Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
Shovel loading
July 23, 1936
-
mixer
July 28, 1936
-
Roadway
July 29, 1936
-
Ahead at site of excavation for bridge #4.
August 22, 1936
-
Bridge 4, excavation site
August 22, 1936
-
Bridge and Abutment Construction
August 22, 1936
-
View looking south along Ice Rock section of parkway
September 11, 1936
-
Access Road Construction
October 2, 1936
-
Road Grade near NC Route 18
October 4, 1936
-
Construction of prop. wall
October 4, 1936
Items in Query
Results: 55
Refine Your Search
Types (1)
Photographs (55)Locations (18)
Section 2C (17) Section 2A (16) Brinegar Cabin (2) Doughton Park (2) Milepost 218 (2) Milepost 220 (2) Milepost 224 (2) Milepost 228 (2) Bluffs (1) Cumberland Knob (1) Milepost 217 (1) Milepost 219 (1) Milepost 221 (1) Milepost 225 (1) Milepost 227 (1) Milepost 229 (1) Milepost 241 (1) Milepost 242 (1)Sections (2)
2A (31) 2C (24)Counties (1)
Alleghany (55)