Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Gully control (after)
July 26, 1941
-
Gully control (after)
July 26, 1941
-
Gully control (after)
July 26, 1941
-
Gully control (afer)
July 26, 1941
-
Gully and sheet erosion (work started)
November 1941
-
Gully and sheet erosion (mulching with pine)
November 1941
-
Gully control (after) Beng, N.C.
November 1941
-
Shows active gully and sheet erosion (before)
November 1941
-
Gully and Sheet Erosion
July 1, 1942
-
Gully and sheet erosion, large pasture with active sheet erosion.
September 1942
Items in Query
Results: 12
Refine Your Search
Types (1)
Photographs (12)Locations (4)
Milepost 268 (8) Section 2E (2) Daniels Gap (1) Milepost 261 (1)Sections (2)
2E (11) 2D (1)Counties (1)
Ashe (12)