Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935
-
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935
-
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935
-
First Gradeing Contract
September 1935
-
First Grading Contract
September 1935
-
First Grading Contract
September 1935
-
Road Grade near NC Route 18
October 4, 1936
-
Cut Ditch and Bank
October 28, 1936
-
Rough Grade Rock Fill
April 14, 1937
-
Preparing Sub-Grade
April 14, 1937
Items in Query
Results: 29
Refine Your Search
Types (1)
Photographs (29)Locations (16)
Milepost 218 (3) Milepost 232 (3) Milepost 239 (3) Section 2C (3) Milepost 224 (2) Milepost 227 (2) Milepost 229 (2) Milepost 240 (2) Section 2A (2) Devil's Garden (1) Mahogany Rock (1) Milepost 219 (1) Milepost 226 (1) Milepost 238 (1) Milepost 241 (1) Milepost 247 (1)Sections (3)
2A (14) 2C (11) 2B (4)Counties (1)
Alleghany (29)