Driving Through Time - The Digital Blue Ridge Parkway
Search Results:
-
A & W grader - grading overburden
1930s -
Before grading. Showing objectionable effect of uniform slopes and insufficient rounding
July 25, 1935 -
Before grading. Soft gullying material above rock. Flatten expose hard rock. Wide rounding.
July 25, 1935 -
Before grading. Washout ditch filled; needs transition, rounding, and drainage structure.
July 25, 1935 -
First Gradeing Contract
September 1935 -
First Gradeing Contract
September 1935 -
First Grading Contract
September 1935 -
Rough Grading Partially Complete
August 25, 1936 -
Road grading
September 25, 1936 -
Road Grade near NC Route 18
October 4, 1936
Items in Query
Results: 67
Refine Your Search
Types (1)
Photographs (67)Locations (40)
Milepost 167 (7) Milepost 218 (3) Milepost 232 (3) Milepost 239 (3) Milepost 417 (3) Section 2C (3) Section 2F (3) Section 2M (3) Balsam Gap (2) Milepost 224 (2) Milepost 227 (2) Milepost 229 (2) Milepost 240 (2) Milepost 347 (2) Section 2A (2) Devil's Garden (1) Grandfather Mountain (1) Mahogany Rock (1) Milepost 15 (1) Milepost 162 (1) Milepost 164 (1) Milepost 219 (1) Milepost 226 (1) Milepost 235 (1) Milepost 238 (1) Milepost 241 (1) Milepost 247 (1) Milepost 259 (1) Milepost 264 (1) Milepost 266 (1) Milepost 271 (1) Milepost 292 (1) Milepost 308 (1) Milepost 309 (1) Milepost 317 (1) Milepost 346 (1) Milepost 360 (1) Section 1E (1) Section 1S (1) Section 2G (1)Sections (17)
2A (14) 2C (11) 1S (8) 2M (6) 2B (5) 2E (3) 2F (3) 2J (3) 2U (3) 1R (2) 2H (2) 2X (2) 1C (1) 1E (1) 2D (1) 2G (1) 2P (1)Counties (13)
Alleghany (29) Patrick (8) Watauga (5) Avery (4) Wilkes (4) Yancey (4) Transylvania (3) Floyd (2) Haywood (2) Ashe (1) Augusta (1) Buncombe (1) Rockbridge (1)