface water from shoulder berms
July 15, 1943
-
Flume emptying into inlet, at junction of Parkway and Route 609 [610]
July 15, 1943
-
Flume inlet detail
July 15, 1943
-
Slope for experiments 2 and 4 before work was done
July 23, 1943
-
Slope for Experiments 1 and 3 during scaling operations
July 23, 1943
-
Experiment 2 after holes were silled with sawdust and earth. Note earth being lost on slope from rounding
July 26, 1943
-
Holes for root planting, lower portion of cut to be seeded
July 27, 1943
-
Experiment 3 slope after scaling and rounding, lime being applied
July 28, 1943
-
Experiment 1 after scaling and partial trenching
July 28, 1943
Items in Query
Results: 26
Refine Your Search
Types (1)
Photographs (26)Locations (7)
Rockfish Gap (8) Section 1C (8) Milepost 7 (4) Rockfish Gap Overpass (2) Section 1B (2) Humpback Rocks Visitor Center and Mountain Farm (1) Milepost 6 (1)Sections (2)
1B (13) 1C (13)Counties (1)
Augusta (26)