Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Soil Erosion
1941
-
Gully control (after)
July 26, 1941
-
Gully control (after)
July 26, 1941
-
Gully and sheet erosion (work started)
November 1941
-
Gully and sheet erosion (mulching with pine)
November 1941
-
Gully control (after) Beng, N.C.
November 1941
-
Shows active gully and sheet erosion (before)
November 1941
-
Gully and Sheet Erosion
July 1, 1942
-
Gully and sheet erosion, large pasture with active sheet erosion.
September 1942
-
Gully and sheet erosion
August 1944
Items in Query
Results: 13
Refine Your Search
Types (1)
Photographs (13)Locations (4)
Milepost 268 (6) Section 2E (4) Milepost 261 (2) Daniels Gap (1)Sections (2)
2E (11) 2D (2)Counties (1)
Ashe (13)