Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Tuggle Gap/Crossing
1936
-
View of Tuggles Gap crossing of parkway with Virginia Route No. 8
July 1936
-
Left slope - original grading
July 10, 1936
-
Laurel in bloom
June 9, 1937
-
Covering of spills stone and oil with soil
October 1938
-
Cur [cuts] during grading operations
1939
-
Cut bank before grading
1939
-
Cuts during grading
1939
-
Early Construction
October 1, 1937
Page 1 of 1.
Items in Query
Results: 9
Refine Your Search
Types (1)
Photographs (9)Locations (3)
Milepost 165 (4) Section 1R (4) Shortts Knob Overlook (1)Sections (1)
1R (9)Counties (2)
Floyd (5) Patrick (4)