Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Bridge Tunnel
May 23, 1936
-
Bridge Construction
May 23, 1936
-
Heavy Machinery and Construction
May 23, 1936
-
View of Machined-Flattened Parkway
July 22, 1936
-
Early Construction of Bridge in Section 2A
July 22, 1936
-
Shovel loading
July 23, 1936
-
Early Construction
July 23, 1936
-
Mountain slope and construction
August 20, 1936
-
Bridge 4, excavation site
August 22, 1936
-
Ahead at site of excavation for bridge #4.
August 22, 1936
Items in Query
Results: 81
Refine Your Search
Types (1)
Photographs (81)Locations (20)
Section 2C (30) Section 2A (18) Milepost 238 (6) Milepost 217 (3) Milepost 218 (3) Brinegar Cabin (2) Doughton Park (2) Milepost 224 (2) Milepost 225 (2) Milepost 228 (2) Milepost 230 (2) Bluffs (1) Milepost 220 (1) Milepost 221 (1) Milepost 223 (1) Milepost 226 (1) Milepost 227 (1) Milepost 237 (1) Milepost 242 (1) Section 2B (1)Sections (3)
2C (43) 2A (35) 2B (3)Counties (1)
Alleghany (81)