Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Overpass location at Benge (back)
June 19, 1935 -
North end of former tunnel
November 5, 1938 -
Shed Former owner Don Bare
January 20, 1939 -
Before flood and P.R.A. regrading
September 25, 1939 -
Gully control (after)
July 26, 1941 -
Gully control (afer)
July 26, 1941 -
Gully control (after)
July 26, 1941 -
Gully control (after)
July 26, 1941 -
Shows active gully and sheet erosion (before)
November 1941 -
Gully control (after) Beng, N.C.
November 1941
Items in Query
Results: 12
Refine Your Search
Types (1)
Photographs (12)Locations (1)
Milepost 268 (12)Sections (1)
2E (12)Counties (1)
Ashe (12)



