Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
SHERANDO Dam site proposed lake at National Forest Recreation Area
June 1934
-
SHERANDO Lake site at National Forest Recreation Area
June 1934
-
Fill after grading and seeding
November 6, 1942
-
Rail yard and sample fence
January 1943
-
Slope for Experiments 1 and 3 during scaling operations
July 23, 1943
-
Experiment 2 after holes were silled with sawdust and earth. Note earth being lost on slope from rounding
July 26, 1943
-
Holes for root planting, lower portion of cut to be seeded
July 27, 1943
-
Experiment 3 slope after scaling and rounding, lime being applied
July 28, 1943
-
Experiment 3 completed
July 30, 1943
-
Experiment 1 with mulch placed between trenches
July 31, 1943
Items in Query
Results: 25
Refine Your Search
Types (1)
Photographs (25)Locations (9)
Section 1C (7) Milepost 7 (4) Milepost 6 (3) Ravens Roost Overlook (3) Milepost 10 (2) Milepost 15 (2) Sherando Lake Recreation Area (2) Greenstone Overlook (1) Milepost 9 (1)Sections (1)
1C (25)Counties (1)
Augusta (25)